Search Documents

  • CIM
    Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter

    By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi

    This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel

    Jan 1, 2019

  • AUSIMM
    Australia and New Zealand: Sharing the Vision or the Confusion?

    Great new drilling results! What's so sinful about being a multi-national company? Overseas protestors flown to Australia for a free holiday How to counter the protectionist danger?

    Jan 1, 2000

  • SME
    Implementing and using a fully integrated maintenance management information system

    By Paul D. Tomlingson

    Part two of this two-part series covers the use of an integrated information system with administrative information, including error and absentee reports as well as open work files. Part one (ME, J

    Jan 8, 1985

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • AIME
    Secondary Recovery and Pressure Maintenance - Oil Recovery in Five-Spot Pilot Flood

    By B. H. Caudle, L. G. Loncarie

    Pilot flooding is one method of evaluating a proposed secondary recovery project. However, the amount and rate of oil recovery from an unconfined pilot area is not usually the same as from an equal ar

  • DFI
    Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - Synopsis

    By Sanjeev Malhotra

    The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins

    Jan 1, 2000

  • IIMP
    Automatización de la planta concentradora de BHPBilliton Tintaya S. A.

    By Valentín Choquenaira Bombilla

    El presente trabajo describe el proceso de automatización de la planta concentradora BHPBilliton deTintaya desde el punto de vista del usuario final y así proporcionar una visión global sobre los asp

    Sep 12, 2005

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • SME
    Alternative Final Cavern Linings For The East Side Access Transit Project

    By Colin Barratt

    The East Side Access (ESA) project is the largest underground rail infrastructure project under construction in New York City, USA. The Manhattan segment of the project is to be mined through rock and

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • AUSIMM
    An Oxygen and Carbon Isotopic Study of Some Gold Deposits of Eastern Australia

    By Wilson A. F

    The use of stable isotopic measurements as a technique for elucidating the origin and history of the water in hydrothermal fluids is relatively new. Recept studies have emphasized the importance of me

    Jan 1, 1981

  • CIM
    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • SME
    Leveraging Your Energy Management Resources: Applications For The Mining Industry

    By V. Bush, T. G. Killingsworth, E. P. Ruffel

    Effective and sustained corporate energy management programs are becoming a necessity for energy users as electricity deregulation laws are enacted on a state-by-state basis across the country and env

    Jan 1, 2002

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • CIM
    The Metallgesellschaft Research Laboratories, Some Aspects

    By G. S. Farnham

    Abstract This paper lists the interests of the Physical Metallurgy and Chemical Research laboratories of the Metallgesellschaft, which were visited by the authors, members of a group of Canadian in

    Jan 1, 1946

  • AUSIMM
    Environmental Management Plans to Reduce Mine Closure Costs

    By I F. Bell, K P. Hammerschmid

    Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning

    Jan 1, 1995

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • SAIMM
    A Methodology for Determining the Erosion Profile of the Freeze Lining in Submerged Arc Furnace

    By H. Dong

    This paper presents a heat conduction model to determine the erosion profile of freeze linings in a ferronickel submerged arc furnace. Kirchhoff transformation was adopted to simplify the nonlinear eq

    Jan 1, 2014

  • AIME
    Forthcoming Meetings Of Societies (8908422e-097f-46a7-b1b1-0870b6d1f1e5)

    Organization Place Date 1917 Electric Power Club Hot Springs, Va. June 11-14 Society for the Promotion of Engineering Edu¬ cation Evansville,Ind. June 19-22 American Institute of Chemical Engineers

    Jan 6, 1917