The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 7
- File Size:
- 704 KB
- Publication Date:
- Jan 1, 1987
Abstract
High levels of contamination (non magnetics) were present in the magnetite medium of the D.M. cyclone circuit. Attempts were made to minimise the amount of undersize (-lmm) material in the D.M. cyclone feed by improving initial desliming and examining those factors that contributed to any overall reduction in desliming efficiency. Circuit density control was improved and a system of continuous contamination monitoring implemented. A brief description is included of the major alterations to circuit control philosophy. The significant improvement in overall D.M. cyclone circuit performance is outlined.
Citation
APA:
(1987) The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation PlantMLA: The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant. The Australasian Institute of Mining and Metallurgy, 1987.