The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant

The Australasian Institute of Mining and Metallurgy
Milton T Pitt G Smith M
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
7
File Size:
704 KB
Publication Date:
Jan 1, 1987

Abstract

High levels of contamination (non magnetics) were present in the magnetite medium of the D.M. cyclone circuit. Attempts were made to minimise the amount of undersize (-lmm) material in the D.M. cyclone feed by improving initial desliming and examining those factors that contributed to any overall reduction in desliming efficiency. Circuit density control was improved and a system of continuous contamination monitoring implemented. A brief description is included of the major alterations to circuit control philosophy. The significant improvement in overall D.M. cyclone circuit performance is outlined.
Citation

APA: Milton T Pitt G Smith M  (1987)  The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant

MLA: Milton T Pitt G Smith M The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant. The Australasian Institute of Mining and Metallurgy, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account