Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Laboratory Protocol to Evaluate Potential Chemical Interferences in Flotation Circuit ApplicationsBy B. G. Cousins, B. O’Rourke, C. Spence
"Some non-flotation chemistries are added to flotation circuits directly and indirectly to control issues such as scaling and dust. Since the dosage levels are generally not very large, a standard lab
Jan 1, 2013
-
Cyclone Modelling - Case StudiesBy R. N. Murarka
"Hydrocyclone modelling and selection procedure is illustrated. Computerized procedure for hydrocyclone cut size determination for grinding and non-grinding applications is described.A standard proced
Jan 1, 1992
-
Investigation of Liner Wear at Chadormalu Semi-autogenous Grinding MillsBy Mohammad Noaparast, Babak Fotoohi
"Due to certain advantages in (semi-)Autogenous-Ball mill circuits in most of the high-throughput ore grinding units of mineral processing plants, much attention is paid to optimize the mill performan
Jan 1, 2005
-
Millerite and Its Impact on Cu/Ni SeparationBy F. D. Ford, Z. Dai
"Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6
Jan 1, 2011
-
The Nanisivik MillBy A. C. T. Bigg
"The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of
Jan 1, 1980
-
The Application of the Marconaflo Slurry System to Mineral Processing and ExtractionBy N. W. Kirshenbaum
"The Marconaflo slurry system was originally developed to reduce costs and solve technical problems in the marine transport of mineral cargoes. In the short time since its inception, it has been found
Jan 1, 1973
-
Maintenance management control through utilization of a computerized system at the Key Lake projectBy T. Warren, R. Pender
"Significant strides have been made during the past decade to integrate the traditionally separate administrative functions of financial management, materials management and maintenance management.In
Jan 1, 1990
-
Advances in Centrifugal Gravity Concentration – Beyond Low Mass YieldBy Ish Grewal
"Batch centrifugal gravity concentrators, which produce very high ratios of concentration, have become common place for recovering free gold within milling circuits. Their effectiveness has proven to
Jan 1, 2009
-
Best-in-class maintenance benchmarks in Chilean open-pit minesBy P. Oyanader
"In 2001, the Catholic University of Chile undertook a maintenance benchmarking study of six open pit copper mines having mill capacities varying between 18,000 t/d and 156,000 t/d, and collectively r
Jan 1, 2005
-
The Onça Puma Nickel ProjectBy Ruy L. Rodrigues
Vale is in the early stages of commissioning its Onça Puma nickel operations. The project is meant for the production of 58,000 tpa of nickel contained in ferro-nickel, substantially contributing to t
May 1, 2010
-
Rotating equipment reliability for surface operation. Part I: Vibration analysis for rotating equipmentBy D. Prince, G. Nollet
"Since 1994, Aur Ressources has operated Louvicourt mine, a zinc and copper mine close to Val d’Or, at a rate of 4300 t/d. Ever since the start-up of the plant, management has encouraged innovative ap
Jan 1, 2002
-
Mill Modernization Program at Noranda Minerals Inc. Geco DivisionBy L. S. Urbanoski
This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine
Jan 1, 1987
-
Ecological Engineering and Biological Polishing Methods to Economize Waste ManagementBy M. Kalin
"SUMMARYWaste management in general, and the water treatment of mine and mill effluents, has become an ever increasing burden for mining operations. A reduction in these expenditures would undoubtedly
Jan 1, 1988
-
Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine CaseBy S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan
"Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou
Jan 1, 2003
-
Typical Reproducibility of Metal Balances in Flotation Plants"Each and every flotation plant must produce daily/weekly/monthly production reports in which metal balances for payable and penalising elements are presented. Several factors including ore heterogene
Jan 1, 2016
-
Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest QueenslandBy Patrick J. Williams, Peter J. Pollard
"Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a
Jan 1, 2001
-
Two Contrasting Iron Deposits in the Precambrian Mineral Belt of Cameroon, West AfricaBy E. M. Shemang, C. E. Suh, L. Mbinkar, University of Yaounde
"Two iron deposits within the Precambrian mineral belt of Cameroon are described in detail for the first time: the Archean Metzimevin replacement iron deposit enclosed in Fe-enriched itabirite, and th
Jan 1, 2008
-
Membrane Technology Applications in Mineral ProcessingBy Rory Cameron, Chuck Edwards
"Stringent environmental performance criteria and regulations, and the desire to minimize water use have made membrane-based treatment and separation processes an attractive option. This has lead to m
Jan 1, 2012
-
Effects of blasting on damage and grindability of impacted rockBy C. Pelley, S. Kelebek, G. Kunzel, S. Gregersen, M. Pollanen
A series of small-scale tests was conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the material properties of the rock as well as its resistance to crushing and
Jan 1, 2006
-
Escondida – Phase IV Grinding CircuitBy Walter S. Bergholz, Michael L. Schreder
"Since Escondida began operations in fiscal 1991, a series of aggressive expansion projects have enabled market share to be increased and ever larger profits to be realized. This was possible due to t
Jan 1, 2004