Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    GEM (Geologic Element Motion) Blast Heave Modeling with More Element Shapes and Energy Partitioning

    By Stewart A. Silling, C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    GEM (Geologic Element Motion) is a Distinct Element Method (DEM) for modeling blast-induced heave. It was developed with a very fast computational algorithm that efficiently treats many different elem

    Feb 6, 2023

  • ISEE
    Determination of Presplit Borehole Pressure

    By Dr. Paul Worsey, Dr. Calvin Konya, Dr. Anthony Konya

    Development of methods to calculate presplit blasthole pressures through simplified models, namely the Empirical Model and the Detonation Pressure Model. These models can be used with variations in ex

    Feb 1, 2020

  • ISEE
    Cumberland Gap Tunnels; Controlled Excavation With Complex Geology

    By Tom Short

    The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, V

    Jan 1, 1993

  • ISEE
    A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects

    By Robert Lee, Pertti Paavola

    Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in

    Jan 1, 2004

  • ISEE
    Excavation of Rock by Non-Explosive Method at Queen Mary Hospital, Hong Kong

    By Guy Bridges

    Site formation works requiring excavation of rock at the Queen Mary Hospital redevelopment site was restricted due to extremely low ground vibration limits. Non-Explosive excavation method called Elec

    Feb 1, 2020

  • ISEE
    Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution

    By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro

    This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model

    Jan 21, 2025

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    Blasting Improvements by Using Most Active Rock Variations on Blast

    By Alain Blanchier, Anne Charline Sauvage

    Rock mass variations have a huge influence on explosives efficiency and on blasting results. Numerous blasting improvements could be gained by taking into account rock mass and its variations. However

    Jan 1, 2004

  • ISEE
    Productive Partnership – Advanced Blasting Technology at Newlands Coal Mine

    By Les Willan, Chris Batten, Matt Sparkes

    In late 2008 Xstrata Newlands Coal Mine in Central Queensland and Orica Mining Services engaged in discussion to investigate methodologies to change their current mining practices and overcome the iss

    Jan 1, 2010

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    Numerical Study on Controlled Blasting by Pre-cracked Notch

    By Kwang-Yeom Kim, Dong-Gyou Kim, Hyo-Kwan Yoon

    This study was intended to simulate the blasting model using notched-hole with numerical approach. Numerical analysis approach was applied to compare and evaluate the blasting model using notched-hole

    Jan 1, 2010

  • ISEE
    Drilling & Blasting of a Small Diameter Shaft Next to Historic Structure

    By Corry Goumans, Ron J. Elliot

    This paper discusses the challenges encountered in drilling and blasting of a small diameter shaft underneath a parking garage in historic Gastown, Vancouver, BC. This project involved drilling in a r

    Jan 1, 2004

  • ISEE
    Connecticut's "Call Before You Dig" System: New Laws and Regulations

    By Stephen G. Rieben

    Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En

    Jan 1, 1990

  • ISEE
    Considerations in Blasting Influence on Grindability

    By Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta

    The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f

    Jan 1, 2015

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    Journal: Coal Creek rebirth: Just add explosives

    By Michael Milstein

    Northwest Research Station said as more and more older dams are removed to benefit fish, it’s become clearer that rivers rework themselves quickly.“Where the dam is relatively small, it’s a quick resp

    Jan 1, 2010

  • ISEE
    Segregation Blasting Using Electronic Initiation at the Coeur Rochester Mine, Nevada

    By Donald Wagstaff, D. Scott Scovire

    The Coeur Rochester Mine is the largest primary silver surface mine in North America. Throughout its 17-year life, gold and silver grades leaving the tertiary crusher have typically been, on average,

    Jan 1, 2004

  • ISEE
    Blast Optimization and Vibration Control at a Multi-Seam Coal Mine, Brazil

    By Enrique Munaretti, Vitor Rosenhaim, Jair Carlos Koppe, Joao Francisco Feijo

    The B3 mine is a multiple coal seam strip mining in operation in Rio Grande do Sul, the southernmost state in Brazil. A traditional truck & excavator operation is used to remove the overburden and sel

    Jan 1, 2012