Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sélection optimale des quantités d'explosifs basée sur des contraintes de production et un résultat d'analyse de régression multipleBy J. L. Collins
"Une recherche debutee en 1987 tente de cerner divers éléments ayant un impact sur la productivite miniére, de facon à améliorer la planification des operations souterraines. II a été possible de recu
Jan 1, 1990
-
Perspectives on the scientific and engineering principles underlying flow of mineral pastesBy Michael Li, Arie Moerman
"Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical method
Jan 1, 2002
-
Constancia Project Process Plant Design and Start UpBy David Stephenson, Hugo Granados, Steven Klohn
"HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv
Jan 1, 2016
-
Embedding Sustainability into Environmental and Social Impact AssessmentsBy Louise Pearce
?Environmental and social impact assessments (ESIAs) are: ??process-driven and scientific processes ??The process entails a number of steps and procedures which result in obtaining a licenceto ope
May 1, 2011
-
Occupational Standards and Certification for Mineral Processing Technicians in the Northwest TerritoriesBy Mary Ann Bennett, Val Nichols, Colleen Proctor
"In 1997 when Royal Oak Mines Inc. went into receivership, the mineral processing technicians (mill operators) who had been working at Giant Mine in Yellowknife, Northwest Territories for most of thei
Jan 1, 2005
-
Towards Sustainable Mining?Why TSM in Canada ?How it was developed ?Architecture and Goverance ?COI panel ?Performance indicators and how they work ?External Verification ?Reporting ?The national organization of the Can
May 1, 2011
-
Grinding Circuit Improvements at Barrick Goldstrike’s Roaster FacilityBy Jim Wickens, Andy Cole, John Pekrul
"The roaster facility at Barrick Goldstrike Mine treats double-refractory sulfidic/carbonaceous gold ore. Prior to oxidation in the roasters, the ore is ground in two parallel dry grinding circuits ut
Jan 1, 2003
-
FreedomCAR and CastingBy J. A. Jr. Carpenter
Expanding world economic prosperity, probable peaking of conventional petroleum production in the coming decades and environmental concerns require efforts to increase the efficiency of, and the devel
Jan 1, 2006
-
Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands InteractionsBy Samuel Frimpong
The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the
May 1, 2004
-
New Assessment Technique for LHD Vehicle VisibilityOver the last three decades, the mining industry has been moving towards more underground mechanized mining methods and the number of LHD vehicles utilised has increased. The growth of mechanization a
May 1, 2004
-
Information Strategy Planning on Nuclear Power Plant Project Management SystemBy Son Hye Jin
Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the
Aug 1, 2013
-
Concentrate Dewatering Modernization at the INCO Thompson SmelterBy Mika Muinonen
"Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou
Jan 1, 2006
-
Model-based control of column flotation: Toward industrial application and real-time optimizationBy André Desbiens, Jocelyn Bouchard, René del Villar
"The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la
Jan 1, 2003
-
Stope Sequence Optimization for Narrow Vein, Long Term Mine PlanningBy André van Wageningen
Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos
Oct 1, 2004
-
Mining for Space Why now?By Michel Doyon
Canadian Context: Exploration ??Space Exploration is within the unique mandate of the Canadian Space Agency ??Global partnerships ??Maintain close relationship with our partners ??New knowledge
May 1, 2009
-
Review of Noront’s Eagle’s Nest ProjectBy Paul Semple
"In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced
Jan 1, 2013
-
Narrow vein mine design at the Hoyle Pond mineBy John G. Henning
The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o
Oct 1, 2004
-
Comparison of Penzien and Wang analytical methods with the finite difference numerical method in seismic analyses of the Qazvin-Rasht (Kuhin) tunnelBy F. Hassani, R. Mikaeil, B. Ferdowsi
Two analytical solutions for estimating the ovaling deformation and forces in circular tunnels are widely used in engineering practice, due to soil-structure interaction under seismic loading. This pa
Jan 1, 2008
-
Utilizing Strain Criteria to Predict Highwall Stability PerformanceBy H. Warren Newcomen
Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents
May 1, 2004
-
Significant Canadian Developments in Mineral Processing Technology 1961-2011By J. E. Nesset
"I had been requested earlier this year by MetSoc, our sister society of CIM, to contribute a chapter on technical developments in Canadian mineral processing over the past 50 years to their 50th Anni
Jan 1, 2012