The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
813 KB
Publication Date:
Jan 1, 1973

Abstract

This paper examines the various stages of development and design work which were necessary to develop the cemented rock fill system for copper mining at Mount Isa. The reason for a cemented sand fill development program together with details of the test work undertaken are briefly outlined. The testwork associated with the selection of a suitable local rock to supple- ment the cemented hydraulic fill is discussed, as is the method for underground placement and mixing of the graded rock with the cemented hydraulic fill. The design features of the final system which incorporates a graded rock handling system and a cemented hydraulic fill reticula- tion system is outlined.
Citation

APA:  (1973)  The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia

MLA: The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia. The Australasian Institute of Mining and Metallurgy, 1973.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account