Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of the Milling Design of the Chessy Project Near Lyon, France

    By Gallet M, Watsford R. M S

    The 1989 feasibility study of the chessy, france, copper, zinc, pyrite and barite orebody was based upon a classical flowsheet. The flowsheet included, three stages of crushing, conventional rod and

    Jan 1, 1991

  • AUSIMM
    US Bureau of Mines Coal Mining Automation Research

    By Bevan JE

    The US Bureau of Mines is conducting research to improve the health and safety for underground coal miners, and the efficiency of the mining systems that are used. In 1986, the Bureau began a major re

    Jan 1, 1991

  • AUSIMM
    Overburden Geochemistry and Acid Rock Drainage Scale-Up Investigations at the Grasberg Mine, Papua Province, Indonesia

    By J Andrina, D Richards

    The Grasberg is a large copper and gold open pit mine operated by PT Freeport Indonesia and located in the high equatorial mountains of Papua Province, Indonesia. The climate is alpine/sub-alpine with

    Jan 1, 2003

  • AUSIMM
    Interferometric Synthetic Aperture Radar (InSAR) and its Potential to Monitor Subsidence Over Caving Zones Induced by Underground Mining

    By H Zahiri

    Utilisation of the InSAR technique for monitoring of subsidence in mining areas, employing open pit and underground mining methods, has large potential due to sensitivity and safety issues associated

    Jan 1, 2008

  • AUSIMM
    Direct Fuming of Zinc from Sulphide Concentrates

    By Iley J. D

    The production of zinc from low grade concentrates, particularly those high in iron, has a poor economic return due to a combination of higher concentrate transport costs, increased processing costs

    Jan 1, 1993

  • AUSIMM
    Using Waste From Sand Mining to Reduce Environmental Impacts Coming From the Stocking Process

    By L Soares, W T. Hennies, F Fujimur

    Barra Bonita reservoir, located in the Sao Paulo State, Brazil, has been mainly used for local navigation and electricity generation to supply a prosper region in the country. Sand mining activities i

    Jan 1, 2003

  • AUSIMM
    Some Notes on Carbide Tipped Rock Drill Bits

    For several decades miners have been obliged to maintain a vast supply of sharp steels at the working face to meet the hungry needs of rock-drills. In medium and large size mines this has meant the se

    Jan 1, 1948

  • AUSIMM
    The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia

    This paper examines the various stages of development and design work which were necessary to develop the cemented rock fill system for copper mining at Mount Isa. The reason for a cemented sand fil

    Jan 1, 1973

  • AUSIMM
    Coking Coal and Iron Ore ù Comparisons and Contrasts

    The products from beneficiation present themselves at opposite ends of the spectrum, and yet numerous synergies exist in the preparation of coking coal and hematite iron ore products for their common

    Jan 1, 2005

  • AUSIMM
    Surface Reactivity of High-Sulfide Copper Mine Tailings Under Shallow Water Cover Conditions

    By A D. Paktunc

    The surface reactivity of underwater deposited, high-sulfide copper mine tailings was evaluated under fresh and saline water cover conditions by measuring the surface and pore water quality as a funct

    Jan 1, 2003

  • AUSIMM
    Some considerations on the engineering performance of subaqueously‐deposited silts

    By D Reid

    Many of the relevant engineering behaviours of tailings are controlled to a large degree by the density of the material. For example, loose tailings are prone to brittle strength loss, while dense tai

    Jul 1, 2021

  • AUSIMM
    Recent Developments in Shaft Sinking and Tunnelling in Melbourne's Sewerage System

    One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing

    Jan 1, 1976

  • AUSIMM
    Possible Heat Stress Problems Associated with Underground Mining in the NT, with Particular Reference to Woodcutters Mine

    By Wetzeil N

    High ambient temperatures combined with high surface humidity in the north of Australia and, in particular, the northern areas of the Northern Territory can make underground workplaces relatively in

    Jan 1, 1994

  • AUSIMM
    Driving Future Tunnels with Mechanical or Explosion Energy - A Blasting Engineer's View

    The current drill-and-blast method of tunnelling is cyclic and, for this reason above all others, has a future application potential which is lower than that of continuous methods. There is scope

    Jan 1, 1987

  • AUSIMM
    The Use of Electronic Detonators to Access Additional Aggregate Reserves Adjacent to Subsurface Structures

    By R Farnf, M Pegden, S Hosein, T White

    A number of theoretical papers have been published outlining the use of electronic detonators to limit peak particle vibrations levels, but few empirical studies have been undertaken and even fewer ex

    Jan 1, 2007

  • AUSIMM
    Mathematical Economic Models of Assessment of Technological Progress in the Mining Industry

    Mathematical economic models for assess ment of technological progress in the mining industry in the USSR are discussed. The models are based on a simple index, TT which approxi- mates the rate of g

    Jan 1, 1977

  • AUSIMM
    A Study of How the Velocity of Detonation Affects Fragmentation and the Quality of Fragments in a Muckpile

    Blasting in Norwegian mines is often carried out by contractors who tend to look for the cheapest solution, without concern about fragment quality. The requirementsfor a contractor are usually only

    Jan 1, 1995

  • AUSIMM
    TBM Use in Mine Development

    By Zamel G. I, Zenari L. P

    Technological developments in modem Tunnel Boring Machines (TBMs) and associated back-up equipment are offering significant alternatives for mining operators to consider, in the selection of equipment

    Jan 1, 1993

  • AUSIMM
    Rehabilitation, Recommissioning and Upgrading of the Leinster Nickel Concentrator

    By Millett R

    In January 1989, Western Mining Corporation (WMC) acquired the Perseverance and Rocky's Reward orebodies and associated infrastructure from the Agnew Mining Company (AMC). AMC had closed the o

    Jan 1, 1991

  • AUSIMM
    Resilient Design of Large Open Pit Slopes

    By S M. Arndt, D Tyler, F Reusch

    Although significant advances have been made in understanding the mechanics of pit slopes, numerical modelling hasnÆt significantly impacted on the reliability of the design process. It is well known

    Jan 1, 2007