Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons Corner

    By John Rudolf

    Metropolitan Washington Airport Authority is currently undertaking the first Phase of Metro?s Extension to Northern Virginia. A wide range of tunnel options was considered for the Tysons Corner segmen

    Jan 1, 2008

  • SME
    Imaging Of Minerals, Ores And Related Products To Determine Mineral Characteristics (62b10345-9d28-4191-957f-3c363fe80798)

    By W. Petruk

    Imaging is a fundamental requirement when characterizing minerals, ores and related products. Images are used for presentation, texture analysis, characterization, image analysis, identification, etc

    Jan 1, 2001

  • SME
    A Case Study of Geological Characterization of Co-rich Ferromanganese Crusts over a Giant Guyot "Takuyo No.5," the Northwestern Pacific

    By H. Sato, B. Thornton, K. Nishi, A. Usui

    "Northwestern Pacific submarine seamounts are believed to be future marine mining areas of ferromanganese crusts, which contain hi-tech industrial metals, such as Co, Ni, Te, Ti, Pt, and REEs. The Tak

    Sep 1, 2014

  • SME
    Relationship Between Bond Work Index And Textures And Cooling Method Of Granulated And Cooled Ferronickel Refining Slags

    By D. Richter

    The Pyrometallurgical refining stage of ferronickel manufacturing produces a slag rich in iron and nickel, which is usually further processed for metal recovery. The recovered material is returned to

    Jan 1, 2011

  • SME
    Nuclear Energy Industry – Past, Present and Future

    By James J. Graham

    Uravan, Ambrosia Lake, Gas Hills and South Texas are all historic names in US uranium. These mining areas supplied the uranium that brought the United States into the nuclear age during the 1960s, an

    Jan 1, 2002

  • SME
    Longwall Mining Helps Consol Boost Productivity

    Ten years ago, only 3% of Consol's underground coal production resulted from using the longwall mining method. Today, that figure has grown to 45% and has helped the Pittsburgh-based concern fuel

    Jan 11, 1983

  • SME
    An Improved Hydrometallurgical Route For Tellurium Production

    By A. Robles-Vega

    In recent years, tellurium has been extensively used in the manufacture of semiconductor materials. For this type of application, high-purity tellurium is required. Selenium, lead and silicon are usua

    Jan 1, 2009

  • SME
    Flocculation Dewatering Of Phosphatic Clay

    By D. Tao, R. Honakey, B. K. Parekh

    The dewatering of stable phosphatic clay suspensions generated from phosphate beneficiation in the central Florida is an issue of practical and theoretical importance. Because of its tiny particle si

    Jan 1, 2006

  • SME
    Convection Mechanisms For Geothermal Heat Exchangers In A Vertical Mine Shaft

    By R. Thornton

    Montana Tech is located in the historic mining town of Butte, MT and is adjacent to the Orphan Boy mine. This abandoned underground mine will be the heat source for a down-hole heat exchanger (DHE)/he

    Feb 27, 2013

  • SME
    Selective Froth Recovery (SFR) System To Increase Flotation Recovery

    The SFR system utilizes a skimmer or extractor placed at or near the slurry-froth interface where there is a higher concentration of valuable mineral particles. With assistance of hydrocyclones, it is

    Jan 1, 2012

  • SME
    San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield

    By Brett Campbell

    The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa

    Jan 1, 2008

  • SME
    East Side Access project taking shape beneath the streets of Manhattan

    Beneath some of New York?s most iconic buildings ? The Met Life Building, the Helmsley Building, the Waldorf Astoria ? crews are busily at work on the Metropolitan Transportation Authority?s long-awai

    Jan 3, 2010

  • SME
    Effect Of Agglomeration Binders On The Copper Solvent Extraction Process

    By K. A. Lewandowski

    Binders have been suggested as an aid for agglomeration to improve copper recovery in heap leaching operations. However, it has not been established if the use of binders would negatively affect the s

    Jan 1, 2009

  • SME
    Experimental Study Of Residence Time Distributions Of Ball-Mill Circuits Grinding Coal-Water Mixtures

    By K. Shoji

    Residence time distributions (RTDs) were estimated by water tracing in a number of wet overflow ball mills (diameters 0.38 to 4.65 m) producing dense, coal-water slurries. In open-circuit mills of 0.3

    Jan 1, 2008

  • SME
    Computer Modeling For Improved Production Of Mechanical Excavators

    By L. Ozdemir, M. Cigla

    This paper presents and discusses some of the computer models developed and currently used at the Earth Mechanics Institute (EMI) of the Colorado School of Mines (CSM). These include the performance m

    Jan 1, 2000

  • SME
    Eight To Be Inducted Into National Mining Hall of Fame

    The National Mining Hall of Fame will hold its 13thAnnual Induction Banquet during MINExpo International 2000 in Las Vegas, NV. The gala black-tie (optional) event will honor eight legendary leaders

    Jan 1, 2000

  • SME
    Refractory Copper Ore From Nchanga, Zambia: A Materials Characterization Study

    By O. N. Sikazwe

    The Nchanga Cu-Co ore deposit of the Zambian Copperbelt, is hosted in Neoproterozoic siliciclastic-carbonate sedimentary rocks, and it consists of two orebodies: the Lower Orebody (shale) and the Uppe

    Jan 1, 2008

  • SME
    Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

    By J. Davies

    This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long

  • SME
    Collapse and Remining of Tunnel TO8 at THSRC Contract C230

    By William Stewart, John Tinkler, Gary B. Hemphill

    Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels rangin

    Jan 1, 2005

  • SME
    Ground Motion Characteristics in an Underground Burst-Prone Coal Mine

    Coal bursts are one of the least understood yet the most critical hazards in underground coal mines. The ground motions induced by seismic events can trigger unstable failure of coal and rock mass and

    Jan 7, 2020