Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Effective Planning Of Underground Space?Planning And Implementation Of The First Underground Water Reservoirs In Hong KongBy T. H. Chan
As the University of Hong Kong and their advisors planned their new Centennial Campus it became clear that they would have to re-provide existing water reservoirs on an adjacent site with new salt wat
-
Improving Truck-Shovel Energy Efficiency Through Discrete Event ModelingBy K. Awuah-Offei
Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The
Jan 1, 2012
-
Virtual Reality Simulator For Training Miners To Install Rock Bolts Using Jackleg DrillBy J. Warmbrodt, D. Apel, D. Nutakor, L. Grayson, M. Hilgers
MinerSIM is an augmented reality system with integrated hypermedia that is suitable for training underground miners in the basics of using a jackleg drill to install rock bolts. While statistical evi
Jan 1, 2007
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu
-
Helping Banks To Manage Mineral Land TrustsBy S. M. Pickering
Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties
Jan 1, 2002
-
Slurry Shield Tunneling in Portland—West Side CSO Tunnel ProjectBy James J. Kabat, James A. McDonald
Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat
Jan 1, 2007
-
Reducing Enclosed Cab Drill Operator’s Respirable Dust Exposure At Surface Coal Operation With A Retrofitted Filtration And Pressurization System (83490ae4-de2e-4245-8093-9fec0a123d31)By W. A. Heitbrink, J. D. Ashley, R. E. Gresh, J. A. Organiscak, A. B. Cecala
Many different types of mobile equipment used in surface coal mining utilize enclosed cabs to protect equipment operators. The overburden removal process is extremely dusty and can cause excessive ex
Jan 1, 2002
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Sedimentary Phosphate Deposits In Baja California, MexicoBy G. P. Salas
I.- In order to keep pace feeding its fast growing population, Mexico with only about 20% of its surface suitable for intensive agriculture, will need the application of modern foodgrowing techniques.
Jan 1, 1978
-
Amax Uses Practical Approach to Dewatering at Its Sleeper MineBy W. David Tyler
Any mining or engineering-construction excavation that extends below the water table must be dewatered. In many situations, the ground is of low permeability or the workings extend only a short distan
Jan 1, 1991
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Numerical Analyses Of Stability Of Three-Way And Four-Way Coal Mine Intersections In IllinoisRoof falls in coal mines typically occur in or around intersections and this has not changed in the last two decades. This research develops an improved scientific understanding of stress distribution
Feb 27, 2013
-
IntelliMine - Innovative technologies and concepts for the sustainable and intelligent Deep Mine of the futureBy H. Hejny
"The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only
Jan 1, 2011
-
The Importance Of Water Utilization For Maximizing Grinding Circuit Classification System Efficiency - Preprint 09-067The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill?s grinding performance. The factors which affect cir
Jan 1, 2009
-
Variations In New Mexico Concrete Through TimeBy Kristen E. Coose
Concrete is a mixture of a fine aggregate (sand), a coarse aggregate (gravel), cement, and water. Cement itself is the most expensive of the ingredients but generally amounts to only about 10% of the
Jan 1, 1999
-
Future Safety And Health Needs In The Mining IndustryBy J. D. McAteer
It is widely agreed throughout the mining community that federal mine safety and health legislation administered by the Mine Safety and Health Administration (MSHA) deserves significant credit for the
Jan 1, 1996
-
Maximizing Value By Protecting Your Intellectual Property Assets ? IntroductionBy S. E. Chetlin
In the mid-1970?s, the market value of tangible assets of S&P 500 companies far outstripped the value of intangible assets, including intellectual property (e.g., 83% tangible assets v. 17% intangible
Jan 1, 2012
-
Reserve’s Process Modifications Succeed at Silver BayBy Charles L. Allie
Since Reserve Mining Co. began commercial operations at Silver Bay, MN, some 25 years ago, major improvements in taconite processing technology have become available. In addition, significant new gove
Jan 12, 1980
-
Tunnel Interaction: Hydraulic, Mechanical, And Hydromechanical ApproachBy John Kinneen, Sunghoon Choi, Arne Fareth, Edward S. Barboe, Kyle R. Ott
A new water treatment plant is to be constructed for a portion of the water supply system of New York City. The project includes construction of new water conveyance tunnels crossing perpendicular and
Jan 1, 2007