Mill Modernization Program at Noranda Minerals Inc. Geco Division

Canadian Institute of Mining, Metallurgy and Petroleum
L. S. Urbanoski
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
12
File Size:
373 KB
Publication Date:
Jan 1, 1987

Abstract

This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Minerals Inc. — Gecc Division is located at Manitouwadge in Northern Ontario. The community is situated north of Lake Superior approximately equidistant from Thunder Bay and Sault Ste. Marie.Milling operations began in September, 1957. The mill processes a complex base metal ore by differential flotation techniques to produce copper, lead and zinc concentrates. To date some 43 million tons have been milled, qualifying Geco as a rather major base metal deposit.II. BACKGROUND:The Geco concentrator was designed and constructed in the mid 50's. A number of features specific to a concentrator of that vintage provided the justification for the modernization efforts described herein.Firstly, the mill was constructed without any instrumentation, not even pneumatic controls. Solid state electronics, computers and related instrumentation were unheard of, or rather primitive by today's standards.Secondly, some of the major equipment, in particular the flotation equipment, did not compare favourably to that in use today. MacIntosh flotation machines (more commonly known as Mac cells) were installed at Geco. These cells were prevalent in a number of concentrators built by Noranda, including Quemont Mining Corporation Limited, Gaspe Copper Mines Limited and Noranda — Horne Division. The Mac cells were used for copper and zinc rougher and scavenger operations. Some units were also installed for a pyrite recovery circuit that was never operated. In total, 104 Mac cells were installed in the main flotation area of the concentrator.
Citation

APA: L. S. Urbanoski  (1987)  Mill Modernization Program at Noranda Minerals Inc. Geco Division

MLA: L. S. Urbanoski Mill Modernization Program at Noranda Minerals Inc. Geco Division. Canadian Institute of Mining, Metallurgy and Petroleum, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account