Search Documents

  • ISEE
    Optimization of Up Raises from Blind-Hole to Multiple Blasting Events Methodology

    By S. Gajardo, E. Valdés Guerra

    Together with Sociedad Punta del Cobre S.A. (Pucobre) and Orica, we are carrying out a study of alternatives for methodology of excavation in Slot Up Raises from actually built with Blind Hole (BH) to

    Jan 1, 2024

  • IOM3
    Petrography and X-ray computerized tomography applied as an integral part of a rock mechanics investigation of discontinuities

    By R. Sweennen, A. Vervoort, J. Caers

    A case study is presented of the mechanical behaviour of fractures in the Westphalian A and B siliciclastic succession of mud-, silt- and sandstones with intercalating coal layers in the Campine basin

    Jun 19, 1905

  • NIOSH
    OFR-103(4)-77 U.S.B.M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume II - Drill Hole History

    By L. A. Readdy

    Pilot Hole "X" was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine will be drilled. The history of the drilling of Pilot Hole

    Jan 1, 1977

  • NIOSH
    Bulletin 157 Innovations in the Metallurgy of Lead

    By Oliver C. Ralston, Dorsey A. Lyon

    The data reported in this bulletin are largely the result of experiments conducted by the Salt Lake City station of the Bureau of Mines in cooperation with the department of metallurgical research of

    Jan 1, 1918

  • CIM
    The impact on underground ventilation of the reduction of diesel emissions toxicity by water-in-oil fuel emulsification

    By J. P. Mogan, E. D. Dainty, A. Lawson

    "The toxicity reduction of emissions from two diesel engines by the emulsification of water into fuel oil was investigated to determine the applicability of such systems to underground mining machiner

    Jan 1, 1981

  • SME
    Hydrothermal Silicification and Alteration of Breccias from Lucky Strike and Menez Gwen hydrothermal fields (Mid-Atlantic Ridge, Azores)

    By I. A. Costa, Y. Fouquet, F. Barriga

    "Lucky Strike and Menez Gwen are two hydrothermally active sites located along the border of the Azorean plateau, southwest of the Azores islands where the alteration processes affecting basaltic rock

    Sep 1, 2014

  • DFI
    Deep Soil Mixing for Contaminated Soil Remediation at a Superfund Site

    By Larry Stearns, Lori Tiefenthaler

    Remediation of contaminated soil represents a significant market for application of Deep Soil Mixing (DSM). Eighty-one percent of U.S. Environmental Protection Agency (EPA) Superfund Program’s site re

    Jan 1, 2018

  • AIME
    Index A – C (7f683475-4cf6-4287-8432-311b1f19dfb3)

    [AARONSON, E.: Discussion on Recent Developments in Fractionation as Applied to Tube Still Distillation, G26, 418 Abbe. See Microscope. Abbe apertometer, 95, 16 ABBOTT, W. L.: A.S.M.E. president,

    Jan 1, 1936

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • ABM
    High Impact Integrated Melt Shop Management Systems - Effective Implementation With Sustained Success

    By John Ross Middleton

    Based upon 30 years+ experience in the Development, Implementation and Ongoing Support of Computer based Melt Shop Management Systems in about 40 plants in the UK, Europe and the USA, consideration of

    Jul 29, 2018

  • DFI
    Instrumented Load Tests On Closed-And Open-Ended Piles

    By Junhwan Lee

    Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p

    Jan 1, 2003

  • AUSIMM
    Maximising the Operational Benefit of Capital Investment Via Computer Simulation

    In the minerals industry allocating capital for setting up a new project or for upgrading an existing facility usually requires that a compromise be found between the initial cost of equipment, its

    Jan 1, 1990

  • IOM3
    Risk assessment applied to coal tonnage estimation in the United Kingdom

    By M. K. G. Whateley, W. Hatton

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 20pp., 31 refs. Estimates

    Aug 1, 1995

  • SME
    Underground Mine Stream Crossing Assessment: A Multidisciplinary Approach

    Underground mine designs typically try to avoid extraction beneath streams and rivers of any significant size, especially when the overburden rock thickness between the stream bed and the mine is thin

    Jul 28, 2020

  • SME
    The human factors in the success of mineral processing projects

    By M. P. Smith, C. Hughes-Narborough, Y. T. Man

    "Money and reputations can be lost in bad projects. Causes of bad mineral processing projects include poor contract definition and purchase of equipment without adequate test work. However, the root c

    Aug 1, 2016

  • CIM
    Special Design Considerations for Pressure Hydrometallurgy Pilot Plants

    Pilot plants for pressure hydrometallurgy represent special design and project execution challenges unique to the industry and to the pilot- and demonstration-scale. Pilot plant projects have differen

    Jan 1, 2004

  • SME-ICGCM
    A Method For Assessing The Potential Of Mine Subsidence At Abandoned Mine Sites Through The Assistance Of Finite Element Modeling

    By Richard E. Bischke

    Computer assisted finite element model analysis, originally developed to study stress distributions in aircraft, has been modified into a versatile mining program, that can be used to assist the engi

    Jan 1, 1984

  • NIOSH
    RI 5336 Geologic Factors Related To Block Caving At San Manuel Copper Mine, Pinal County, Ariz. - Progress Report, April 1954-March 1956 ? Summary And Introduction

    By E. D. Wilson

    A study of factors related to subsidence was specified in a project proposal entitled "Structural Analysis of Block-Caving Operation, San Manuel Copper Mine, Pinal County, Ariz.," approved by the Bure

    Jan 1, 1957

  • AUSIMM
    Developing and maintaining mine site ventilation capability and new trends in mine ventilation career paths

    By D J. Brake

    The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5

    Oct 12, 2022

  • AUSIMM
    Lead and Zinc Smelting Charges

    By Grey CA

    Any economic evaluation of a lead-zinc mining project requires the estimation of net revenue per tonne of concentrate at the "mine gate". The value at the mine gate equals the Net Smelter Return min

    Jan 1, 1990