Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Practice and Prospects for Methane Predrainage to Prevent Outbursts in Coal Mines In the Congqing Area

    Most coal mines in Chongqing Area are highly gassy mines and liable to outburst of coal cnd methane. In order to harness mine environment and raise the Prodction capacity, methane predrainage is gener

    Jan 1, 1991

  • AUSIMM
    Simulation Model of Gas Injection Aided Dewatering in Underground Mining

    By Kesser Z, Vincze T

    The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha

    Jan 1, 1988

  • AUSIMM
    Circum-Pacific Suspect Terranes and Lost Microcontinents: Chip off the Old Blocks

    A number of terrane reconstructions conflict with global plate histories or with data from adjacent regional studies. Paleogeographic maps have ignored terranes thus are over-simplified. This pape

    Jan 1, 1987

  • AUSIMM
    Copper Metallurgy and the SOx Problem in Japan

    As a result of the rapid economic growth in Japan, environmental problems have become a national concern in the latter half of the In 1967, the Basic Lair for Environmental Pollution Control was en

    Jan 1, 1980

  • AUSIMM
    Gas Chemistry and Isotopic Signature of Fumaroles at Galeras Volcano, Colombia (b0762a99-8e38-4384-81b3-26b04ead1cb6)

    By Sturchio NC, Williams SN, Fischer TP

    Chemical and isotopic analyses of fumarole gases from Galeras Volcano, Colombia provide significant insights into the origin of volatile components in the magma.. Water comprises a mixture of magmati

    Jan 1, 1995

  • AUSIMM
    Directional Blasting Rock Cutting Technology

    By W Z. Liu, Q Q. Shi, H T. Yang, X L. Zhang

    In order to improve the cutting blasting effect of dimension stone mining, the water coupling directional cutting blasting technology was put forward. Based on the test apparatus and special charge co

    Aug 24, 2015

  • AUSIMM
    Applications of an Integrated Structural and Geophysical Modelling Scheme

    By Valenta R. K

    A technique is presented for the integrated forward modelling of the three-dimensional structure and the geophysical response of multiply deformed terrains. This technique allows information collect

    Jan 1, 1995

  • AUSIMM
    Water Quality Changes After Partial Site Remediation at Tui Mine Site, Mt Te Aroha

    By J G. Webster-Brown

    The Tui Mine is located near Te Aroha at the base of the Coromandel Peninsula. It was a lead-zinc mine, which closed in 1973 due to declining concentrate prices, high overheads, and high mercury level

    Jan 1, 2007

  • AUSIMM
    The Thermodynamics of Zinc Oxide in Iron Silicate Slags

    By Lee H. G, Li H, Hayes P

    Slag from the smelting of lead can contain up to 20 per cent zinc as an oxide. An understanding of the lead smelting process and of the subsequent fuming process for the recovery of zinc is enhanced

    Jan 1, 1993

  • AUSIMM
    Update on Instantaneous Outbursts of Coal and Gas

    Among countries afflicted with insLantaneous outbursts of coal and gas, Australia is noteworthy because of lesser disturbances of the seams and of the occurrence of CO2 in the seam gas from place to p

    Jan 1, 1993

  • AUSIMM
    Flow Behaviour of High Solids Brown Coal-Water Suspensions as Liquid Fuels

    By Christie GB, Mainwaring DE, Leong YK

    High solids brown coal slurries have been prepared with concentrations approaching those achieved with bituminous black coals. The high inherent water content and macroporosity of Victorian brown

    Jan 1, 1987

  • AUSIMM
    Integrated Automatization of Longwall Mining System

    By Esaki M, Nishimura K

    This paper describes the results of the field application tests at Miike Colliery on the integrated automatization of the longwall mining system for medium thick coal seam. The purpose of the rese

    Jan 1, 1987

  • AUSIMM
    Shaft Sinking and Drifting with Special Reference to Coal Mining in the Southern District of New South Wales

    Since the discovery of coal of the Southern coalfield (Illawarra 1797, Burragorang 1806) coal mining has grown progressively to the thriving industry of today. Early shallow escarpment mining requ

    Jan 1, 1976

  • AUSIMM
    Terranes, Tectonics and the Pacific Rim

    The movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th

    Jan 1, 1990

  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    Removal of Bismuth from Copper by Vacuum Refining

    By Pollard DM, Willis GM

    The removal of bismuth from liquid copper in a vacuum furnace was studied over a range of pressures. The rate determining step changes from diffusion in the gas at pressures above 0.2 Torr to appr

    Jan 1, 1980

  • AUSIMM
    The Management of Minewater Salinity in Ballarat

    By Sharmil Markar M

    Ballarat Goldfields Limited is currently re-opening the old workings of the East Ballarat Goldfield which contain an estimated 1800 ML of groundwater. The disposal of this 'minewater' was of

    Jan 1, 1990

  • AUSIMM
    Mineral Resource Modelling and Reconciliation in Ultra Deep Underground Gold Mines

    By R C. A Minnitt

    The Witwatersrand Supergroup is host to the world’s largest gold deposits. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are either known, estima

    Aug 22, 2011

  • AUSIMM
    Stochastic Optimisation of Mineral Value Chains – Developments and Applications for the Global Optimisation of Mining Complexes with Uncertainty

    By R Dimitrakopoulos, R Goodfellow

    One of the primary objectives when optimising a mining complex is to maximise its value for the primary stakeholders. In order to achieve this objective, it is necessary to holistically optimise all a

    Nov 24, 2014

  • AUSIMM
    The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

    The reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1

    Jan 1, 1984