Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pier Design And Construction In Water Bearing Soils ? SynopsisBy C. N. Baker
The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig
Jan 1, 2010
-
A Sound Concept that Deserves to Be ExpandedBy Deep Foundation
Whenever an organization launches an initiative, the question arises whether that initiative has staying power. Or is the initiative, as is quite often the case, merely a fad; that is, just an activit
May 1, 2023
-
Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern ThailandBy Narong Thasnanipan
Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette me
Jan 1, 2002
-
Jobsite Safety Inspection ChecklistBy Sam Messina
[Project: Job Number: Date: Superintendent: Person Making Inspection: Note: The following checklist shall be used on a regular basis as an overall assessment of the jobsite. The checklist
Jan 1, 1998
-
Interpreting Strain Measurements From Load Tests In Bored PilesBy Jack Hayes
Vibrating wire strain gages have proven to be a very reliable and effective tool for the measurement of strains associated with the loading of bored piles (drilled shafts). However, when these strains
Jan 1, 2002
-
Safe Load Of A Single Pile In Earthquake Loading - SynopsisBy Shamsher Prakash
Estimation of vertical load carrying capacity of a single vertical pile under earthquake loading is an important task of a design engineer. Lateral vibration of vertical pile is highly influenced by t
Jan 1, 1996
-
Capacity Prediction Vs. Performance Of Driven Pre-Cast Pre-Stressed Concrete Piles In Chesapeake, VirginiaBy Emad Farouz
This paper compares the predicted axial capacity of driven Pre-cast Pre-stressed Concrete (PPC) piles for the Lake Gaston Water Treatment Plant (LGWTP) using several design methodologies versus the ax
Jan 1, 2007
-
Settlement Control Of A Road Embankment Using Vertical DrainsBy Wei Tu
A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that
Jan 1, 2009
-
Underpinning A Deep Foundation ? A Case History ? SynopsisBy M. Soranzo
This paper presents a restoration operation of the load-bearing capacities of a deep foundation which did not satisfy the original design conditions. The operation was preceded by a series of tests ca
Jan 1, 2010
-
Base Grouted Piles In Thanet Sands, LondonBy D. E. Sherwood
Twelve toe grouted, and eleven ungrouted piles, founded in very dense sands have been analysed to establish how toe grouting enhances pile performance. It is shown that pile stiffness is greatly incre
Jan 1, 1989
-
Towards a Performance-Based Design of Drilled ShaftsBy Kam Ng
For bridges or buildings that may be subjected to large vertical and lateral loads, drilled shafts offer an economic foundation solution. While the current drilled shaft design practice is considered
Jan 1, 2013
-
Tension Tests On Driven Pipe Piles In Sand - SynopsisBy Alan J. Lutenegger
A series of tension tests were performed on prototype scale steel pipe piles at two sites to evaluate the influence of scale and pile plugging on the unit skin friction developed in axial tension. The
Jan 1, 2000
-
The Theory Of The Expansion Of Cavities Applied To Pile Installation ? SynopsisBy D. A. Ponniah
The installation of a pile is considered analogous to the expansion of a cylindrical cavity of a diameter equal to that of the pile. Using Vesic's theory of the expansion of cavities the effect o
Jan 1, 1987
-
Foundation Performance of Millennium Tower in San Francisco, CaliforniaBy John A. Egan, Nathaniel Wagner, Micaela Largent, Jonathan P. Stewart, Debra Murphy, Jeremy Butkovich
The Millennium Tower is a 58-story reinforced concrete building that was constructed in San Francisco, California between 2005 and 2009. The Tower is founded on an embedded pile supported mat with pil
Sep 8, 2021
-
A Case Study In Hand-Dug Caissons ? SynopsisCaissons hand dug to a depth of about 100 feet were used to underpin three important structures at an industrial site in the State of Utah. The caisson shafts extended through 30 to 40 feet of coarse,
Jan 1, 2010
-
Deep Soil Mixing Use in PolandBy Michal Topolnicki
Deep Mixing Series: This article is the second keynote highlighted from DFI's virtual Deep Mixing Conference in 2021, for which Topolnicki served as a committeee co-chair Polish applications of deep s
Apr 1, 2022
-
The Benefits of Early Contractor InvolvementBy Robert Small, Amshu Chappa, Ihab Allam
The Biosolids Digester Facilities Project (BDFP) is located in southeast San Francisco. The jobsite is bounded by active Caltrain and Union Pacific Railroad tracks on the west side and the existing So
Jan 1, 2023
-
Depth Of Borings, Length Of Piles, Landslides, Erosion, And A Moose Hunt - A Case History Of A Comedy Of MistakesBy Bengt H. Fellenius
An upgrading and straightening of a highway included building a bridge across a small river. A routine site investigation was initiated to determine the conditions for designing the foundation of the
Jan 1, 1987
-
Dynamic Lateral Response Of A Full-Scale Pile GroupBy Kyle M. Rollins
To improve our understanding of lateral resistance of pile groups, a series of lateral load tests were performed on a full-scale pile group using both static and dynamic loads. The pile group consiste
Jan 1, 2002
-
Analysis Of Vibratory Driven Pile ? IntroductionBy Sherrill Gardner
Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type
Jan 1, 1987