Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Success in Advanced Blasting on the Basis of Sonicity -or- What a Blaster Should Know about Wave Dynamics in Rock!
By H P. Rossmanith
This contribution addresses the advanced blasting technology which is based on wave propagation theory and fracture mechanics. The new concept of sonicity and the principle of maximizing sonicity in b
Jan 1, 2010
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground
By K. Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Jan 1, 2024
-
Maximizing Mining Recovery Through Advanced Blasting Techniques and Blast Movement Management
By Aris Tambunan, Nella Lubis, Nurafrianti Saala, Komang Widhiayanto, Herry Saputra, Rudolf Sitorus
Maximizing mining recovery rates and minimizing ore loss are pivotal objectives for economic efficiency and operational effectiveness. This study explores methods to address these imperatives by enhan
Jan 21, 2025
-
Oil & Gas Well Perforating the Other Explosive Industry
By Richard Arsenault
The production of oil & gas from wells requires method of flow from the producing formation into the well bore. Once the well is drilled it will have casing pipe installed to protect the integrity of
Jan 1, 2007
-
Challenges and Lessons Learned from the Kentucky Lock Project
By K. Best, D. Conn
The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic
Jan 1, 2024
-
The Effect of Charge Mass and Delay Timing on Airblast Overpressure
By Adrian Moore, Dominic Hooton, Alan Richards
Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m
Jan 21, 2025
-
Automation of Rock Fragmentation Analysis
By Hairong Zeng, Matthew Baumann, Shahram Tafazoli, Edmond Chow
Measurement of rock fragmentation has evolved from a completely subjective and manual process to a statistically objective and semi-automated process. However, ultimately, the vision is to achieve a s
Jan 1, 2012
-
Blast Optimization and Vibration Control at a Multi-Seam Coal Mine, Brazil
By Enrique Munaretti, Vitor Rosenhaim, Jair Carlos Koppe, Joao Francisco Feijo
The B3 mine is a multiple coal seam strip mining in operation in Rio Grande do Sul, the southernmost state in Brazil. A traditional truck & excavator operation is used to remove the overburden and sel
Jan 1, 2012
-
The Exploding Bridgewire Detonator - A Safer Explosive Initiation Method
By H J. MacDonald
An Exploding Bridgewire Detonator (EBW) is an explosive initiator which contains only secondary explosives such as PETN and RDX. It is safer than the normal blasting cap because it requires both high
Jan 1, 1981
-
New Methodology for Calculating Dynamic Pressure
By Jorge Cárdenas, José Luis Hurtado
The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar
Jan 21, 2025
-
Application of Differential Blasting for Value Chain Optimisation
By Stephen Mansfield, Saran Sankar
The Sentinel open pit copper mine, operated by First Quantum Minerals Ltd, is located in the North West province of Zambia. The Sentinel orebody is a sediment-hosted, structurally modified deposit in
Jan 21, 2025
-
A Work Area Monitor (WAM) to protect Blast Crews from Rock Falls
By David Scutt, David Noon
Blast crews are exposed to a number of major hazards including explosives and chemicals, ground conditions, machinery, unique work environments and specific blasting hazards such as fly rock and misfi
Jan 1, 2011
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines
By Reinhold Daykin, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove
Feb 1, 2020
-
Application of the Selective Loading to the Rock Mass Characterized through Drill Monitoring for Autonomous and Manual Drilling Mode to Optimize Blasting Results in Open Pit Operations
By Jorge Blázquez, Pablo Ravanal, Paulo Couceiro, Juan Navarro
Blasting performance is influenced by rock mass properties and blast design parameters. From them, the rock is the only variable that cannot be modified, but it can be measured, so that, blast design
Feb 6, 2023
-
Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard Construction
By Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe
Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the
Jan 1, 2013
-
A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects
By Robert Lee, Pertti Paavola
Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in
Jan 1, 2004
-
Thiokol's Accublast Detonator: Precision Benefits the Industry can Justify
By W B. Gregg
"A review, update, and expansion of Thiokol’s presentation at BAl’s Fiih High Tech Seminar titled ‘ADetonator - An Era of Precision in All-Electronic Detonators” is provided herein (and should be cons
Jan 1, 1995
-
Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions
By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill
This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an
Jan 1, 2017
-
Use of Electronic Initiation System in Urban Shaft Sinking Project
By Richard Turnbull, James Purssey
"The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be
Jan 1, 2017
-
Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill &Blast Engineering Focused Projects
By Manuel Calderón
Chile is responsible for 30% of the global copper production; the world ́s largest. However, significant challenges are faced in this industry; declining grades (1.13% in 2002 to 0.61% in 2015), high