Analysis of Structural Capacity and Stiffness of Drilled Shafts with Construction Defects and RepairsBy John P. Turner, Benjamin J. Turner
"Non-destructive testing and evaluation (NDT/NDE) methods have become standard tools as part of the post-construction quality assurance of drilled shaft foundations. In responding to anomalies, founda
Jan 1, 2016
-
San Francisco International Airport Air Traffic Control Tower Pile FoundationsBy Camilo A. Alvarez, Stephen K. Harris, Brian R. Zuckerman, Philip J. Meymand, Danielle M. Steinmetz
"The sleek new air traffic control tower at the San Francisco International Airport stands at 221 feet tall and is set to replace the existing air traffic control tower by 2016. This aluminum-clad, to
Jan 1, 2017
-
“Special Application Of Micro-Piles” For The Construction Of A Bridge Well FoundationBy Nagarajkumar BV
Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu
Nov 1, 2022
-
Deep Excavation Support – Shangri-La – TorontoBy Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle
"The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe
Jan 1, 2015
-
Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple TechnologiesBy Dan Mahrt
"In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti
Jan 1, 2016
-
Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile MethodBy Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu
The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused
Jan 1, 2017
-
Guidelines for Selecting Cutoff Wall SystemsBy Mary Ellen Large
This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system
Jan 1, 2021
-
Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Oldie But Goldie – Bi-Directionally Tested Foundation Piles With Base Enlargement As A Smart And Economical Alternative To Conventional Piles At Geneva, SwitzerlandBy Dipl. -Ing. (FH) Thomas Schmitt, Dr. Melvin England
Foundations in Geneva are difficult and expensive due a large overlayer of clay and silt above competent bearing material in the moraine. Common foundation schemes use deep barrettes or bored piles, f
May 1, 2022
-
Controlling Thermal Stresses in Barrier WallsBy Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Using Multiple Pile Types On A Single Project To Maximize BenefitsBy James F. Davis, Matthew A. Conte, Robert F. Tonning
This is a paper demonstrating the steps taken to combine multiple types of piles for a single site to maximize the benefits and characteristics of each method. We intend to discuss the use of grouted
-
Current Practice For Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality ControlBy Rudolph P. Frizzi
Structures supported on ACIP and DD piles perform successfully when quality control is maintained from the initial site subsurface investigation through pile design, bidding, and construction. The fou
Jan 1, 2005
-
Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power FacilityBy David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar
"With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil
Jan 1, 2016
-
Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate AnchorsBy Osama A. Safaqah
Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to
Jan 1, 2013
-
Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BCBy Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li
"An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized
Jan 1, 2017
-
Contactless Anchor Measurement with Elastomagnetic SensorsBy Damir Dedic, Wörle. Patrick
"Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves
Jan 1, 2017
-
Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - SynopsisBy D. K. ] [Gupta
The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and
Jan 1, 1996
-
Kosciuszko Bridge Main Pylon Deep Foundation SolutionBy A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016