    Stability Mapping To Examine Ground Failure Risk: A Field Study At A Limestone Mine (b0d73e07-1fdd-41b0-ab9e-b3e15e89a17e)

    As the surface reserves are being depleted, more and more stone operators are seeking underground mining options. Stability of underground openings is a major concern for the safety and productivity.

    Jan 1, 2009

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • SME-ICGCM
    New Developments In Headed Rebar Ground Support (e1369dc5-cd64-41ac-8b6d-861d8d628824)

    By Roland C. Walker

    Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging

    Jan 1, 2009

  • SME-ICGCM
    Pillar Reinforcement or Rib Support?

    By André C. Zingano

    The coal pillars in room-and-pillar mining method are subjected to vertical stress due to overburden rock mass and horizontal stress relieve due to entries excavation around them. Some coal mining com

    Jan 1, 2006

  • SME-ICGCM
    Practical Strata Management, Beltana No. 1 Mine, Australia

    By Shane McDonald

    Australia produces approximately 84 million tonnes of coal per annum from 30 longwalls in New South Wales and Queensland, operating at an average depth of around 300m. Industry trends and expectations

    Jan 1, 2008

  • SME-ICGCM
    Application of Neuro?Fuzzy Technique in Mine Support System for Ground Control

    By Sudhir Kumar Kashyap

    In underground activities ground control is a challenging problem. It affects safety, production, and efficiency. As per statistics of accident data, ?fall of roof/sides? is one of the major causes of

    Jan 1, 2012

  • SME-ICGCM
    German-Chinese Cooperation in the Field of Mining Subsidence Engineering

    By Axel Preusse

    Mining subsidence plays an increasing important role in the Chinese hard coal mining. Reasons for this are a substantial rise of production during the last decade, a dense settlement in many mining

    Jan 1, 2007

  • SME-ICGCM
    Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall Recovery

    By Bill Stormes

    This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and

    Jan 1, 2008

  • SME-ICGCM
    Coal Mine Ground Control in Western Europe; Past, Present and Future

    By D. N. Bigby

    This paper concentrates on ground control innovation in Europe since the first Morgantown conference, mainly from a UK perspective. In particular, it describes the rock engineering and ground control

    Jan 1, 2006

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • SME-ICGCM
    Post?Collapse Seismicity of the Crandall Canyon Mine Using Double Difference Relocations

    By Tex M. Kubacki

    In 2007, the University of Utah Seismograph Stations (UUSS) temporarily expanded its seismic monitoring network in Emery County, Utah, in response to the August 6 Crandall Canyon mine collapse that tr

    Jan 1, 2012

  • SME-ICGCM
    Quality Assurance in the Processing of Mining-Induced Subsidences and Research Work Into Mining Subsidence Engineering in the German Hard Coal Industry

    By Peter Fischer

    Between 45,000 and 50,000 claims for subsidence are submitted each year to the German hard coal industry. In order to improve the service to claimants a quality management was established in 2005. Thi

    Jan 1, 2006

  • SME-ICGCM
    In-Situ Testing Of Roofex Yielding Rock Bolts In Coal Ribs (d7c8f4cb-6d76-4845-93df-11dd74a1d904)

    By Sean Harvey

    One of the manifestations of the dynamically induced failures in deep coal mines is the violent ejection of coal from the ribs. A possible protection against such failures is the use of a specificall

    Jan 1, 2009

  • SME-ICGCM
    Strata Movement of Protective Seam Mining with Large Interburden ?? A Case Study

    By Changsheng Song

    With increasing depth of coal mining in China, the number of coal and gas outbursts has been increasing for years. By means of destressing the protective seam, the gas in the protected seam is drained

    Jan 1, 2008

  • SME-ICGCM
    The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, Australia

    By Kieran Black

    The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has

    Jan 1, 2007

  • SME-ICGCM
    Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical Approach

    By Rajagopala Reddy Kallu

    After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo

    Jan 1, 2007

  • SME-ICGCM
    Mining Through In-panel Entries and Full-face Recovery Room Without

    By John Smyth

    Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,

    Jan 1, 1998

  • SME-ICGCM
    Innovation in Rock Mechanics: Iced Tailings As Structural Backfill for the Citronen Mine, Ironbark Zinc Ltd., Greenland

    By Andrew P. Schissler

    The Citronen Zinc-Lead Project is one of the world?s largest undeveloped zinc-lead resources, containing more than 13 billion pounds of zinc and lead metal. The project is located in northern Greenlan

    Jan 1, 2012

  • SME-ICGCM
    Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)

    By Brian R. A. Wood

    Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t

    Jan 1, 1992