Search Documents

  • AUSIMM
    Managing Challenges Faced in the Brownfield Commissioning of an Ultra-Fine Hematite Processing Circuit at ArriumÆs Iron Duke Ore Beneficiation Plant

    By E Selvapandian, R Barr

    Arrium (previously OneSteel) initiated a desktop study into the performance of its hematite ore beneficiation plant in early 2010. The beneficiation plant utilises jig concentrators and spirals to upg

    Aug 12, 2013

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • AIME
    Coal - Are Coal-Mine Employees and Dollars Protected from Fire as Well as Other Industrial Employees and Dollars?

    By R. W. Stahl

    Employees and dollars are necessary to all enterprises and any force, such as fire, which destroys either, can bring very serious consequences, including business failure. Since everyone acknowledg

    Jan 1, 1961

  • AUSIMM
    Using Positron Emission Particle Tracking (PEPT) to Investigate Industrial Systems

    Using Positron Emission Particle Tracking (PEPT) to Investigate Industrial Systems

    Sep 13, 2010

  • NIOSH
    OFR-3(1)-80 The Development Of A Cross-Pit Overburden Handling System - Volume I - Preliminary Design

    By J. Ritchey

    This report describes the engineering feasibility and economic advantages of using a mobile bridge-type cross-pit belt conveyor system in conjunction with a large dragline to excavate and transport sp

    Jan 1, 1976

  • CIM
    Uppers drilling for mechanized cut-and-fill stoping at Brunswick Mining and Smelting No. 12 Mine

    By R. W. Baker

    "The development of uppers drilling at Brunswick Mining is reviewed. This paper describes design criteria for drilling patterns and the research required for selection of a suitable drill jumbo. The s

    Jan 1, 1988

  • NIOSH
    IC 6244 Practical Application and Cost of Proper Rock Dusting

    By G. M. Kintz

    "Methods and costs of rock-dusting bituminous coal mines have been discussed in various publications by the United States Bureau of Mines and others.3 This paper discusses the present methods and cost

    Mar 1, 1930

  • CIM
    Development of an Automated Potentiometric Titrator for the Study of Surface Electric Phenomena

    By A. P. Page, G. E. Alexander, L. L. Sirois, A. A. Winer

    A knowledge of the electrical surface characteristics of minerals is all-important in the choice of treatments to up-grade and beneficiate them. At their solid-liquid contacts, there are transfers of

    Jan 1, 1969

  • SME
    Massive Tires Keep The Industry Rolling

    One of the biggest challenges for the mining industry is, quite literally, how to the keep the equipment rolling. There is a limited amount of companies that manufacture the 4.2-m- (14-ft-) tall, 5,

    Jan 1, 2008

  • NIOSH
    RI 3861 Diamond Drilling of Potash Reserves - Eddy Co., NM

    By Walter R. Storms

    "The New Mexico potash exploration described herein was begun in February- 1944 by the Federal Bureau of Mines with the object of determining the amount of potash ore in the United States Potash Reser

    Apr 1, 1946

  • TMS
    Hydrothermal Mineralization Treatment of Hazardous Oxoanions in Wastewater for Resource Recovery

    By Ryo Sasai, Takeshi Itakura, Haruki Imaizumi, Hideaki Itoh

    "Emission of industrial wastewater containing harmful oxoanions is one of the serious problems on account of its toxicity and the environmental pollution, especially caused by boric, phosphinic, arsen

    Jan 1, 2008

  • SAIMM
    Development Of Innovative Funding Mechanisms For Mining Start-Ups: A South African Case

    By J. Mothomogolo

    Mining projects are capital-intensive and are also characterized by high technical and economic risks. These factors pose challenges to mining entrepreneurs when they seek to raise seed capital for mi

    Jan 1, 2012

  • AUSIMM
    Smelting Practice at Mount Morgan

    By Hennessy F. L

    IntroductionEvolution of the Present SmelterRoastingFiringHearth SlopeDust HandlingFurnace DetailsSmeltingFurnaceFeed DeliveryPulverised Coal FiringWaste Heat BoilersDust HandlingAir PreheaterReverber

    Jan 1, 1952

  • DFI
    Underpinning The Existing No. 1 Subway Line At The World Trade Center

    By Richard Crockford

    The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne

    Jan 1, 2008

  • NIOSH
    Bulletin 184 The Manufacture of Sulphuric Acid in the United States

    By D. E. FOCG, A. E. Wells

    When the United States entered the World War governmental agencies found little definite knowledge available as to the exact capacity of each sulphuric acid plant in the United States to manufacture a

    Jan 1, 1920

  • TMS
    Adsorption and Recovery of Ag(I) from Aqueous Solutions Using Spent Grain

    By Qingzhu Li

    The brewing industry byproduct, spent grain (SG), was evaluated for its ability to adsorb Ag(I) from aqueous solutions. Ag(I) adsorption was dependent on solution pH, contact time, adsorbent dose, ini

    Jan 1, 2009

  • CIM
    Cummins Tier 4 Technology

    By Evelynn Stirling

    Agenda ? Emissions legislation ? Cummins Tier 4 Technology ? Cummins Experience with Technology ? Operation and Maintenance Impact The Emissions Challenge ? The 2014/5 emissions regulations pr

    Aug 1, 2013

  • CIM
    "Operational Readiness" - A Value Proposition

    By J. E. Amadi-Echendu, F. Stober, J. Ndlovu, L. R. Nelson

    The Polokwane Smelter Complex (PSC) relies on a single 68MW high-intensity six-in-line furnace to smelt a planned 650 000 t/a dry concentrate to produce a platinum group metals (PGM)-bearing matte. As

    Jan 1, 2005

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018