Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Factors Affecting The Quality Of Tunnel Infrastructure At Premier Diamond MineBy M. S. Smith
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The condition of tunnels at Premier has deteriorated to such an extent that an objective viewpo
Jan 1, 2004
-
State of labour protection at coal mines analysis on the basis of economic riskBy S. G. Gendler
One of the ways of trauma and occupational diseases level reduction is noted to be the improvement of the labour protection measures planning. As an indicator for prospective trends determination in t
Jan 1, 2003
-
Hot Work Modelling Of Two Equivalent Low Carbon Strip Steels Produced, Respectively, By The Cold Charge Route And By The Hot Charge RouteBy W. Stumpf
Mean flow stress analyses from plant mill logs for the conventionally produced hot rolled low carbon steel from the Ispat Iscor Vanderbijlpark strip producing plant, indicated a higher temperature sen
Jan 1, 2004
-
Hydrothermal Preparation of Biochar from Pent Coffee Grounds, and its Application for the Removal of Cadmium from Coal Tailings LeachateBy R. Weideman, M. Le Roux, F. B. Waanders, Q. P. Campbell, E. Fosso-Kankeu, D. Moyakhe
"*Paper written on project work carried out in partial fulfilment of B.Eng (Chemical Engineering) degreeSynopsisSpent coffee grounds were transformed into biochar using a hydrothermal method. Some of
Jul 1, 2019
-
Extending Zinc Production Possibilities Through Solvent ExtractionThe Modified Zincex® Process, developed by Técnicas Reunidas, is highly flexible dealing with a wide range of pregnant leach solutions. No matter if those solutions are produced from primary or second
Jan 1, 2002
-
A Preliminary Investigation Into The Metallurgical Efficiency Of An Enhanced Gravity SeparatorBy F. Peer
This Technical Note was presented as a poster at the Western Cape Mineral Processing Symposium held in August 2001 The cleaning of fine coal (-1000 µm) in today?s coal preparation plants is an econ
Jan 1, 2002
-
Diamond Value Management - Knowledge Management And The Measurement Of Value AdditionBy P. J. Rider
Diamond Value Management?s objective is to achieve $/ton revenue improvement across De Beers group mines. The respective %improvement contributions are measured against targets set by each of the oper
Jan 1, 2003
-
The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)By V. Mathebula
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv
Jan 1, 2004
-
Simulated Rockburst Experiment - Evaluation Of Rock Bolt Reinforcement PerformanceBy A. T. Haile
Detailed monitoring of the response of the rock mass between rockbolt reinforcement units subjected to a simulated seismic source has been successfully conducted. This work has shown the increase in a
Jan 1, 2001
-
Solvent Extraction As An Enabling Technology In The Nickel IndustryBy G. Bacon
The past decade has witnessed unprecedented growth in the development and implementation of solvent extraction technology in the extractive metallurgy of nickel and cobalt. Solvent extraction is provi
Jan 1, 2002
-
The Past, Present And Future Of Shotcrete At Elandsrand Gold MineBy K. Collett
Elandsrand started shotcreting back in 1991. This paper will share the experiences of the mine by looking into the past, the present situation and the way Elandsrand plans to approach the future. It l
Jan 1, 1998
-
Atmospheric Oxidative and Non-Oxidative Leaching of Ni-Cu Matte by Acidified Ferric Chloride SolutionBy L. M. Sekhukhune
The atmospheric leaching of copper-bearing matte by acidic ferric chloride solution was studied at the laboratory scale. The aim was to achieve maximum copper and nickel recovery by investigating the
Jan 1, 2014
-
The Effect of Solids Suspended in a Nickel Electrolyte on Deposit MorphologyBy K. G. Matshika
"Nickel electroplating from sulphate electrolyte is an efficient process. To achieve good quality cathode, however, parameters such as temperature, nickel concentration, pH, electrode alignment, elect
Jan 1, 2015
-
Predicting Coal Pillar Life In South AfricaBy J. N. Van der Merwe
The data base of failed coal pillars in South Africa was analysed with regard to the time of failure in an effort to develop a method to predict how long after their formation coal pillars will fail.
Jan 1, 2003
-
Time-Dependent Tunnel Deformation At Hartebeestfontein MineBy J. D. Bosman
The problems associated with squeezing rock conditions in tunnels are well known and have been extensively investigated in the past. Although squeezing conditions are predominantly found in tunnels de
Jan 1, 2000
-
Sidewall Design For Improved Lining Life In A PGM Smelting FurnaceBy I. McDougall
The matte/slag tidal zone in a nickel-copper-iron-sulphide matte smelting furnace is subject to severe process conditions that can lead to premature failure of the lining. The MgO-FeO-SiO2 slag is agg
Aug 1, 2013
-
Witbank-Middelburg Branch Minutes of a Meeting Held at the Moth Hall, Witbank, ON 29th January, 1970Mr J. Meintjes (Chairman) was in the chair. There were also present: 7 Members: Messrs B. D. McNeice, A. Bain, G. E. Carlyon, C. H. Coxon, B. F. v. d. Merwe, A. C. Hofmeyer, H. J. R. Way. 4 Associa
-
Some Benefits Arising From The Establishment Of A Mining Infrastructure Prior To The Commissioning Of The ShaftBy H. C. de Wet
The predevelopment and preparation of a total infrastructure in a deep level mining environment, prior to the shaft system being commissioned has major advantages. This paper intends to indicate these
Jan 1, 1997
-
Metallurgical Factors That Affect The Strand Width During Continuous Casting Of DIN 1.4003 Stainless SteelBy C. Siyasiya
One of the problems that is occasionally encountered during the continuous casting of DIN 1.4003 stainless steel (hereafter referred to as 1.4003) is the side bulging effect, a problem that is general
Jan 1, 2005
-
Iron slag dump material and leachate treatmentBy A. C. Moorgas, J. Divall
This study investigates the feasibility of using waste iron slag, the by-product from a mineral sands processing works, in road construction. The study includes the different options investigated for
Jan 1, 2003