Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Problem-Solving Curriculum for Metallurgical Process EngineeringPart of a four-year course in metallurgy, dealing with metallurgical process engineering, was designed for students to acquire knowledge and skill from physical science, metallurgy, process engine
Jan 1, 1984
-
Research and Its Application for Rehabilitation after MiningMy closest personal connection with the problems of rehabilitation comes from two years spent on a project at Weipa. At the beginning I am fairly certain that the engineers did not understand the me
Jan 1, 1971
-
Proposals for A Better System of Mining TenureThere is very little in Australian mining law that sets out the rights of mining tenement and exploration licence holders as against other parties who wish to carry out ground or aerial surveillance o
Jan 1, 1996
-
Mine Risk Management for the Unexpected - Apache ExplosionAustralia had been enjoying a market boom led by the mining sector and West Australian mines were leading the way to satisfy the massive demand for our natural resources, especially from China. Howeve
Jan 1, 2009
-
Designing for Maximum Production from Trucks and LoadersIn many mining operations, the truck and loader equipment represents the bulk of the invested capital and the majority of the mine operating cost. The profitability of these mines is therefore crit
Jan 1, 1983
-
The Effect of Highly Saline Ground Water on the Gold Adsorbing Capacity of Ion-exchange ResinsBy Browner R, Kyle J
The adsorption of gold cyanide by the weak base ion exchange resins, PAZ-4¦ and Duolite A-7C, the neutral polymeric adsorbent, Amberlite XAD7¦, and the strong base resins, PAZ-8~a and IRA-400 have b
Jan 1, 1991
-
Management of Tailings and Other Wastes for RehabilitationBy Leggate J
In the past many coal mining projects commenced without any consideration being given to eventual site rehabilitation. Now that site rehabilitation is assuming greater importance with changing comm
Jan 1, 1991
-
Ore Block Optimisation for Open Pit Grade ControlBy M B. McKevitt, W J. Shaw
The main task of grade control on a daily basis is to define the material that should be mined to a destination under various categories. This can be determined by grade, lithology, quality and blendi
Jan 1, 2009
-
Performance Driver Trees for Optimising Open Pit OperationsPerformance driver trees or KPI trees are reasonably well-known tools for analysing performance in mining operations. However, the tools are often not user friendly. They may be technically correct bu
Jan 1, 2007
-
Pilot Tunnel and Blast Enlargement for Vibration ControlBy Lunardi P, Pelizza S
The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section
Jan 1, 1987
-
Solute Transport Studies for a Tailings Disposal SiteBy P H. Warton
It is proposed to construct a gold extraction plant at Matatoki, near Thanes. Ore to be processed at the mill will come from reopened and enlarged underground mines north of Thanes. The project has be
Jan 1, 1987
-
Inseam Drilling for Gas and Exploration - Recent AdvancesIn-seam drilling is conducted mainly to drain coal of gas and/or water prior to development or extraction. The requirements of inseam drilling for gas drainage have mainly surpassed the technical limi
Jan 1, 1998
-
A Case For Coal Mining Research In AustraliaThe Bowen Basin coal field is an important energy resource. A relatively small proportion is avail- able by open cut operations. Responsible men throughout the world have warned of the need to incr
Jan 1, 1976
-
Ammonia Leaching: An Alternate Route for Copper RecoveryBy K Ellis, K Quast, R Newell
The use of ammonia as a leaching agent in the recovery of copper from ores and concentrates has a number of potential benefits. These include the ability to treat ores with an acid consuming gangue, n
Jan 1, 2000
-
Tunnelling Under Steep, Dangerous SlopesBy Shibata Y, Shimizu R, Fukushima A
Kobe is divided by the Rokko Mountains, runn- ing from east to west. The southern section of Kobe is highly developed in contrast with the northern section, but big, new residential pro- jects like
Jan 1, 1987
-
Essentials for Estimating Ore Reserves in Alluvial DepositsThe grades of alluvial ore deposits are low compared with grades of hard rock mining. This factor, combined with other parameters of irregular distribution of particles, bedrock irregularities, siz
Jan 1, 1987
-
The Exploration for and Economic Appraisal of AsbestosAsbestos is a commercial term applied to fibrous varieties of several minerals, the properties of which are not generally appreciated by the majority of geologists. A thorough knowledge of these pro
Jan 1, 1971
-
Development of Design Criteria for Upgradeable Friction HoistsFuture depth and production limitations of an ore hoisting system are fixed by its initial design criteria. There is little scope to extend these limitations once installation is completed. Depth and
Jan 1, 2005
-
Designing of New Energy-Saving Cutting Drums of Longwall ShearersBy P Cheluszka, M Jaszczuk, P Sobota
This paper refers to a new idea of stereometry of cutting drums of longwall shearers designed to get medium and hard to mine coals. A new way to place picks on a drum enables to readjust a number of p
Jan 1, 2003
-
Expansion at the Martha Mine, WaihiThe Martha Mine is an open cut operation situated in the midst of Waihi town which has been operating since 1987. Since then it has produced some 700,000 ounces (oz) of gold and 4,000,000 oz of silver
Jan 1, 1997