Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Practical Considerations for Multimine Grade ReconciliationThis paper discusses the implementation and potential limitations of the method for estimating sampling and analytical errors of multiple source mine output blended into a shipping product, described
Mar 1, 2010
-
Coal into the 21st CenturyBy Tomlinson R. C
The paper will briefly describe planning in the National Coal Board (NCB) and the contribution that operational research makes to it. It will then give details of some of the models in use and will
Jan 1, 1977
-
Laboratory Corrosion Tests of Frictional Rock BoltsBy D W. Airey
Frictional rock bolts are widely used because of their low cost. However, they have a thin wall section that makes them prone to corrosion, and they cannot be relied on to provide long-term ground sup
Nov 5, 2014
-
Structural Integrity Evaluation Using Acoustic Emission TechniquesBy Harris RW
Acoustic Emission structural integrity evaluation tests rely on the validity of the detected acoustic emission data and the ability of the practitioner to both analyse and interpret the data to make a
Jan 1, 1991
-
Mining of the Southern 1900 Orebody at Mount IsaBy Li T
Mining of the southern 1900 copper Orebody presented a challenge due to the complex geology, geometry and simultaneous extraction of the nearby lead/zinc/silver orebody. An integrated and co-operati
Jan 1, 1995
-
Fair Hill formation and German Creek Coal Measures in the Goonyella-German Creek DistrictOperations at two open cut mines have so far commenced on two out of the five potentially mineable seams in the Fair Hill - German Creek Coal Measures. Due to seam splitting, up to seven mining unit
Jan 1, 1974
-
Diesel Exhaust and the Underground Miner in Western AustraliaBy O Jones
Longstanding occupational health challenges of the underground hard-rock mining sector require both an analysis of historical data to assess evidence of linkages between the source of the problem and
Aug 31, 2015
-
Interacting with the Daily Operations and the Need to Plan for Future RehabilitationMine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro
Jan 1, 2007
-
Deriving maximum value from mineral waste streamsBy D Osborne
Current mineral extraction and valorisation activities still have a strong focus on the ‘delivered product(s)’ which might be a bulk commodity such as metallurgical coal, hematite, bauxite, etc., and
Sep 1, 2024
-
An Alternative Whole-of-Life Approach to Tailings ManagementBy D J. Williams
Tailings management is typically constrained by many factors that are taken as given. These include the tailings production rate that must be accommodated, the desire to deliver the tailings cheaply a
Jul 16, 2014
-
Performance of Electrodes Containing Brown Coal Char in Alumina ReductionBy Graham JW, Cullen GV
edicted increase in, Aluminium production and the possibility of a diminishing supply of petroleum coke for anode electrodes in alumina reduction cells makes it desirable to find alternative electrode
Jan 1, 1970
-
The Future of the Global Mining SectorBy T Goldsmith
The mining industry is cyclical, but those are more than normal business cycles. In the early 2000s the industry saw the start of China as a game changer for the mining industry which lead to catch ph
Aug 18, 2014
-
Current Developments in the Operation and Control of AG and SAG Mills in AustraliaBy D Baas, Y Atasoy
With increased pressure for companies to cut costs during design of new mineral processing plants, overall plant design has changed over the last decade with less design for feed blending and less ins
Jan 1, 2008
-
A One-Sided View of the Development of Computer-Assisted Mapping and ModelingBy Johnson M, Gaudin A
With the advent of Computer aided mapping and surface modelling techniques Geologists and Engineers have had to become familiar with the capabilities and limitations of these systems to effectively
Jan 1, 1983
-
Inadequate Water Management Planning Resulting in Long-term Closure LiabilitiesBy H J. J Boshoff
Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM
Jul 16, 2014
-
The Melbourne Underground Rail Loop Overall Tasks and OrganisationBy Watson F. G
As an introductory paper of a series on the Melbourne (Australia) Underground Rail Loop extension to the extensive electrified suburban railway system the paper outlines the need for the Loop, leg
Jan 1, 1981
-
On the Application of the Method of Exhaustion in Seeking a Proper Formula for Discharge EstimationIn order to do the discharge estimation better, it is valuable to find out appropriate formulas for estimating discharge in various pits, based on accumulating data, summarizing discharge patterns
Jan 1, 1988
-
Determining the Pressure Pulse for an Air BlastBy M A. Tuck
Air blasts or wind blasts as they are termed in underground coal mining, occur in a number of types of underground mining where a void develops and the overlying or adjacent rock fails rapidly to allo
Jul 1, 2013
-
A tailored solution to determine plant capacity using strategic analysisBy J Nortier, J Dray
There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi
Jun 22, 2022
-
Minimising Arsenic and Mercury Mobility With Acid Rock Drainage, Northland, New ZealandRemnants of Plio-Pleistocene hot spring systems in Northland, New Zealand contain sulfide minerals, principally pyrite, marcasite and cinnabar. The climate is warm temperate to subtropical, with up to
Jan 1, 2003