Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Oxygen Pressure Measurements of Silica-Saturated Iron Silicate Slags by Solid Electrolyte Galvanic Cell

    By Ono K, Oishi T

    Electrochemical determination of the oxy- gen partial pressure in the Fe-0-SiO 2 ternary systems saturated with solid silica was done by measuring the activity of oxygen in a silver bath in equilib

    Jan 1, 1980

  • AUSIMM
    Are there differences in size distribution when comparing conventional crushing and HPGR?

    By I Ritchie, G Lane, C Morley, D Yataco

    Marcobre SAC (Marcobre) is developing the Mina Justa project in Peru. The project has a lower grade oxide orebody overlaying the higher grade sulfide orebody. The oxide ore is treated by acid leaching

    Sep 11, 2017

  • AUSIMM
    The Design and Construction of a "Batcave"

    By D Dickson

    The properties along Ida Avenue in Mosman stand 10 m above the road on an outcrop of Sydney sandstone. Access to the houses is generally via a long steep staircase. The owner of 22 Ida Avenue identifi

    Jan 1, 2008

  • AUSIMM
    The Elements Of Raise Drilling

    This paper discusses basic practices of operation applied to raise drilling. It draws attention to critical areas that tend to be neglected. A brief history covers development of raise drills. The

    Jan 1, 1977

  • AUSIMM
    Solid Solution of Tetrahedrite in Chalcopyrite and Bornite

    Records of ex-solution intergrowths with tetrahedrite as a component are rare. Intergrowths of this nature of tetrahedrite with galena have been described by Guild (1917) and Schneiderhohn (1922), and

    Jan 1, 1946

  • AUSIMM
    Automation in Underground Drilling, Loading and Transportation

    By Ulvelin K, Antila K

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    Uranium Ore Deposit at Mary Kathleen

    By Munro DL

    The Mary Kathleen uranium deposit is in north-west Queensland, approximately halfway between the townships of Mount Isa and Cloncurry, at long. 1400 009 E and lat. 200 44' S. The deposit Iwas d

    Jan 1, 1968

  • AUSIMM
    Thermodynamic Modelling of Metallurgical Processes by the Csiro-Sgte Thermodata System

    By Wadsley MW

    This paper gives an overall view of the CSIRO-SGTE computer system for thermodynamic calculations. The basis of the system is the coupling of a large self-consistent numeric data bank of thermodyn

    Jan 1, 1984

  • AUSIMM
    Structural Control of Gold Mineralisation at a Plate Boundary: The Kyauk Pahto Photogeological Case History, North-Central Burma

    Integrated geological interpretation of aerial photographs and Landsat images revealed that the gold mineralisation at Kyauk Pahto took place in a narrow zone of tension fractures within part of a

    Jan 1, 1987

  • AUSIMM
    Fluid-Mineral Relations in the Comstock Lode, Storey, Washoe, and Lyon Counties, Nevada, U.S.A.

    The Comstock Lode, a world-class precious metal vein district near Virginia City in western Nevada, U.S.A. (Fig. 1), produced 8.3 million ounces (0.28 X 106 kg) of gold and 193 million ounces (6.5

    Jan 1, 1987

  • AUSIMM
    High Sulfidation Alteration at the Island Copper Porphyry Copper Deposit, Vancouver Island, Canada (8470714d-c97b-4a7f-bf25-8340c867ad44)

    By Simmons SF, Fleming J

    Alteration and mineralisation at the Island Copper deposit is related to the intrusion of Early Jurassic quartz feldspar porphyry dykes into surrounding comagmatic Bonanza volcanic rocks. The pyrophy

    Jan 1, 1995

  • AUSIMM
    Ballymoney Lignite Deposit

    This paper presents an overview of the strategy adopted to bring the Ballymoney opencut lignite deposit to an advanced stage of mine design and confidence. Certain aspects of the project differentia

    Jan 1, 1989

  • AUSIMM
    Energy Reduction at Sulphide Corporation - Two Case Studies

    By Green GR

    Description of two methods developed at Sulphide's Cockle Creek Plant as part of a site energy reduction program. The two case studies are:

    Jan 1, 1985

  • AUSIMM
    Prefeasibility Studies and the Problems in their Auditing

    There is considerable variability in the level of detail incorporated in prefeasibility studies relating to mining developments. Hence, when undertaking a review or audit, it is critical to attempt to

    Jan 1, 1990

  • AUSIMM
    Interpreting the Story of the Mining Landscape - Using Geotourism for Sustainable Community Development

    Landscape interpretation, geology and mining history are being successfully used to explore options for sustainable community tourism product development. Recent work by the author in Europe and Austr

    Jan 1, 2009

  • AUSIMM
    The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant

    By Smith M, Milton T, Pitt G

    High levels of contamination (non magnetics) were present in the magnetite medium of the D.M. cyclone circuit. Attempts were made to minimise the amount of undersize (-lmm) material in the D.M. cyc

    Jan 1, 1987

  • AUSIMM
    Effect of Regrinding Conditions on the Flotation of Chalcopyrite and its Separation from Pyrite in the CleaneráStage

    By Y Peng, D J. Bradshaw, X Chen

    At NewcrestÆs Telfer gold mine, a strategy of regrinding pyrite rougher flotation concentrates has been proposed to increase gold recovery and reduce cyanide consumption in the CIL circuit. The regrin

    Oct 29, 2012

  • AUSIMM
    The Archaen of the Pilbara Block

    The geology and mineral deposits of the West Pilbara Goldfield are described and comparison is made with the Pilbara Goldfield,, In the West Pilbai'a Goldfield two adjacent environments are re

    Jan 1, 1964

  • AUSIMM
    A Practical Trial to Increase the Coal Recovery in Highwall Auger Mining in Australia

    By T Ueda an, T Sasaoka, A Yabuki, H Shimada

    The basic concept of auger mining is to extract coal beyond the economic limits of surface mining technology by drilling holes of an appropriate diameter size into the exposed seam of the highwall as

    Jan 1, 2003

  • AUSIMM
    Coal Geology - Where to From Here?

    By Hanna P

    Coal geologists are under pressure to minimise exploration expenditure, maximise interpretation confidence and produce the results often too soon. This pressure continues to increase as companies are

    Jan 1, 1998