Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Technology, Occupational Health and Safety in the German Hard Coal Mining IndustryBy Michael Bauer
Increases in productivity and improvements in mining occupational safety and health are intrinsically linked. Over the past years, the German Hard Coal Mining Industry has been able to accomplish both
Aug 1, 2013
-
Heating Iron Ore Slurry to Improve Filtering Efficiency Prior to PelletizingBy Robert E. Wood
Engineers have known for some time that the efficiency of filtering iron ore concentrate slurry can be significantly improved by pre-heating the slurry ahead of the filters. However, heating such larg
May 1, 2010
-
A Review of the Properties of Foam Mine FillBy F. P. Hassani, M. Hefni, M. F. Kermani
"This study is part of large and an ongoing investigation into the development of a light-weight and highly fluid mine fill for various applications in mining and civil operations. Foam mine fill is t
Jan 1, 2015
-
Optimization of the Haile Gold Mine Grinding and Flotation Line Using Model Predictive ControlBy Quenton Johnson, W. A. Gough, David Carr
"This paper describes the application of the BrainWave Model Predictive Controller (MPC) and Advanced Control Expert (ACE) Advanced Supervisory Control System on the SAG Mill, Ball Mill, and Rougher F
Jan 1, 2017
-
Feasibility analysis of methanol fueled SOFC systems for remote distributed power applicationsBy M. Staite
This paper analyzed the feasibility of converting a 5kW natural gas SOFC power generator system designed to operate on natural gas to be fuelled by methanol. The analysis included laboratory methanol
Jan 1, 2005
-
Mining Engineering CurriculaM INE production requires the coordination of the talents of men and the use of equipment. Mine operators maintain a continual surveillance of equipment, looking for improvements and modifications tha
Jan 1, 1963
-
Design Methodology for Large Underground PowerplantsBy R. Plassart, F. Laigle
"As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str
Jan 1, 2015
-
Seawater As A Resource For Sustainable Copper OperationsBy R. Niechcial
As populations grow and industry expands, the limited fresh water resources available are increasingly under stress. This situation creates conflict between communities and industry; and the sustainab
Jan 1, 2007
-
Teck’s Kivcettm Lead Tapping ExperienceBy G. J. McTeer, D. L. Verhelst, D. J. Rioux
Teck Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. Since 1997, KIVCETTM flash smelting technology has been utilized for the treatment of zinc plant residues
Jan 1, 2015
-
Quality Control Improvements in Bessemer Matte Production at the Vale Copper Cliff SmelterBy M. Zanini, D. Wong
ABSTRACT: Metals market improvements in 2005 drove the desire to increase nickel throughput and the production of nickel oxide sinter at the Vale Ltd. Copper Cliff smelter. Significant difficulties we
Jan 1, 2012
-
Milling and Process Methods of American Nepheline LimitedBy J. J. Mather
NEPHELINE SYENITE is a feldspathic rock resembling granite in texture and hardness but it is white in colour and contains appreciable quantities of the mineral nepheline, the result of a silica defici
Jan 1, 1957
-
Evaluation of CMC for Ultramafic Ore FlotationBy I. Farr, P. Quinn, H. Mani
"Difficulties in the flotation of Inca's ultramafic ores at the Thompson Mill are related to the presence of serpentine slimes and some floatable rock minerals. Serpentine slime coatings depress pentl
Jan 1, 1998
-
Effect of Electricity Mix and Ore Grade on the Carbon Footprint of Chilean Cathodic CopperBy C. Peña, C. A. Zaror, M. Bustamante, M. Vega
The goal of this paper is to present the carbon footprint of Chilean cathodic copper, as a function of the electricity generation mix, ore grade, and process efficiency. Ore grades and acid leach-solv
Jan 1, 2011
-
Development and Improvement of Submerged Lance Converting and Refining Furnace of Fangyuan Two-Step ProcessBy Haibin Wang, Zhiwei Huang, Zhixiang Cui, Wenzhao Cui, Zhi Wang
Fangyuan Two-Step copper smelting process was commercialized in October, 2015 and has been operating for 3 years and 5 months. As the unique continuous copper smelting process with simplified flow in
Jan 1, 2019
-
Fixing the Foundations: Auditing the Internal Responsibility SystemOverview n Why we audited the IRS n How we did it n What we discovered n What we learned n Where we are going next The unbroken chain of safety The Internal Responsibility System (IRS) The n
May 1, 2003
-
Massive Sulphide Deposits in New BrunswickBy A. L. McAllister
"MASSIVE sulphide deposits are found in two areas of New Brunswick, the St. Stephen area and the Bathurst-Newcastle area. In both, the geology in the immediate vicinity of the sulphide bodies is large
Jan 1, 1960
-
XPS Study on the Reaction Mechanism of Chlorite with New Anionic Collector A6By Yulin Zhou, WenFeng Li, Wen Chen
"In this article, with the help of the X-ray photoelectron Spectroscopy (XPS), a modern test method, all the characteristics of the chlorite,and adsorption collector A6 on the surface of chlorite have
Jan 1, 2016
-
An Innovative Process for the Separation of Iron in Mixed-Chloride Medium: A Case Study for Lateritic OreBy M. A. Halim, V. I. Lakshmanan, Z. Jankovic
An innovative mixed-chloride process for the separation of iron from lateritic ore is described. The separation of Fe(III) from leach liquor is an important process step for the recovery of nickel and
Jan 1, 2015
-
The Cambior Story: Exploration"Cambior currently has nearly 80 exploration properties, acting as operator on about 60 of these. The company's exploration budget has increased to over $11,100,000 for 1990. On-going efforts rec
Jan 1, 1990
-
Input Automation of the Computerized Pit Design System at Iron Ore Company of CanadaBy Desmond Y. M. Lee
This paper presents a procedure to prepare input for the computerized pit design system at Iron Ore Company of Canada. The procedure is simple and requires very little training. Also, it is general en
Jan 1, 1978