Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hazards associated with the mining of diamondiferous pipes

    "With the globalization of the mining industry, many companies are now seeking to invest in underground diamond mines, with the purchase of small diamond pipes being seen as particularly attractive. H

    Jan 1, 2000

  • CIM
    Using The Six Sigma Approach Towards A Metallurgical Project: Nickel Loss Reduction And General Improvements To The Raglan Rougher Flotation Circuit

    By C. Ciriello

    Six Sigma methodology, as applied within Xstrata (formerly Falconbridge and Noranda), involves a disciplined approach to managing projects, solving problems, improving performance, and leveraging info

    Jan 1, 2007

  • CIM
    SAG & Ball Mill Control by Model Predictive Controllers on 3 Lines at Collahuasi (2343b67c-71d9-438d-9bd7-4cf994d8cd8f)

    By P. Espinoza, I. Yutronic, J. Olivares

    "Compañía Minera Doña Inés de Collahuasi's (CMDIC) Concentrator Plant is located at 4300 meters above sea level, approximately 2000 kms north from Santiago, Chile. The concentrator has three grin

    Jan 1, 2012

  • CIM
    Analysis of Abrasive Wear During Machining Metal Matrix Composites

    By H. A. Kishawy, S. Kannan, M. Balazinski

    Metal Matrix Composites (MMCs) are new generation engineering materials that possess superior physical and mechanical properties compared to nonreinforced alloys. However, the presence of abrasive cer

    Jan 1, 2006

  • CIM
    Optimum Design of Open-Pit Mines

    By Helmut Lerchs

    An open-pit mining operation can be viewed as a process by which the open surface of a mine is continuously deformed. The planning of a mining program involves the design of the final shape of this op

    Jan 1, 1965

  • CIM
    Automated Evaluation of Proximity Hazards Caused by Workers Interacting with Equipment

    By Tao Cheng

    Previous research and applications in construction resource optimization have focused on tracking the location of material and equipment. There is a lack of studies on automated monitoring of the inte

    Aug 1, 2013

  • CIM
    The Practical Examination of Mineral Prospects

    By J. A. Reid

    THE views and observations expressed herein on this old but constantly recurring question are our own, no effort having been made to align them with standard texts. Therefore, while they may find gene

    Jan 1, 1945

  • CIM
    The Smelting of Magnetite

    By Bradley Stoughton

    The magnetic oxide of iron, F eO4 , contains a theoretically larger amount of iron ( 72.4 per cent.) than any other commercial ore. It is probable that it has originated in many cases by the prolonged

    Jan 1, 1924

  • CIM
    Plant Ramp-Up Profiles an Update with Emphasis on Process Development

    By Terry McNulty

    "Previous papers (McNulty 1998 and 2004) have dealt with the causes of successful and less successful achievement of design production rate by new processing plants in the minerals industry. Examinati

    Jan 1, 2014

  • CIM
    Coupled Atomistic/Continuum Discrete Dislocation Modeling of Nanoscratching

    By W. Beres, R. E. Miller, B. Shiari, L. R. Zhao

    A dynamic multiscale simulation method has been developed to study the material scratching processes on nanoscale single crystals. The model simultaneously captures the atomistic mechanisms near the f

    Jan 1, 2006

  • CIM
    Sampling for Metallurgical Test: How the Test Results can be used to Estimate Their Confidence Level

    "During the development of a mining project, samples are taken for metallurgical tests. The sample can be a composite sample made of material from a selection of various drilling products or a sample

    Jan 1, 2016

  • CIM
    A New Approach for Characterisation of Densely Fractured Rock Masses Using Artificial Neural Networks and Principal Component Analysis

    By R. B. Kaunda

    One fundamental requirement for surface and underground rock engineering is the ability to characterise the rock mass. An accurate characterisation of the rock mass allows rock engineers to optimize d

    Jan 1, 2015

  • CIM
    Effect of Impurity and Pretreatment Conditions on the Catalytic Activity of Au Powder for CO Oxidation

    By Yasuo Iizuka

    We have had studied CO oxidation on unsupported Au powder (mean particle size, ca.100nm) manufactured by evaporating ultra high purity gold metal (>99.99%) in inert gas and reported that it showed som

    Oct 1, 2003

  • CIM
    Simple ways for reducing equipment queuing time at a repair shop in an open pit operation

    By Jean-Luc Collins

    "This paper shows how simple reliability concepts such as mean time between failures and mean repair time can be used efficiently to help increase equipment availability and so reduce the economic los

    Jan 1, 1988

  • CIM
    Potential of Leading Indicator Data Collection and Analysis for Proximity Detection and Alert Technology in Construction

    By Eric D. Marks

    Fatalities resulting from ground workers colliding with objects and construction equipment accounted for approximately 18% of the total construction fatalities experienced in 2010. Current injury and

    Aug 1, 2013

  • CIM
    Wear & Design Improvements in Discharge Cones for Large SAG/AG Mills (a95ef7ab-6071-475c-8b9c-363d74a295c8)

    By Craig Faulkner

    Discharge cones for large Semi Autogenous Grinding (SAG) and Autogenous Grinding (AG) mills are subjected to high wear as significant volumes of ground ore and slurry exit the mill. With the larger di

    Jan 1, 2012

  • CIM
    Mineralogical Control of the Form of Ferric/Ferrous Precipitates for Effective Treatment of Acid Mine Drainage

    By Yugo Mitani, Tatsuya Kato, Chiharu Tokoro, Abdullah Al Mamun

    Acid mine drainage (AMD), which is a major source of mining pollution, often contains ferric and/or ferrous ions together with several toxic elements. The ferric and ferrous ions in AMD precipitate in

    Jan 1, 2016

  • CIM
    Study and development of leaching process with the aid of mathematical modelling

    By Y. M. Shneerson, E. E. Zhmarin, E. M. Vigdorchik

    One of the Gipronickel Institute activities is research and development of customized leaching technologies. The work is performed in several steps. Leaching kinetics are studied on a lab-scale accord

    Jan 1, 2005

  • CIM
    Relationship between Porosity and Surface Deposit Coverage for Wire and Arc Additive Manufactured Aluminium Alloy 2319

    By K. E. Harley, M. J. Whiting, T. J. Sabin, E. M. Ryan, J. F. Watts

    "Wire and Arc Additive Manufacturing (WAAM) has the potential to enable a very significant reduction in buy-to-fly ratio compared to conventional manufacturing through the ability to build near-net sh

    Jan 1, 2018

  • CIM
    Development of human resources for the mineral industries - the supply side: Technical school and university graduates

    By John E. Udd

    "In this paper the author presents the results of the 1992 CIM survey of graduates in minerals and technology programs in Canadian post-secondary institutions. As usual, the trends are out-of phase wi

    Jan 1, 1993