    Predicting ACIP Pile Settlement Using Case Histories ? Introduction

    By Christopher M. Kenney

    Augered-cast-in-place (ACIP) piles have been utilized on commercial projects throughout many parts of the country for years, but are only beginning to be scrutinized for use on major infrastructure pr

    Jan 1, 2001

  • DFI
    Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - Synopsis

    By Sanjeev Malhotra

    The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins

    Jan 1, 2000

  • DFI
    Hand-Dug Caisson Foundation Of The International Trade Centre In Shenzhen ? Synopsis

    By Y. G. Li

    The design and construction of the hand-dug caisson pier foundation of the Shenzhen International Trade Centre are described in the paper. In addition discussions and inquires about the load-bearing c

    Jan 1, 2010

  • DFI
    The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen

    By Li Keqiang

    Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on

    Jan 1, 1991

  • DFI
    Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project

    By Elizabeth M. Smith

    The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss

    Jan 1, 2009

  • DFI
    Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in Bratislava

    By J. Stacho, Frankovská. J.

    "Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on

    Jan 1, 2014

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    A Case Study On Underreamed Piles ? Synopsis

    By Rajesh Minda

    160 numbers of double bulb underreamed piles were constructed based on the safe loads specified in IS code at Tripura. The pile load tests yielded a much lower capacity. A detailed investigation work

    Jan 1, 1996

  • DFI
    The Merits Of Polymeric Fluids As Support Slurries

    By J. J. Beresford

    The primary function of a support slurry is to provide stability during excavation. Today foundation structures can be designed around the additional friction afforded by the absence of the filter cak

    Jan 1, 1989

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1997

  • DFI
    Drilled Shaft Foundations For The KcICON Missouri River Bridge

    By Paul J. Axtell

    The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M

    Jan 1, 2009

  • DFI
    Foundations For The M25 Motorway Near To Heathrow Airport

    By John F. Spence

    Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne

    Jan 1, 2007

  • DFI
    Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :

    By Virendra Singh

    The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic

    Jan 1, 1996

  • DFI
    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013

  • DFI
    Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction

    By Jon H. Gould

    This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub

    Jan 1, 1992

  • DFI
    Presentation #4 - Reflections On Pile Integrity Testing

    By Joram M. Amir

    Even when they are cased! [ ] In bored piles, as well as in drilled shafts, and in caissons too, defects will occur! [ ]

    Jan 1, 2001

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • DFI
    Port Mackenzie, Alaska - Deep Soil Compaction, Spin Fin- Pile Tension Test And Dock Construction

    By Garth Howlett

    In 1998 the Matanuska-Susitna Borough formed the new port district at Point MacKenzie, known as Port MacKenzie, located directly across the Knik Arm from Anchorage. In 1991 PND Engineers Inc. (PND), w

    Jan 1, 2006

  • DFI
    Soil-Cement Columns For Building Foundations

    By Osamu Taki

    The development of new auger bits for soil cement column drilling equipment has made it possible to create a homogeneous mixture of soil and cement-reagent slurry. As a result, soil-cement columns are

    Jan 1, 1992

  • DFI
    Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - Summary

    By Edmund J. Cardoza

    The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is

    Jan 1, 1992