Search Documents

  • NIOSH
    OFR-213-83 Slack And Overload Rope Protection System

    By Holt L. Farley

    This report describes the development of an electronic system which detects unsafe slack and overload conditions in underground mine hoist ropes. The Slack and Overload Rope Protection System (SORPS)

    Jan 1, 1983

  • DFI
    A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven Piles

    By Franklin M. Grynkewicz

    The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d

    Jan 1, 1991

  • CIM
    Capital Cost Estimating for Mineral Processing Plants

    By R. J. Balfour, T. L. Papucciyan

    "INTRODUCTIONCapital Cost considerations are basic to feasibility in the achievement of success for Mineral Processing Projects as much as or more than in many other industries. Capital cost is an imp

    Jan 1, 1972

  • SME
    NATM Design For Stanford Linac Coherent Light Source Tunnels

    By Jonathan Taylor, Irwan Halim, Frederick (Rick) Vincent

    The new underground facilities for the LINAC Coherent Light Source project at the Stanford Linear Accelerator Center in Menlo Park, CA, are constructed in very weak sedimentary rock interspersed with

    Jan 1, 2007

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • CIM
    How the Mining Industry is Responding to Pressures for Change in the Management of Mine Waste

    By Don Welch

    Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc

    May 1, 2010

  • NIOSH
    OFR-164-83 Evaluation Of Bulkheads For Radon Control

    By Clifford H. Summers

    This report describes an experimental program which we conducted on behalf of the U. S. Bureau of Mines, to select from currently available materials two novel systems of construction for air-restrain

    Jan 1, 1982

  • DFI
    Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of Iraq

    By H. Meseck

    The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a

    Jan 1, 1989

  • AIME
    Reservoir Engineering – Laboratory Research - Linear Waterflood Behavior and End Effects in Water-Wet Porous Media

    By J. R. Kyte, L. A. Rapoport

    The material balance equation for partiai or complete 1:trter-drivc reser1,oir.s been re-arranged to include a pressure irrferferencr ternr. This pressure interfernce term was ohtained from the theo

  • SME
    Pillar Design and Coal Burst Experience in Utah Book Cliffs Longwall Operations

    Longwall mining has existed in Utah for more than half a century. Much of this mining occurred at depths of cover that significantly exceed those encountered by most other U.S. longwall operations. De

    Jan 7, 2020

  • SME
    Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut Tunnels

    By W. G. Brunner

    The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a

    Jan 1, 2007

  • SME
    The borehole monitoring experiment: field measurements of reservoir conditions and responses in longwall panel overburden during active mining

    By S. J. Schatzel

    In order to better understand the effects of longwall mining on the methane reservoir overlying the panel, the National Institute for Occupational Safety and Health/Pittsburgh Research Laboratory (NIO

    Jan 1, 2009

  • CIM
    Development of Barrick Gold’s Bulyanhulu Mine

    By John Frostiak

    "Kahama Mining Corporation Limited, a wholly owned subsidiary of Barrick Gold Corporation, poured the first dore bar and filtered the first concentrate produced at the Bulyanhulu mine on February 28,

    Jan 1, 2003

  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987

  • NIOSH
    OFR-128-83 Investigation Of The Mechanics Of Mine Acid Formation In Underground Coal Mine Drainage

    By Fraser M. Walsh

    The objective of this program was to determine by laboratory experiments the kinetics and mechanics of the reactions that produce acid in coal mine drainage. The program was divided into three phases:

    Jan 1, 1982

  • NIOSH
    IC 8673 Estimating Direct Costs Of Development In A Block Caving Mine

    By Nils A. Eilertsen

    This Bureau of Mines report describes the unit cost procedure for estimating direct development costs within a cave block in an undercut block caving mine. Costs of supervision, labor, equipment, and

    Jan 1, 1975

  • CIM
    Achieving a Great Start-Up: Action Plan to Maximise Your Chances of Success

    By S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier

    "The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well

    Jan 1, 2016

  • CIM
    Regional geochemical mapping for earth science and environmental studies

    By R. B. Barlow, J. A. C. Fortescue

    Originally developed for use in mineral exploration, regional geochemical mapping based on stream (and lake) sediment sampling is showing broader application in other areas of the earth sciences and i

    Jan 1, 1980

  • DFI
    Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History

    By Gregory A. Stephan

    A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is

    Jan 1, 2003

  • DFI
    Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored Piles

    By Ramdane Bahar

    "Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t

    Jan 1, 2014