Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Case Study of Near-Field Vibration Monitoring, Analysis, And ModelingBy Tamara Whitaker, James Gunderson, Ruilin Yang
This paper presents the results of a vibration control project conducted in soft overburden at a surface coal mine located in the western United States. The study uses near-field blast vibration monit
Jan 1, 2008
-
Maximizing Drill Factors in Construction BlastingBy Pat McLaughlin
Blast design in the construction industry has often been based on past practice or powder factors. This is to some extent understandable, since construction projects do not have the longevity of minin
Jan 1, 1994
-
The Effects of Short Delay Times on Rock FragmentationBy Joseph Nawrocki, Margaret Hettinger, Dr. Catherine Johnson
"Optimized rock fragmentation is essential for minimizing downstream costs to mining operations.Photographic fragmentation analysis, vibration monitoring, and high-speed video all providemeasurements
Jan 1, 2016
-
Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)By Daniel Hauer
Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed
Jan 1, 2006
-
Updates in the Determination of Dynamic Pressure TestsBy Alejandro Ferrada Vergara
Most blasting techniques that are designed to improve fragmentation and subsequently improve ore work index to downstream comminution processes, apply powder or energy factor increases, either by stre
Jan 1, 2016
-
Journal: Near Field Vibration Monitoring for Rock Mass Damage Control Tala Hydroelectric Project, Bhutan IndiaBy H. Venkatesh, Balachander R.
This article discusses the method that was adopted for controlling damage to rock mass while excavating an underground powerhouse cavern at Tala Hydroelectric Project. It discusses in detail the near
Jan 1, 2006
-
Delay Blasting Cap Corrosion of the Nonel by Acid WaterBy Noelia Valencia, Carlos Agreda, Jean Arenales, Juan Llerena
"In this technical paper is reported the several tests and the preliminary results that has been obtained so far. It must be emphasized that this investigation was started several months ago.On the ot
Jan 1, 2016
-
Blast Designs and Instant Diagnostics Using the SVC500 Digital, High-Speed Smart Video Camera SystemBy Bruce Vandenberg, Andy Battfay, Don Lake, Steve Conway, Jeff Yorsz
"High-speed motion pictures are an invaluable resource for blasting analysis. Whether processed by the human eye or a computer, this imagery can provide important insight into a blast and its effects.
Jan 1, 1994
-
Blasting Seismograph Comparison in Side-by-Side Blast Monitoring TestsBy Kenneth Eltschlager, Jim Ratcliff, Michael Mann, Edward Sheehan
The Appalachian Blaster Certification Delegation initiated a study to compare the consistency of measurements from blasting seismographs. Six blasts were monitored at surface coal mines in West Virgin
Jan 1, 2015
-
Demonstrating Competence from Charge Hands to Chartered EngineersBy Ken Cross
This paper aims to demonstrate that explosives organizations and workers have a legal, moral and financial duty to be able to demonstrate their competence when required, and how that may be achieved a
Jan 1, 2013
-
Determining and Mitigating the Effects of Firing a Linear Shaped Charge UnderwaterBy Brian T. Burch, Paul N. Worsey
When fired, submerged Linear Shaped Charges (LSCs) lose all effectiveness in the cutting of steel. Users in underwater applications have reported having to substantially increase the charge size to th
Jan 1, 2015
-
Digitized, Integrated and Optimized Drill and BlastBy Sushil Bhandari, Amit Bhandari
Drilling and Blasting are core operations in a mine. They impact all the downstream operations and their costs. Digital technologies exist for optimizing both drilling and blasting for many years. How
-
479 Charges, 13 Decks...120 Meters Above a Crushing PlantBy Thierry Bernard
This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.
Jan 1, 2015
-
Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field ControlsChoosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra
Jan 1, 1998
-
Masterblaster Blasting Management SystemBy Chris Uys, Johan Labuschagne
Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th
Jan 1, 1997
-
AN Railcar Derailed Debris Collection–Data Analysis UpdateBy Brandon Fryman, Josh Hoffman, Rhys Baker
A post-detonation debris collection project was led in conjunction with a large ammonium nitrate(AN) railcar detonation conducted by the Department of Homeland Security-Transportation Security Adminis
-
Portable, Multi-Channel and Continuous Velocity of Detonation RecordersBy Jackson R. Pressley, Bruce Vandenberg
An explosive’s velocity of detonation, (VOD), can be used to indicate a number of important characteristics regarding the product’s performance, under specific field and test conditions.
Jan 1, 1997
-
Experience with the change from cartridged to bulk site sensitized emulsion products.By Peter Moser, G. Reihholf
Holcim, one of the world's leading suppliers of cement, aggregates and concrete, has set up a few years ago a working group “Quarry” in order to optimize the performance of its central European quarry
Jan 1, 2006
-
Optimization and Precision in Mining, The Simfrag ModelBy Jorge Cárdenas, Alejandro Luna
In mining simulation for fragmentation results prediction is of utmost importance to study feasibility, ensure safety, and estimate the correct use of resources in drilling an explosive to meet requir
Jan 21, 2025
-
Rock-to-Sensor Transmissibility of Vibrations?Part 2By R Castedo, L. M. Lopez, J. A. Sanchidrian
In 2014 the authors presented results from 13 tests made with two blasting seismographs on a vibration exciter. They measured coupling transmissibility as function of frequency (i.e. ratio of the vel
Jan 1, 2015