Marine Foundation Retrofit For The Richmond - San Rafael BridgeBy Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
Slurry Walls Executed with the Cutting Soil Mixing Technique: A Case HistoryBy Carnevale Francesco, Bracci Laudiero Alberto, Pampanin Piero
"SummaryIn the Port of Naples a slurry wall has been realized through a sandy layer up to a deep tuff layer using the Cutting Soil Mixing technique.The executed panels have dimensions of 2.8 m x0.65 m
Jan 1, 2014
-
Experiences With Deep Foundations In Shanghai - SynopsisBy Y. X. Tong
The simplicity off Ø=0 analysis has been taken advantage of to evaluate the geotechnical problems of open caissons, slurry trench walls and piles in Shanghai. Undrained shear strengths obtained by va
Jan 1, 2010
-
Some Experience With Large Diameter Caissons ? SynopsisBy I. H. Wong
The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee
Jan 1, 2010
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case HistoryBy Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill DamBy Eric M. Klein
As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad
Jan 1, 2006
-
Statnamic Loading Tests On Different Pile Types - 1.0 IntroductionBy Patrick Bermingham
This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile
Jan 1, 1993
-
Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - BackgroundBy Brian Isherwood
TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b
Jan 1, 1997
-
Caisson Foundation For High Speed Paper Machine ? 1 ? IntroductionBy Anthony H. Tawil
Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte
Jan 1, 1987
-
Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge (16c93b01-e1c3-48e5-bd32-54e8ea2106cb)By Robb L. Swenson
Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of
Jan 1, 2013
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell InterchangeBy Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - SummaryBy Bengt H. Fellenius
The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe
Jan 1, 1999
-
Performance Based Seismic Retrofit Design of Brooklyn Basin WharfBy Sam Yao, Ali Naeem, Sara Barrett
Brooklyn Basin Project is a multi-billion-dollar development of the former Port of Oakland 9th Avenue Terminal located along the Oakland Estuary of California. A centerpiece of the development is the
Jan 1, 2018
-
Differing Site ConditionsBy James J. Tansey
A Deep Foundations Institute meeting with the University of Michigan at Ann Arbor in March of 1984 featured legal rights under Differing Site Conditions. A workshop conducted by the authors and Gerard
Jan 1, 1985
-
Integrity Testing - Friend Or Foe?By Bernard H. Hertlein
Transportation system structures have come under very close scrutiny in the last couple of years, largely due to the damaging effects of disasters, both natural and man-made. In the Pacific northwest
Jan 1, 1998
-
The Application Of The Caisson In ChinaBy Chen Xizhe
The caisson is adapted to the foundation of concentrated heavy building. As there are the flowing sand, boulder or cobble and other serious obstruction, the open caisson can't sink, the caisson c
Jan 1, 1991
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
Macropiles: Ultra-High-Capacity Micropiles For Foundation SupportBy John R. Wolosick
MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr
Jan 1, 2006
-
Operator Independent Installation Of Lime Cement (L/C) ColumnsBy Tobias Hansson
The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva
Jan 1, 2000
-
Combined Loading Tests On Large Diameter PilesBy A. Lyndon
Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t
Jan 1, 1989