Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effect of Pre-oxidation and Filtration on Cyanidation of Contaminated Gold from a Flotation Concentrate (677149c7-49e9-4819-8439-028f9085926e)

    By Sparrow GJ, Woodcock JT

    A sample of pyrrhotite flotation concentrate pulp assaying 15.3 g/t An, which had been prepared from an old tailing dump, was treated to extract the gold. Examination of the concentrate with an SEM sh

    Jan 1, 1990

  • AUSIMM
    Island Arc Geodynamics: A Model with Implications for Seismic and Magmatic Processes

    By Demin SS

    Slow seismotectonic movements along the in-clined deep fault zone under the compressional horizontal stresses are supposed to be the prin-cipal mechanism controlling the structure and processes in the

    Jan 1, 1990

  • AUSIMM
    Optimisation of Blasting in a Large Open Pit Mine

    By Miles M. J, Sandy D. A

    It has long been known that drilling and blasting operations have a direct influence over productivity and costs of subsequent operations. If mine management is to effectively optimise blasting oper

    Jan 1, 1990

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Lead-zinc-silver Ore Concentration Practice at the Hilton Concentrator, Mount Isa Mines Limited, Mount Isa, Qld

    Trial ore production began at the Hilton Mine in 1987 with ore being trucked into Mount Isa for treatment at the Lead/zinc Concentrator. The expansion of output from the Hilton mine required additiona

    Jan 1, 1993

  • AUSIMM
    On-Stream and Bulk Analysis of Iron Ores

    In response to requests from the iron ore mining industry, the Commonwealth Scientific and Industrial Research Organisation (CSIRO) Division of Mineral Physics has developed a number of bulk analysis

    Jan 1, 1985

  • AUSIMM
    A practical simulation of an industrial rougher flotation circuit

    By Osborn G

    The bulk flotation behaviour of an industrial rougher bank has been determined with a view to characterising the size iepend ent behaviour of the identifiable nineral groups present. A relatively

    Jan 1, 1986

  • AUSIMM
    Resistivity Surveys for Groundwater at Depot Springs, Near Agnew, Western Australia

    By Omnes G

    Sixty Schlumberger electrical soundings were carried out in the Depot Springs area, near Agnew, Western Australia as part of an investigation into the availability of groundwater for the Agnew nic

    Jan 1, 1975

  • AUSIMM
    Analysis of Haul Truck Tyre Costs in a Multiple Pit Surface coal Mine

    By Cox LT

    A short term tyre study of trucks operating in a multiple pit surface coal mine showed significant potential for cost savings. The tyre study, conducted on-site over a three months period covered a

    Jan 1, 1982

  • AUSIMM
    Economic Investigations on Sub-Level Stoping with Consolidated Rockfill

    By Heidecks C

    Sub-level stoping with consolidated rockfill is the main method for mining steep dipping baryte and fluorite veins in Germany. Drifting is fully mechanised using drill jumbos, LHD units and shotcret

    Jan 1, 1995

  • AUSIMM
    Sulphide Flotation in Cassiterite Concentration Plants

    By Selby DW, Hamill J, Cauley ID, Thomas I, Thornton AJ

    The main objective of sulphide flotation in a cassiterite concentrator is to remove sulphide minerals (pyrite, pyrrhotite and sometimes chalcopyrite) from the ore prior to gravity concentration. T

    Jan 1, 1978

  • AUSIMM
    Underwater Blasting in Landslide Blocked River

    By Dhawan AK

    On 8 July 1993, a landslide of about one million cubic metres of rock blocked the river Satluj near Sanjay Vidyut Pariyojana - Bhaba project and caused flooding into the Bhaba Power House (120 MW) r

    Jan 1, 1995

  • AUSIMM
    Mechanical Sampling Plants

    In 1997, the Australian coal industry through Standards Australia committee MN-001 Coal and Coke recognised the need to produce a Standard giving some instruction on how to inspect and audit mechanica

    Jan 1, 2005

  • AUSIMM
    Responding to Risk by Going with the Top Ranking Performers to Achieve Sustainable Mining in a Global Industry

    The value of Australia's education services exports increased to over $15 billion dollars in 2009, placing education as the third overall export earner behind coal and iron ore; however there are

    Jun 1, 2010

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    Microseismic Monitoring for Gas Outbursts at Leichhardt Colliery

    By Ahmed M, Leung L

    A program of microseismic noise monitor ing for gas outbursts, in conjunction with other mining engineering measurements and observations, is being undertaken at Leichhardt colliery in Queensland.

    Jan 1, 1980

  • AUSIMM
    The Operation of a Mobile Alluvial Plant

    We operate a 50 cubic metre per hour mobile alluvial tin mine on small scattered deposits in the Irvinebank area. Wash is loaded by a Cat. 950 front end loader into the bin of a screening section and

    Jan 1, 1986

  • AUSIMM
    A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196)

    By Restarick C. J & Stewart P S B, Kelsall D. P

    Over a four-hour period of steady plant operation samples were taken at regular intervals from points within the grinding and flotation circuits. Size fractions of each composite sample were analyse

    Jan 1, 1980

  • AUSIMM
    The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging Conditions

    By V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard

    This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil

    Sep 18, 2012

  • AUSIMM
    Heat, Mass and Impulse Transport Analogies for Underground Airways

    By Mousset-Jones P, McPherson M. J

    Underground airways are characterized by irregular shape and uneven surfaces including large-scale natural roughness, fractures, and a super-imposed sand roughness. Swirls in the grooves of the wa

    Jan 1, 1988