Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Landsat Monitoring Of The Navajo Coal Surface MineBy Michael H. Inglis
The Technology Application Center, in conjunction with the U.S. Bureau of Mines Liaison Program, is studying the use of Landsat data for the monitoring of coal surface mine reclamation activities. Lan
Jan 1, 1979
-
Limestone Scrubbing For High Sulfur Coal ? IntroductionBy Robert E. Barry
For new coal-fired power plants, federal regulations require that emissions of sulfur dioxide be limited to 1.2 pounds for every million BTU'S burned. This is equivalent to coal with a sulfur con
Jan 1, 1974
-
Mid-Continent's Unit Train Loading Facility - IntroductionBy John A. Reeves
The unit-train concept of moving raw materials .is considered by many railroad men as the most signifigant contribution to reducing rail freight costs since the introduction of the diesel locomotive.
Jan 1, 1969
-
Characterizing Radio Emissions From Electronic Systems Used In Underground Coal Mines - SME Annual Meeting 2023By C. Zhou, J. Srednicki
Electronic systems have been increasingly used in underground mines to improve mine safety. These electronic systems emit electromagnetic (EM) energy which can adversely impact the performance of othe
Feb 1, 2023
-
Investigation of Acoustic Emissions and Friction Behavior in a Two-phase Flow with Different Sand Content - Mining, Metallurgy & Exploration (2023)By Sunny Schoone, Maximilian Getz, Felix Leaman, ELISABETH CLAUSEN
Jan 5, 2023
-
Altos Hornos De Mexico Concentrator And Pelletizing Plant, Circular Grate Design And Operational ConceptsBy S. S. Sephton
The La Perla Mine, owned by Altos Hornos de Mexico, S.A., is located approximately 100 miles east of the City of Chihuahua in the State of Chihuahua, Mexico. The mine began operations in 1958. Existin
Jan 1, 1972
-
Concentradora ?Do[n]a Aida? Design, Construction And Operation CostsBy Adrian C. Dorenfeld
Concentradora "Dana Aida" (100 t/d capacity) was built in 1971-1972 to treat dumps and ores containing mixed oxide-sulfide copper-gold-silver minerals from two veins. The veins, Don Felipe and aria ar
Jan 1, 1979
-
The Effect And Limits Of Particle Size In The Complete Leaching Of Sulphide Minerals In Dump Leaching OperationsBy A. S. Atkins
The interest in the use of micro- organisms in the leaching of sulphide minerals has been traditionally exploited as a scavenger process for the recovery of valuable metal by- products from waste ore
Jan 1, 1984
-
Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021By Rainer Antretter
While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under
Jun 13, 2021
-
Major Chances In Capital Goods Used In Underground Production Of Bituminous CoalBy George H. K. Schenck
It seems appropriate to review the history of mechanization of our underground coal mines at this time when many favorable flags are flying for this industry. It is a reasonable hope that such a revie
Jan 1, 1968
-
Pebble Grinding At Bethlehem Copper Corporation Ltd. ? IntroductionBy C. W. Overton
The operations of Bethlehem Copper are situated in the south-central interior of British Colombia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through A
Jan 1, 1973
-
Floor Failure Characteristics of Thick Coal Seam Mining Above Confined AquiferBy Chuang Sun, Feng Luo, Guo‑dong Li, Xue‑qing Li, Tuan He
The mining-induced failure of the coal seam floor is essential for water inrush. The mining disturbance to the floor, especially in the thick coal seam, is severe, and the water inrush risk is also hi
Jun 8, 2022
-
Management of Obstructions and Adverse Ground Conditions: SCL Tunnel Works on Crossrail C300/410By Olivia Perkins, Shawn Sismondi, Adrian St. John, Vicky Potts
"INTRODUCTION An inherent aspect of any tunnelling project is ground risk: how it is identified, quantified and managed throughout the various stages of a project. Early identification of these risks,
Jan 1, 2016
-
New Waterproof Shaft Lining Concept For Frozen Ground Applications ? IntroductionBy B. T. Stanley
Traditional methods of creating a water tight shaft liner involve the use of segmented or welded steel. When shafts are located in ground that exhibits extremely difficult conditions of high water in
Jan 1, 2012
-
Correlation Between Froth Viscosity And Flotation Efficiency (PREPRINT NUMBER 92-159)The amount of hydrophobic materials constituting the mineral froth strongly influences the froth viscosity. Higher froth viscosity on the other hand can retard the drainage of physically carried over
Jan 1, 1992
-
An Update On Chloride Hydrometallurgical Processes For Sulfide Concentrates ? IntroductionBy Kenneth J. Edmiston
The objectives of this paper are: to review the current status of chloride leach processes for sulfide concentrates, to make an evaluation as to the applicability of chloride leaching for replacing py
Jan 1, 1984
-
Design Of The Sacaton Concentrator - Design ConsiderationsBy Dennis K. Mortensen
The warm southwestern desert of Arizona is an ideal location for ASARCO's new Sacaton Unit. The climate of this arid region played a major role in the design considerations of the Unit's cru
Jan 1, 1974
-
A Geostatistical Solution to Estimating Groundwater Inflows in Deep Rock Tunnels with Validation Through Case Studies "Mining, Metallurgy & Exploration (2021)"By MARK J. VANARELLI
Estimating groundwater inflows in rock deep tunnels is critical to the safety of personnel constructing the tunnel and the cost of construction. This paper presents two case studies for estimating ste
Oct 9, 2020
-
Pressure Balancing Techniques to Control Spontaneous CombustionBy C. Bateman, F. Calizaya
"This study presents the results of three laboratory experiments on pressure balancing carried out at the University of Utah’s coal mine ventilation model. The model includes simulations of two workin
Jan 1, 2016
-
High Intensity Wet Magnetic Separation Research At Climax ? IntroductionBy T. E. Masoner
The struggle to get the minerals industry seriously interested in high intensity wet magnetic separation* has been difficult. The high capital cost of the equipment, the lack of basic research, the la
Jan 1, 1968