Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, PhilippinesBy C Harrison, A Bowskill
The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to
Sep 17, 2014
-
Introducing and Sustaining a Continuous Improvement Program in Mines and SmeltersBy M Costa, L Polizzi
Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the
Sep 1, 2014
-
Driving Haulage Productivity Improvements through Industry–Academia CollaborationBy R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch
"The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e
Nov 15, 2016
-
Control and Distribution of Face Air by Water Sprays on Mining MachinesBy Muldoon T
Water sprays on mining machines are generally put there to reduce dust; however, research by the Bureau of Mines and others has shown that considerable airflows may also be generated by these spray
Jan 1, 1983
-
The Soft Ground Bored Tunnel Under Sydney AirportThe New Southern Railway (NSR) involves the excavation of approximately 10 km of single bore tunnel from Tempe Reserve, Tempe, to Prince Alfred Park (PAP). PAP is located just south of Central Railway
Jan 1, 1999
-
Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, AustraliaBy T J. Sullivan, H Pinkster, G Swarbrick
From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o
Nov 5, 2014
-
Considerations for the design and support of underground portalsBy M P. Sandy, R M. Stephenson
Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu
Mar 15, 2021
-
Geochemical Assessment of Mine Waste Materials and Prediction of Final Pit Lake Water Quality at a Proposed Gold Mine in MongoliaBy I Swane, R Rait, A Robertson
Geochemical assessment of mine waste materials prior to commencement of a proposed mining operation is a fundamental component of mine feasibility studies and the regulatory approvals process. Static
Sep 29, 2013
-
Increased drilling accuracy leads to significant improvement in ore recovery and dilutionBy R Stimpson, B Johnson, B Hesse
During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto
Mar 15, 2021
-
Friction rock stabiliser QAQC and a process to investigate high pull test failure ratesBy R Varden
Friction rock stabilisers, commonly termed ‘Split Sets’, friction rock bolts, or continuous friction coupled bolts are the most widely used rock bolt in the Australian underground metalliferous indust
Mar 29, 2023
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut ProjectBy D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USABy S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick
Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir
Nov 4, 2015
-
State-of-the-art of electroslag refining and challenges in the control of ingot cleannessBy G Stovpchenko, G Jianjun, L Medovar
Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti
Jun 19, 2024
-
Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, LaosBy B Saunders, J Carpenter
PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug
Sep 20, 2017
-
Review of Ventilation Optimisation Strategies During Longwall MovesBy H W. Wu
Occupational exposure limits for diesel particular matter (DPM) are progressively being adopted in a number of countries. Many of these follow the lead of the US Mine Safety and Health Administration
Aug 31, 2015
-
Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri MineBy M Brady, O Salisbury, C Claassen, B Beamish, H Baxter
Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action resp
Aug 31, 2015
-
Application of Heterogeneity Testing to Coarse Gold OresBy S C. Dominy, R C. A Minnitt
Determination of the sampling constant and liberation diameter are of importance when applying the Fundamental Sampling Error (FSE) equation to optimise sampling protocols. The method for the direct d
Aug 21, 2012
-
High-Density Sludge Process for Treating Metal Bearing Acid and Metalliferous Drainage WastewatersBy A Dal-Corobbo
Traditional acid and metalliferous drainage (AMD) wastewater treatment focuses on the iron co-precipitation/adsorption process as this is a very effective method of reducing heavy metals, including co
Nov 26, 2013
-
PanAust Limited’s approach to mine waste and tailings stewardshipBy L P. Trout, D G. Reid
PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem
Jul 23, 2018
-
Screen Media Aperture Size Measurement Using MetsoÆs Screen TrackerBy G van Niekerk, M Wortley
Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.
Sep 26, 2011