Atoka Pipeline - Canadian River CrossingBy Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Ground Freezing: The Use of Liquid Nitrogen Systems Converted To BrineBy Joseph A. Sopko
There has been a trend in recent years in performing the initial formation freezing using liquid nitrogen (LIN) and then converting the system to circulating refrigerated brine. While proponents of th
Jan 1, 2019
-
Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering GuidelinesBy M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Characteristics And Application Potentials Of Ground Improvement With Semi-Rigid Inclusions Based On An Innovative Composite Of Polymers And GravelBy Pratter P., Boley C.
Polymers are well established in geotechnical applications, for example in ground improvement, where the polymers act as a binder that, when cured, holds the grains together by adhesive and cohesive f
May 1, 2022
-
Pre-engineered Hydraulic Bracing SystemsBy Braxton P. Erbe, Douglas C. Brunot
A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy
-
Evaluation Of The Effect Of Vertical Load On The Impedance Function In Seismic Analysis Of Soil-Pile-Structure InteractionBy Ahmad Mahboubi
The damage caused by catastrophic earthquakes has always been an incentive towards more sophisticated building codes and requirements. In parallel to computer technology development, the engineers? at
Jan 1, 2010
-
The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off WallsBy Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf
"Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa
Jan 1, 2005
-
Outline and Execution Control System of Dry Jet Mixing (DJM) MethodBy Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto
"The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute
Jan 1, 2015
-
Design And Testing Of Deep Foundations For Wind Turbines In Western AlaskaBy Lorie M. Dilley
Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alaska villages, has made a concerted effort to install wind turbines in the villages they serve in an
Jan 1, 2010
-
Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian AquiferBy C. Dai, S Raathiv
The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th
Nov 1, 2022
-
Baum Station – A New Pile Driving and Drilling Navigation SystemBy Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura
"A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep
Jan 1, 2017
-
Settlement Evaluation of Large Water Storage Tanks Under Challenging ConditionsBy Ben M. Lewis, Yogesh Prashar
"The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal
Jan 1, 2016
-
Mobilised Shear Strength on the Failure Surface of 2D Belled Anchor Model Piles under Uplift in Cohesionless SoilBy Tanaya Deb, Sujit Kumar Pal
"Experimental investigations are carried out on failure pattern around 2D models of belled anchor piles in dry sand bed of density 15.60 kN/m3 under uplift. The models are having thickness ratio (Ts/T
Jan 1, 2015
-
Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit LimestoneBy Jim Glider, Noah Miner
The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio
Sep 8, 2021
-
Hybrid Shoring System for a Deep Temporary ExcavationBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid Deep Mixing (DM) shoring system was recently constructed for a high-rise development in downtown Vancouver, British Columbia, Canada for the temporary support of a five-level basement excava
Jan 1, 2017
-
Radium Hospital Project In Oslo, NorwayBy Wojciech Szczepiński, Dominik Gächter
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Oct 1, 2021
-
Radium Hospital Project in Oslo, Norway.By Dominik Gächter, Wojciech Szczepiñski
In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau
Sep 8, 2021
-
Dam Wall Toe Stabilisation Using Mass Soil Mixing TechniquesBy David W. Martel, Tom George
"As part of the regional water authority review and upgrade of local dams a 35m x 5m x 3m wet soil mixed block was required for stabilisation of a dam wall toe in remote Victoria, Australia. Remote ac
Jan 1, 2015
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004