Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • DFI
    Foundations For Light Buildings On Lime/Cement (L/C) Columns ? Summary

    By Per Eriksson

    For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m

    Jan 1, 2000

  • DFI
    Auger Pressure Grouted Displacement Piles: An Acceptable Alternative

    By Osama El-Fiky

    There are many types of deep foundations currently being used in the San Francisco Bay Area, one of the most common being driven precast, prestressed concrete (PC/PS) piles. PC/PS piles are frequently

    Jan 1, 2002

  • DFI
    Permanent Displacement And Pile Driving Vibrations - Summary

    By Charles H. Dowding

    Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta

    Jan 1, 1991

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • DFI
    "Underpinning By Jet Grouting" - Summary

    By George K. Burke

    Underpinning of a structure has been traditionally expensive, time consuming, and, in many cases, caused as much settlement to the existing structure as it was trying to prevent. As underpinning is no

    Jan 1, 1991

  • DFI
    The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen

    By Li Keqiang

    Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on

    Jan 1, 1991

  • DFI
    Case History: Estimating Ground Vibrations Caused By Pile Driving

    By Tracy Brettmann

    A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat

    Jan 1, 1999

  • DFI
    Soil-Cement Columns For Building Foundations

    By Osamu Taki

    The development of new auger bits for soil cement column drilling equipment has made it possible to create a homogeneous mixture of soil and cement-reagent slurry. As a result, soil-cement columns are

    Jan 1, 1992

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • DFI
    Hand-Dug Caisson Foundation Of The International Trade Centre In Shenzhen ? Synopsis

    By Y. G. Li

    The design and construction of the hand-dug caisson pier foundation of the Shenzhen International Trade Centre are described in the paper. In addition discussions and inquires about the load-bearing c

    Jan 1, 2010

  • DFI
    Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - Summary

    By Edmund J. Cardoza

    The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is

    Jan 1, 1992

  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • DFI
    Presentation #6 - Rapid Load Testing: A New Choice For Pile Testing

    By Michael D. Justason

    ...a global perspective... In March of 2000, the Japanese Geotechnical Society added "Rapid Load Testing" to their national standard for pile testing. In the year 2000. it is estimated that th

    Jan 1, 2001

  • DFI
    History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - Summary

    By James S. Graham

    Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area

    Jan 1, 2000

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960&apos;s. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • DFI
    Site Solutions For The Pisa Tower Remediation - 1 - Introduction

    By Paolo Heiniger

    The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter

    Jan 1, 2000

  • DFI
    Application of Multiple Excavation Support Systems in Brown Field Project

    By Shuvranshu K. Rout, Anup K. Mandal, Biswajit Das, Manos De

    "To adopt new technology advancement in Steel Plant, there is a requirement of shifting of operation process from Coke Wet Quenching (CWQ) to Coke Dry Quenching (CDQ). New CDQ chamber foundation with

    Jan 1, 2017

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1997

  • DFI
    Advances in Stress-Wave Nondestructive Testing Methods for Evaluation of Deep Foundations

    By Joseph T. Coe, Siavash Mahvelati, Alireza Kordjazi

    This paper introduces recent advances in stress-wave NDT systems for use in assessments of in-service foundation integrity and drilled shaft construction. The primary results of the laboratory experim

    Jan 1, 2018