Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A study of total dynamic analysis method for deepseabed integrated mining systemBy Hyung-woo Kim, Sup Hong, Sung-Soo Kim, Chang-Ho Lee
A deep-seabed integrated mining system, which consists of four subsystems such as riser pipe, buffer, flexible riser, and tracked vehicles, is presented in Figure 1. In order to collect more manganese
Sep 1, 2014
-
Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in TunnelingBy Remo Grandori
The Umiray Angat 13,2 km long tunnel in Philippines have been bored through extremely variable and difficult ground conditions including a number of special events. In particular the following adve
Jan 1, 2001
-
What it’s worth : A review of 1986 mineral royalty informationBy H. Lyn Bourne
This is the fifth annual tabulation of mineral royalty information. This tabulation, like the previous editions, includes all of the earlier data. There are also 60 new entries. In addition to royalty
Jan 7, 1987
-
Development of Australia’s first major diamond discovery outlinedBy Richard D. Lang
Introduction Argyle is located in the Kimberley region in northwest Australia (Fig. 1). It is a significant diamond discovery by world standards and is the first major diamond find in Australia. T
Jan 1, 1986
-
Designing Wetland Treatments Systems For Long Term Treatment Of Mine Drainage - An Impossible Dream?By Paul Eger
The use of wetlands to treat mine drainage has become increasingly common, particularly as more information is available on their operation and construction. However, the lifetime of each system is s
Jan 1, 2005
-
Stability Prediction And Performance Of Highwall Steepening In Weak RockBy D. R. Brox, J. Levell
The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit
Jan 1, 2001
-
Jet Grout Ground Modifications for the Brightwater Conveyance SystemBy Richard Hanke
Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,
Jan 1, 2008
-
Blasor – A Generalized Strategic Mine Planning Optimization ToolBy B. Law, M. Menabde, B. Baird
Blasor is a new mine planning tool which is being used in the long and medium-term optimization of multi-open-pit operations throughout BHP Billiton’s Base Metals and bulk commodities portfolio. It i
Jan 1, 2007
-
La Ciénega – A New Gold Mine in MexicoBy F. Grajales Muñoz
The Ciénega project, now under construction by Peñoles group, is located in the mountains of northwest Durango, Mexico. The gold and silver deposits are found in a 4-km (2.5mile) long system of veins.
Jan 1, 1994
-
Mining Applications Of Small Disc CuttersBy J. E. Friant
Until 1956, drill and blast was the only way to excavate rock. In that year, a tunneling machine using disc type cutters economically bored a small Toronto tunnel. Its amazing 105 ft/day set a new w
Jan 1, 2002
-
A Study on the Impact of In-Seam Rock Partings on Coal Pillar Strength Based on Field Instrumentation and Numerical Modeling at the Maple Eagle Mine - SME Annual Meeting 2024By Morgan M. Sears, Mark Morris, Joseph Bright
In an effort to advance the science underlying modern coal pillar stability analysis, researchers at the National Institute for Occupational Safety and Health are currently involved in research aimed
Feb 1, 2024
-
The Use Of Sensor Derived Data In Real Time Mine Optimization: A Preliminary Overview And Assessment Of Techno-Economic SignificanceBy M. Buxton
Sensor derived data can add value across the mining operating chain ranging from resource definition, extraction, pre ? concentration, mineral process monitoring and assessment of product quality. M
Feb 27, 2013
-
Solving Mine Drainage Water Issues with Peat-Based Sorption MediaBy P. Eger, D. Green
"The Soudan Mine was Minnesota’s first iron mine, operating from 1882 to 1962. The mine was donated to the State of Minnesota in 1963 and became a state park in 1965. The mine discharge contains eleva
Jan 1, 2015
-
Photogrammetry Method for Fast and Accurate Measurement of Strata Movements and Deformations for Scale Physical Mining Simulations "Mining, Metallurgy & Exploration (2020)"By Yi Luo, Jian Yang, YUJIA LIAN
Scale physical models, constructed according to the principle of similarity theory, have been widely used to simulate the mining disturbances to surrounding strata and to evaluate the effectiveness of
Aug 11, 2020
-
Excavation And Support Of A Water Tunnel Through The Hayward Fault ZoneBy Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo
The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p
Jan 1, 2007
-
Use Of Cognitive Task Analysis To Inform Future Research And Identify Solutions For Haul Truck Safety - SME Annual Meeting 2022By W. Missildine, J. K. Hrica, I. Benbourenane, T. J. Orr, J. L. Bellanca
Each year, haul truck accidents account for a large portion of mining injuries and fatalities. To better understand why these accidents continue to occur, researchers from the National Institute for O
Mar 2, 2022
-
Reclamation and closure of the AA heap leach pad at Barrick's Goldstrike mineBy K. Burke, K. L. Myers, R. Espell
Barrick's Goldstrike AA heap leach pad is an HDPE-lined facility that was used for gold recovery from low-grade ores using conventional cyanide heap-leach technology. The pad was operated from 19
Jan 1, 2002
-
The Mine Central Control Room: From Concept To RealityBy K. Short
Today?s modern mining operations have literally dozens of applications and systems generating data whose information very often, are not crossed or centralized for operational decisions. In remote lo
Feb 27, 2013
-
Geologists Add Value at Newmont’s Nevada Mines – Part OneBy Wayne Trudel, Lloyd McEvers, Lori Clarke, Eric Saderholm, Charles Lynn Bolin, Leroy Schutz
Newmont mine geologists in Nevada are most proficient when applying technical expertise with multi-departmental teams in three main settings. The first is value creation through near-mine discovery, d
Jan 1, 2004
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997