Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography Software

    By Larry Stolarczyk

    A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A

    Jan 1, 2003

  • SME-ICGCM
    Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings (55897abb-5ce0-4661-bf26-04d03fe5d67b)

    By Gabriel Esterhuizen

    The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stability

    Jan 1, 2004

  • SME-ICGCM
    Discriminating Mining Induced Seismicity from Natural Tectonic Earthquakes in the Wasatch Plateau Region of Central Utah

    By Kristine L. Pankow, Keith D. Koper, Michael K. McCarter, Jared R. Stein

    "The Wasatch Plateau region of central Utah contains a number of active underground coal mines in an area of well-documented natural seismicity. As a result, there are several hundred seismic events r

    Jan 1, 2015

  • SME-ICGCM
    Overburden Strata Movement for the Longwall Mining of Shallow Seam under the Gobs of Room and Pillar Mining

    By Fangtian Wang

    The fully mechanized longwall mining was employed in a shallow coal seam that was under the gobs of room and pillar mining and overlain by thin bedrock and thick loose sands. Operational practices hav

    Jan 1, 2014

  • SME-ICGCM
    A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery Entries

    By John C. Stankus

    The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un

    Jan 1, 2014

  • SME-ICGCM
    Utilization Of Polymer Grid Structures In Shield Recovery Operations

    By Brian E. Travis

    Recent Developments in the utilization of polymer grid structures for Longwall Shield Recovery operations are discussed. Specifically: various Longwall screen designs and the numerous methods employed

    Jan 1, 1993

  • SME-ICGCM
    Mechanical Properties of Pizza Pans and Their Effectiveness in Underground Coal Mining

    By Brian Daniels, James Farroni

    "Draw rock (small rock that forms/falls when bolting the roof and/or rib) is the cause of numerous injuries annually. These injuries result in lost work hours and low morale. The report below explains

    Jan 1, 2010

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    The Study on the Overlying Strata Movement Features and Development Characters of the "three Zones" in Ultra-Thick Coal Seams

    By Xuexin Ding, Weijie Wei, Jinwang Zhang, Yi Chen, Shengli Yang

    "Many ultra-thick coal seams exist in Xinjiang and the northern part of the Inner Mongolia. These coal seams are more than 30-40m thick. This kind of the thick coal seam is too difficult to extract in

    Jan 1, 2016

  • SME-ICGCM
    Factors Influencing Intersection Stability in U.S. Coal Mines (dc39f664-0f70-474b-be24-4adbb66c7510)

    By Gregory Molinda

    Groundfalls are much more likely to occur in coal mine intersections than in entries. NIOSH is using the experience of U.S. coal mines to determine the factors which influence intersection instability

    Jan 1, 1998

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal Seams

    By Yang Li

    For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall

    Jan 1, 2014

  • SME-ICGCM
    The Interaction of Unique Geology and Retreat Room?and?Pillar Mining on Overburden Barrier Performance at the Grove No. 1 Mine

    By Anthony T. Iannacchione

    This study, funded by the Appalachian Research Initiative for Environmental Science (ARIES), examines how mine layout, mining method, and geology interacted to allow water from the Grove No.1 mine poo

    Jan 1, 2013

  • SME-ICGCM
    Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal Field

    By D. W. H. Su

    This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal

    Jan 1, 1995

  • SME-ICGCM
    Inflatable Rock Bolt Bond Strength vs. Rock Mass Rating (RMR): A Comparative Analysis of Pull–Out Testing Data from Underground Mines in Nevada

    By Chase K. Barnard, Rahul Thareja, Sean Warren, Rajagopala Kallu

    "Inflatable rock bolts are commonly utilized for ground support in Nevada underground mines, however, there is limited information regarding what factors influence the bond strength of these bolts. Bo

    Jan 1, 2015

  • SME-ICGCM
    Shear Mechanism for Mining-Induced Fractures Applied to Rock Mechanics of Coal Mines (26fab274-0576-48ca-b03a-d4a9f18550cb)

    By Brian White

    Two examples of en echelon mining-induced fractures seen in hard¬rock mines provided a basis for inferring that fracture zones and bedding plane separations immediately surrounding mine openings are p

    Jan 1, 2002

  • SME-ICGCM
    Rock Reinforcement Longevity

    By Francis S. Kendorski

    Rock reinforcement has been in widespread use and generally has been accepted in underground mining and tunneling since the 1950s. The first rock reinforcement technologies employed were mechanical an

    Jan 1, 2000

  • SME-ICGCM
    Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal Mines

    By Yoshiaki Fujii

    Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat

    Jan 1, 1992

  • SME-ICGCM
    Progress in Managing the Geotechnical Aspects of Longwall Face Recovery

    By David Hill

    "End of panel longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by operators, with major loss potential should problems occur. The paper presents Austra

    Jan 1, 2010

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992