Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Towards A Method Of Determining Floor Quality In An Underground Coal Mine

    By Jennifer Riefenberg

    Underground coal mines often experience ground control problems related to weak floor. Developing a methodology for rating floor quality can aid in understanding and delineating ground hazards. U.S. B

    Jan 1, 1995

  • SME-ICGCM
    Roof Instability Rating (RIR) System and Its Application at Enlow Fork Mine

    By John C. Stankus

    ldentifcation of potential roof problems in coal mines has long been a complex issue due to the wide variety of mining and geological conditions. It is well known that mine roof falls are related to m

    Jan 1, 2001

  • SME-ICGCM
    Geophysics For The Detection Of Abandoned Mine Workings

    By Christopher Phillips

    In light of recent events in the mining industry, there has been an increasing demand for technology to detect underground voids and abandoned mine workings. This paper summarizes the use of geophysic

    Jan 1, 2003

  • SME-ICGCM
    Management of Initial Convergence Events at Broadmeadow Mine

    By D. G. Lynch, M. R. Martin, R. J. Coutts

    "Broadmeadow Mine is an underground longwall mine located in Central Queensland, Australia. The mine introduced a top coal caving (TCC) longwall face in 2013 but since then has experienced severe conv

    Jan 1, 2018

  • SME-ICGCM
    Salt Pillar Design Equation

    By Leo L. Van Sambeek

    Specification of properly sized pillars to support the overburden is one of the most challenging aspects of salt mine design. Interest in salt pillar design is heightened by the recent flooding of th

    Jan 1, 1997

  • SME-ICGCM
    Understanding the Connection between Blasting and Highwall Stability

    By R. Quentin Eades, Kyle Perry

    "Surface mines continue to implement highwalls for several reasons, such as increasing recovery, improving margins, and justifying higher stripping ratios. Highwall stability is a complex issue that i

    Jan 1, 2018

  • SME-ICGCM
    Application Of Bolt Design Criteria At Galatia Mine

    By Tom Denton

    The bolt design criteria, since it was first published by Dr. John Stankus (Stankus, 1997), has been recognized as an important tool in ground control design. This concept is based on the Optimum Beam

    Jan 1, 2000

  • SME-ICGCM
    Comparison of Acoustic Emission and Stress Measurement Results to Evaluate the Application of the Kaiser Effect for Stress Determination in Underground Mines

    By Lorraine Kent

    Comparison of in-situ stress overcore measurement results with those determined from laboratory evaluation of Acoustic Emission (AE) testing on oriented sub-core samples has been carried out for a var

    Jan 1, 2002

  • SME-ICGCM
    Stability of Backfilled Cross-panel Entries During Longwall Mining

    By Brad Seymour

    In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek

    Jan 1, 1998

  • SME-ICGCM
    Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface Structures

    By Yi You

    A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term

    Jan 1, 1997

  • SME-ICGCM
    Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois Mine

    By Kenny D. Basnett

    An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with

    Jan 1, 2011

  • SME-ICGCM
    An Analytical Approach For The Estimation Of Pillar Strength

    A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co

    Jan 1, 1990

  • SME-ICGCM
    Mine Panel Collapse - Two Case Studies

    By Hanjie Chen

    A mine panel collapse may occur when pillar sizes are too small or the surrounding rock strata (roof or floor) yields. After a small pillar fails, its loading is rapidly transferred to adjacent pillar

    Jan 1, 1999

  • SME-ICGCM
    Mapping Hazards With Microseismic Technology To Anticipate Roof Falls - A Case Study (ac4523c6-7bdb-4660-a1cb-20433a65c0ed)

    By Anthony Iannacchione

    As the amount of new fractured surfaces or "damaged rock layers" within roof rock increases, the stability of the rock mass decreases. While direct measurements of this phenomenon are not easily made,

    Jan 1, 2004

  • SME-ICGCM
    An Investigation Of Longwall Pillar Stress History

    By M. G. Schuerger

    The United States Steel Mining Company, Inc., (USM) Lynch District, operated the No. 37 Mine in the Harlan coal seam, Harlan County, Kentucky, from 19'2 until its sale to Arch of Kentucky in 1984

    Jan 1, 1984

  • SME-ICGCM
    Enhanced Surface Control For Roof And Rib Support (8fec630d-2a24-4d9d-8993-15ef5bf95858)

    By Stephen C. Tadolini

    The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve

    Jan 1, 2001

  • SME-ICGCM
    The Use of Pneumatic Stowing in Germany Considering Subsidence Aspects

    By Axel Preusse

    Stowing or waste fill is common in the German mining industry since the beginning of mining activities, With increasing mechanization, flat and gently inclined seams (0 -- 18) were mined. These mines

    Jan 1, 2002

  • SME-ICGCM
    New Approach to Evaluate the Stability of Yield Pillars

    By Khaled Morsy

    In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica

    Jan 1, 2003

  • SME-ICGCM
    Rock Bursts In Human Collieries

    By Guang Ping Cui

    In this paper the imminent relationship between rock burst and its phenomenon with normal rock pressure and its appearance, as well as the factors of one changing into another have been analyzed. Base

    Jan 1, 1984

  • SME-ICGCM
    Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)

    By S. Bensehamdi

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur

    Jan 1, 1992