Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, ZimbabweBy Peter Makuvise, Alain M. Bantshi
"The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w
Jan 1, 2017
-
Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)By D. X. Tang, G. Wilson, S. S. Peng
Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o
Jan 1, 2006
-
Electricity û Demand and Supply Conservation and the EnvironmentConservation and environmental issues are raising their profile with respect to both demand restraint and electricity supply options. In New Zealand, conservation pressures and energy efficiency need
Jan 1, 1990
-
Main fan energy managementSouth Africa?s primary electricity supplier, Eskom, provides incentives to reduce power demand during critical times by granting capital through a Demand Side Management programme. DSM encourages the
Jan 1, 2009
-
Numerical modelling for underground excavation designBy M. W. Grabinsky, M. S. Diederichs, E. Hoek
Provided that they are used correctly, numerical models can be of considerable assistance to mining engineers in designing underground excavations. Guidance is given to the engineer or geologist who i
Jan 1, 1991
-
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal MinesBy A. Wahab Khair
Coal mining has evolved into extensive use of continuous mining machines for development and production. This has resulted in an increase in dependence on the versatile continuous miners. The present-
Jan 1, 2008
-
Part VIII - Communications - Alumina Transformations in A!-AI,O, Alloys (SAP) Below the Matrix Melting PointBy G. Beghi, G. Piatti
THE authors examined the problem of the gradual transformation of Al2O3 from the transition phases normally encountered in SAP (r -x-n)1-3 to the stable a phase. This phenomenon is well-known at tempe
Jan 1, 1967
-
Borehole Geophone Method for Estimating Tunnel Blast Vibration PropagationBy Kyle Ott, Bernard Daly, Syed Haq, Douglas Anderson, Parsons Brinckerhoff
Drill and blast was determined to be the most cost-effective means of excavating the Raw Water Tunnel (RWT) for the Croton Water Treatment Plant in the Bronx, New York City. One of the major issues co
Jan 1, 2012
-
OFR-8-77 Effects Of Temperature And Humidity Variations On The Stability Of Coal Mine Roof Rocks - I. Introduction - A. Statement Of The ProblemBy Charles D. Haynes
Outside air for ventilating coal mines in Alabama varies considerably in both temperature and moisture content during the year. Alternate condensation and evaporation of the moisture on mine roofs may
Jan 1, 1975
-
Data Evaluation for Sustainable Development IndicatorsBy S. Möllerherm
"The evaluation of data and information provided by the existing traditional indicators in sustainability assessments is most important. Therefore the Institute of Mining Engineering I from the RWTH A
Jan 1, 2005
-
Increasing Grinding Circuit Robustness with Advanced Process ControlBy A Rantala, K Aberkrom, O Haavisto, P Blanz
More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits
Sep 7, 2015
-
Technical Note - Increased value of refined high sulfur coalBy P. R. Dugan
Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute
Jan 8, 1987
-
RI 4806 The Thermodynamics Of Combustion Gases: General ConsiderationsBy Jr. Brinkley
For a theoretical description of power plants that derive their energy from the combustion of a fuel, it is necessary to solve, to an appropriate degree of precision, a hydrodynamic problem that requi
Jan 1, 1951
-
Environmental Issues: Still Clouded in UncertaintyBy Michael Stanwood
Project feasibility no longer involves just technical and economic viability-today's feasibility study must include environmental, regulatory, and political considerations as well. While the US n
Jan 1, 1981
-
Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building ? SynopsisBy Martin J. Kenwright
Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi
Jan 1, 2000
-
Emerging Steel And Specialty Steel Grades And Production Technologies ? Impacts On The Selection And Use Of FerroalloysBy R. Dippenaar
The emergence of new steel grades is largely driven by the need to produce high quality steel at a competitive price. The principal aims are to attain ultra-high purity, (especially low interstitial e
Jan 1, 2004
-
Mineral Resource Assessment of the Coromandel Region, New ZealandBy D N. B Skinner, R L. Brathwaite, M S. Rattenbury
The Institute of Geological and Nuclear Sciences Ltd has carried out a mineral resource assessment of the Coromandel region, one of the most mineral-rich regions of New Zealand. The assessment focusse
Jan 1, 2001
-
The grate-kiln induration machine - history, advantages, and drawbacks, and outline for the futureBy J. C. Ion, O. Isaksson, J. Stjernberg
Iron ore pellets are a preferred feedstock for ironmaking. One method used for pelletizing is the grate-kiln process, first established in 1960.During the past decade, the establishment of new grate-k
Jan 1, 2015
-
Technical Papers and Notes - Extractive Metallurgy Division - Sinter Roasting of Lead-Rich Galena Concentrates at the Electrothermic Lead Plant of the Ronnskar Works, SwedenBy K. G. Gorling, S. J. Wallden, N. B. Lindvall
It is the policy of The Metollurgical Society to provide, in the TRANSACTIONS OF THE METALLURGICAL SOCIETY OF AIME, a prompt and accurate medium for publication of reports of significant new research
Jan 1, 1959
-
Thermophilic Mineral Bioleaching Performance: A Compromise Between Maximizing Mineral Loading And Maximizing Microbial Growth And ActivityBy A. Sissing
Paper written on project work carried out in partial fulfilment of M.Sc. (Chemical Engineering) degree Thermophilic bioleaching, conducted at temperatures in excess of 65°C, provides considerable b
Jan 1, 2003