The World's Longest Directional Impact Driven PileBy Robert F. Stevens, Robin Givet, Kenneth Viking
"Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660
Jan 1, 2014
-
Three Mass Stabilization Phases in the West Harbor of Helsinki, Finland – Geotechnical and Environmental Properties of Mass Stabilized Dredged Sediments as Construction MaterialBy Leena Korkiala-Tanttu, Noora Lindroos, Juha Forsman
"Construction works at the Helsinki city sea shoreline requires dredging and handling of contaminated sediments. Most of these soft dredged sediments are regarded as too poor quality material for eart
Jan 1, 2015
-
Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical MethodsBy Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
Performance Of Stone Columns In Multi-Layered Soils Under The Action Of Seismic LoadsBy P. Kiruthika, A. Murali Krishna
Soil liquefaction is a dangerous phenomenon that involves huge damages during strong earthquake ground motion event. Stone columns (SCs) are widely used as liquefaction mitigation element which is exp
Sep 1, 2022
-
Remedial Method for Collapse Soil Foundation of Mosul DamBy Arash Khosravifar, Ali N. Ibrahim
"Large areas of Iraq are covered with collapsible soils namely gypsiferous soil which is often used as the foundation soil for structures. In particular, the Mosul Dam foundation is comprised of high
Jan 1, 2017
-
Foundation in Simsima Lime Stone for an Underground ReservoirBy Chandramohan P. V., Ravi Kishore
"An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d
Jan 1, 2017
-
New Insights On Detecting Flaws With Csl And TipBy Andrew Z. Boeckelmann, David S. Graham, Paul J. Axtell
In the last fifteen years, several research studies have evaluated the ability to detect various types of deep foundation concrete integrity flaws with crosshole sonic logging (CSL) and thermal integr
Oct 1, 2022
-
High-Capacity Helical Piles for Drill Trestle SupportBy Matt Fenwick, Douglas R. Schwarm
Stringent underwater noise limits at the Fairview Ave. N. bridge replacement on Seattle's Lake Union required an innovative approach to supporting the 470-ft long drill trestle. Screw-in foundations
Sep 8, 2021
-
High Capacity Drilled Displacement Piles As An Alternative To Conventional Driven MethodsBy Pete Howell, Patrick Granitzki, Alicia Plinio, Janitha Batagoda
The New York City Housing Authority (NYCHA) Red Hook Houses was subjected to damage during Superstorm Sandy. As a result, the NYCHA has an ongoing project known as Restoration Associated with Sandy Re
Oct 1, 2022
-
An Alternative Lower Carbon Footprint Foundation For A Large Oil Gas Project In Jurong Island, SingaporeBy Selvaganesh Selvaraju, Deepak Raj, Sandun N. Wimalasena
One of the world leading oil majors is carrying out a multi-billion-dollar expansion of its integrated manufacturing complex in Jurong Island, Singapore, the global oil trading and refining hub. Soil
May 1, 2022
-
Evergreen Line Rapid Transit Project: Analysis and Design of Deep Soil Mix Panels to Mitigate Seismic Lateral SpreadingBy E. Naesgaard, Brian E. Hall, A. Amini, Advanced Geosolutions, A. Azizian
"A 2 km section of the Evergreen Line Rapid Transit Project is supported on improved ground consisting of cement deep soil mix (CDSM) panels because of highly variable and challenging soil conditions,
Jan 1, 2015
-
120 Years of Caisson Foundations in ChicagoBy Robert E. Schock, Eric J. Risberg
"Less than 20,000 years ago, the last of the glaciers retreated from the Chicago region. They left behind sheets of glacial clay till underlain by dense, over-consolidated till (“hardpan”) below which
Jan 1, 2016
-
After Sandy: Bay Park Sewage Treatment Plant Flood ProtectionBy David Guy, John Stanbury, Gilbert Tallard
"In 2009, storm surge from Hurricane Sandy inundated the Bay Park Sewage Treatment Plant located at El. +4 to +12 (+1.2 to +3.6 m) in East Rockaway, Long Island, NY. With all systems down, raw sewage
Jan 1, 2016
-
Quality Control And Estimation Of Axial Resistance By Using An Expander Body, A Large-scale PressuremeterBy Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci
This paper describes the general principles of the expander body with post-grouting (EBI) system, and how it is similar in nature to a large-scale pressuremeter device. The results from the installati
-
Innovative Micropile Retrofi t of an Existing StructureBy Kenneth R. Chadwick, Thomas J. Tuozzolo, Terence P. Holman
"Micropiles are often installed to retrofit existing foundations that experience distortion and to underpin structures prior to future construction. The Dublin Road Pump Station project is an example
Jan 1, 2008
-
Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope
Jan 1, 2015
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
Dynamic Load Testing of 2 Metre Steel Tubular Piles Driven into Foliated Phyllite BedrockBy Bosco Poon, Kim Chan, Luis Raúl Castañeda, Geoff McKay
"Driven steel tubular piles of up to 2 m diameter have been used to support abutments and piers of a bridge over Nambucca River and floodplain. The bridge was designed by Arup-Aurecon Design Joint Ven
Jan 1, 1900
-
Observed Driving Performance of Open-Ended Steel Pipe Piles with and Without Plugged ToesBy Chu E. Ho, Paul Napoli
This paper presents the performance of nineteen open-ended steel pipe piles driven through highly variable overburden soils into glacial till and schist bedrock. The piles were 16 inches in diameter a
Jan 1, 2019
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and