The business benefits of an advanced mineral sands control application
By R. Hope, C. van Heerden
In any process or organization inefficiencies are costly. In times of abundance this reality often does not receive much attention. During such times the focus is rather on increasing capacity to incr
Jan 1, 2003
-
Techno-Economic Impact Of Optimized Lowgrade Thermal Coal Export Production Through Beneficiation Modelling
By J. P. Bergh
The advent of low-quality export coal demand has brought a new range of possibilities to the South African coal industry. Products that traditionally were only of value to the domestic or combustion i
Nov 1, 2013
-
The Proposed 2016 SAMREC Code
By Steven Rupprecht
"The South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves (the SAMREC Code or the Code) sets out minimum standards, recommendations and guidelines for pu
Jan 1, 2015
-
Tough choices facing the South African mining industry
By W. van Antwerpen, J. Guzek, A. Lane
Strategy is about making choices. Mining companies choose to do certain things and not to do other things. Mining is a long-term business, and the choices made typically have large investments attache
Jan 1, 2015
-
Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis (80e0c6d7-bb8a-4f50-8633-f573ee75745a)
By D. Strachan
Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i
Jan 1, 2009
-
The Beneficial Effects Of Feeding Dry Copper Concentrate To Smelting Furnaces And Development Of The Dryers
By S. L. Chen
Keywords: copper, concentrate drying, steam dryer, dryers By placing additional demands on energy and gas flow, the moisture content of a copper concentrate has an adverse effect on the smelting p
Jan 1, 2006
-
Anglo Platinum Extra Low Profile (XLP) Mechanised Equipment Implementation ? An Update - Synopsis
By GA Harrison
The introduction of Extra Low Profile (XLP) mechanised equipment within Anglo Platinum is aligned with the overall New Mining Technologies strategy to focus on continuing modernization of our mining
Jan 1, 2008
-
Finite Element Modelling Of Electric Currents In Ac Submerged Arc Furnaces
By I. Mc Dougall
Finite element models were generated of two submerged arc furnaces of different geometries. A 48MW circular furnace and a 68MW 6-in-line rectangular furnace were studied. The electrodes, raw material,
Jan 1, 2007
-
Slope Management At Navachab Gold Mine, Namibia
By Frik Badenhorst, René Roux, Peter Terbrugge
This paper presents a case study where economics dictated an aggressive slope angle and where an appropriate slope management programme allowed successful completion of mining to 190m below surface.
Jan 1, 2006
-
New Generation Contact Shoes Influence On The Process - 1. Introduction
By Christian Roche
Our study is focused on the sub-assembly con-tact shoes, pressure rings and pressure bellows. We were keen to mainly study [ ] 1.The contact shoe design 2.The most efficient pressure to ensure an
Jan 1, 2007
-
The Development And Application Of A HCFeMn Furnace Simulation Model For Assmang Ltd
By B. R. Broekman, K. J. R. Ford
Over the last decade significant development and use has been made of a simulation model that describes the HCFeMn smelting operations in Assmang Ltd. This spreadsheet based, semi-empirical, predictiv
Jan 1, 2004
-
Added Value Long Steel Products Produced At MSSA Newcastle Works
By A. J. Potgieter, C. Hill, A. Humpel, D. S. Magudulela, V. Scholtz, A. Coetzee
Keywords: Pyrometallurgy, long steel products, coke, sinter, blast furnace, steel plant Located in Northern KwaZulu Natal, Mittal Steel South Africa Newcastle works produces roughly 1.8 million to
Jan 1, 2006
-
Universities and Decision-Making: Programme and Qualification Mix ? Four Learning Pathways
By W. P. Nel
The introduction of the Higher Education Qualifications Framework (HEQF) and the updated Higher Education Qualifications Sub-Framework (HEQSF) has caused many South African university departments to r
Jan 1, 2014
-
Integrated Optimization Of Underground Mine Design And Scheduling
By J. Little
It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, comput
Oct 1, 2013
-
Steel Cleanliness And Hydrogen In Liquid Steel
By R. Dekkers, J. Plessers
The feasibility of using hydrogen to obtain clean steels is investigated. High hydrogen contents are generally considered as detrimental due to the risk of flakes, bubbles and breakouts during casting
Jan 1, 2004
-
A Conceptual Study Into Optimizing The Delivery Of Trackbound Twin Ends Through Trackless Mechanized Development
By D. Nardini
The need to move towards faster and safer mine development is a key priority in mining houses globally. In addition to this, South Africa faces an array of challenges introduced by labour-intensive op
Jan 1, 2012
-
An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? Synopsis
By T. J. Kolokoto
This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground
Jan 1, 2013
-
Critical Aspects In The Definition Of The Optimum Configuration Of A Sulphur Burning Plant
By M. Verri
[ ]
Jan 1, 2009
-
Introducing new Council members (a79be80f-11af-4a3b-bfcc-b0e6ed1e62dd)
Professor H.R. Philips was born in South Wales. After graduating with a B.Sc. degree in electrical engineering from the University of Bristol, he joined the National Coal Board's management train
Jan 1, 1989
-
Ferro Silicon Operation At IMFA ? A Critical Analysis
By Dhananjaya Senapati, E. V. S. Uma Maheswar, C. R. Ray
Carbothermic process of Ferro Silicon production is primarily a slag-less process. However, slag formation is observed in the regular operation as experienced by almost all the Ferro Silicon Producers
Jan 1, 2007