Oil & Gas Well Perforating the Other Explosive Industry

International Society of Explosives Engineers
Richard Arsenault
Organization:
International Society of Explosives Engineers
Pages:
9
File Size:
260 KB
Publication Date:
Jan 1, 2007

Abstract

The production of oil & gas from wells requires method of flow from the producing formation into the well bore. Once the well is drilled it will have casing pipe installed to protect the integrity of the well formations and means of delivery to the surface. Once casing pipe is installed it will be cemented in by pumping cement through the annulus of the casing pipe down to the bottom of the well and allowed to flow outside the casing pipe up into the formation.
Citation

APA: Richard Arsenault  (2007)  Oil & Gas Well Perforating the Other Explosive Industry

MLA: Richard Arsenault Oil & Gas Well Perforating the Other Explosive Industry. International Society of Explosives Engineers, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account