Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Future for Ilmenite Beneficiation Technologies

    By R K. A Taylor

    The growth in production of beneficiated ilmenite products has been one of the most significant trends in the titanium feedstock industry over the past 30 years. In this period, the production of tita

    Jan 1, 2001

  • AUSIMM
    Generating Synthetic Data for Simulation Modelling in Iron Ore

    By J E. Everett, K Jupp, T J. Howard

    Simulation modelling is a practice commonly used in the mining industry to evaluate alternative process designs. Such modelling is typically undertaken as an optimisation study to increase the efficie

    Sep 29, 2013

  • AUSIMM
    Bed Load Losses from Experimental Plots on a Rehabilitated Uranium Mine in Northern Australia

    By W D. Erskine, M J. Saynor

    Ranger Uranium Mine, surrounded by Kakadu National Park is located in the Alligator Rivers Region (ARR) in the wet-dry monsoonal tropics, 250 km east of Darwin, Northern Territory. A trial landform (T

    Jun 28, 2016

  • AUSIMM
    A Technology of Precious Metals Recovery from Gold-Bismuth Ores

    By V P. Beskrovnaya

    Tests for the development of a metals recovery technology from samples of a Russian gold-bismuth deposit were carried out. Gold, silver and bismuth assay reported 5.6 g/t, 3.0 g/t and 0.08 per cent, r

    Jan 1, 2007

  • AUSIMM
    Modern Personal Computer Tools for Mining and the Environment

    This paper deals with innovative techniques that have enabled personal computers to be used on the mine site to define, develop and manage an ore body resource, while being aware of the consequences

    Jan 1, 1996

  • AUSIMM
    Using Process Safety Management to Manage Risk in Mineral and Metals Facilities

    This paper explores the use of a Process Safety Management (PSM) system to manage risk in the mineral processing and metallurgical refining industries. Important elements of a PSM system are described

    Jan 1, 2003

  • AUSIMM
    Underground rock bolt detection

    By B Liu, W J. Zhang, S Saydam, B Li

    Rock bolts are commonly used to reinforce ground in underground mining and civil tunnel environments. Rock bolts serve two main functions: i) they suspend large, loose blocks of ground, and ii) provid

    Nov 29, 2022

  • AUSIMM
    Implementation of Flash Flotation in the Ok Tedi Grinding Circuit

    By Erepan P. C

    Flash flotation technology was introduced by Outokumpu in 1985. Considerable success was achieved in other plants with similar operations to OTML. Conclusions from site visits and amenability tests

    Jan 1, 1997

  • AUSIMM
    A Guide to Selecting the Optimal Method of Resource Estimation for Multivariate Iron Ore Deposits

    By H Arvidson, J Vann

    When only wide-spaced drilling is available, for example at concept, prefeasibility and feasibility stages, properly implemented linear estimation (including ordinary kriging) predicts grade tonnage r

    Jan 1, 2007

  • AUSIMM
    Uranium Mining Operations at Ranger Northern Territory, Australia

    By Savory P. J

    Uranium mining operations commenced at Ranger mine site, Jabiru NT Australia in May 1980. The Ranger orebodies, totalling approximately 110 000 tonnes contained U305 had been indicated by airborne rad

    Jan 1, 1993

  • AUSIMM
    Inferred Mineral Resources and Gold Veins - Discussion and Case Studies

    Classification within the Inferred Resource category is based on geological judgement and the balance of extrapolation versus interpolation that the Competent Person is prepared to accept. These resou

    Jan 1, 2006

  • AUSIMM
    Benefits Related to Applications of a Mass Blast in Open Cut Mining

    By C Muñoz, N Ortega, J Vergara, D Avilés

    Mass blasts have been the subject of extensive studies because of their potential benefits in mining operations. However, it has not been possible to advance due to the paradigm that states that the b

    Aug 24, 2015

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • AUSIMM
    A Second Derwent Crossing for Hobart

    Proposals for engineering works in the River Dement in recent years have been made in the context of very little geological informat- ion. Breakage of the Tasman Bridge, forced a complete re-apprai

    Jan 1, 1977

  • AUSIMM
    Mathematical Modelling of the Convergence and Vertical Stress Patterns Around a Longwall Panel in New South Wales

    By Pattinaja MA

    Mathematical modelling was carried out to determine the probable convergence and vertical stress patterns around a retreating longwall panel in an underground coal mine in New South Wales. An &apo

    Jan 1, 1986

  • AUSIMM
    Orebodies in the Mt. Charlotte-Hannan's North Area, Kalgoorlie

    Orebodies in the Mt. Charlotte-Hannan's North area N. and E. of the town of Kalgoorlie provide a marked contrast to the pyritetelluride lodes of the Golden Mile, although both groups of orebodies

    Jan 1, 1965

  • AUSIMM
    Analysis of Haul Truck Tyre Costs in a Multiple Pit Surface coal Mine

    By Cox LT

    A short term tyre study of trucks operating in a multiple pit surface coal mine showed significant potential for cost savings. The tyre study, conducted on-site over a three months period covered a

    Jan 1, 1982

  • AUSIMM
    Disposal of Run-Off Water by Land Application at Ranger Uranium Mine, Northern Territory: Geochemical and Radiological Considerations

    By Watters R

    Modem open cut and underground mining in the tropics inevitably expose partially weathered and unweathered rocks to oxygen and water, leading to weathering and the release of solutes and often acidi

    Jan 1, 1994

  • AUSIMM
    It’s all about People - Abstract

    By K D. Tuckwell

    The Treasurer, the Hon Wayne Swan, has nominated ‘maximising our advantages’ from ‘Mining Boom Mark II’ as the focus of the 2011/2012 Australian Budget. Australia therefore requires a bolder and bette

    Nov 22, 2011

  • AUSIMM
    An Automated Analyser for Mine Geological Sample - Operational Performance

    By Ryan A, Dennis R, Dekker D, Ellis W, Sowerby B

    An automated facility for non-destructive elemental analysis of mine samples has been developed and tested at Mount Isa in association with the CSIRO. The analysis is based on the prompt and delayed m

    Jan 1, 1993