Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Influence of Rock Mass Properties on Performance of Hard Rock TBMs

    By Jamal Rostami, Richard Kastner, Ahmad Ramezanzadeh

    Improving the accuracy of the performance prediction models for hard rock Tunnel Boring Machines (TBMs) is important in estimation of the schedule and cost of tunnelling in related projects. The effec

    Jan 1, 2005

  • SME
    Are Long TBM Tunnels Faster by TBM?

    By Nick Barton

    A recent analysis of 145 TBM tunnels of more than 1000km total length has helped to quantify the time dependence of utilization (U). In fact U = Tm, where T is time in hours and m is a negative gradie

    Jan 1, 2001

  • SME
    Back Injury Control Measures For Manual Lifting And Seat Design (713e5a18-b501-4cad-ba17-ce99f61f5c68)

    By S. Gallagher, A. Mayton

    Introduction The mining industry has long been associated with a high incidence of low back disorders and pain (Klein et al. 1984, Leigh and Sheetz 1989, Brinckmann et al. 1998). It is believed th

    Jan 1, 2007

  • SME
    Mixed Face Tunnel Jacking with a Grillage

    By J. E. Bernick, J. Davies

    This paper describes the design and construction of a 22.86 m (75 ft) long jacked tunnel, which was successfully installed, despite difficult mixed face conditions at Metro-North’s Westport Station, i

    Jan 1, 2005

  • SME
    Rapid Excavation Using Trackless Technique

    By S. P. Lewis, R. L. Sundeen

    Most of us are aware of the ever increasing use of underground space. At the Advisory Conference on tunneling in Washington, D. C. in June of 1970, the demand for construction oriented tunneling durin

    Jan 1, 1974

  • SME
    Suggested and Prescriptive Means and Methods—Are They Really in the Owner’s Interest?

    By Gary Almeraris, Vincent Jr Tirolo

    Traditionally, “Means and Methods” were the sole responsibility of Contractors. However, because of a number of litigious projects in the 1970s, Owners and their Engineers began including Suggested Me

    Jan 1, 2005

  • SME
    Methods For Removing Arsenic From Aqueous Systems

    By L. R. Moore

    Arsenic is among the list of major contaminants in mining aqueous waste streams. Though the elemental form is toxic, the aqueous oxyanions are more so. The most common forms of arsenic released duri

    Jan 1, 2012

  • SME
    Development Of A Percussion Assisted Rotary Drilling System For Blasthole Drilling

    By J. W. Langford

    A more effective method of fracturing and chipping the formation is necessary to significantly increase the productivity of blasthole drilling with a roller cone bit. The conventional rotary blasthole

    Jan 1, 2011

  • SME
    Egnatia Odos! 60 Miles of Mountainous Road Tunnels in Northern Greece, Europe

    By G. Aggistalis, N. Kazilis, C. Rawlings, N. Rachaniotis, S. Raptopoulos, M. Knights, R. Game

    The Egnatia Odos (Odos meaning road) is one of Greece’s largest ever highway construction projects and one of Europe’s most important. The Highway will assist in the connection of the Greek Ionian/Adr

    Jan 1, 2005

  • SME
    Synthesis Of Monolithic Si2n2o Ceramic From Reclaimed Silicon And Desert Sand

    By M. Radwan, S. Shimada, S. Z. El-Tawil, K. A. El-Barawy, Y. Miyamoto

    This study presents the results of synthesizing monolithic siliconoxynitride, Si2N2O, ceramic from a mixture composed of reclaimed silicon and natural desert sand by using the nitriding combustion syn

    Jan 1, 2004

  • SME
    Are Nanoparticulates Present In Typical Mineral Processing Practices And Can They Be Suppressed?

    By C. R. Copeland

    Airborne dust emission standards are receiving growing attention. This trend is motivated by significant health studies that have shown adverse health effects due to exposure to dust. Currently, the a

    Jan 1, 2007

  • SME
    WEMCO/LEEDS Flotation Column Development

    By John B. Sabey, Vernon R. Degner

    The industrial coal processing trend toward greater fines production, due to mining techniques and customer requirements for reduced ash and sulphur content in the fine coal product, is the basis for

    Jan 1, 1988

  • SME
    Metallurgical Development And Design For The Pascua Lama Project

    By R. A. Williams

    The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is

    Jan 1, 2001

  • SME
    Selected Factors Affecting Longwall Mine Layouts In The Pittsburgh Coalbed Of Southwestern Pennsylvania

    By A. Iannacchione

    Longwall mining began within the Pittsburgh coalbed of Pennsylvania (PA) in the early 1970?s. Originally, longwall mine layouts were designed to fit within existing room-and-pillar operations, where

    Feb 27, 2013

  • SME
    Development Of Experimental Procedures To Analyze Copper Agglomerate Stability

    By K. A. Lewandowski

    The efficiency of heap leaching is reduced by poor solution flow characteristics (i.e., channeling and ponding) that result from fines migration. Agglomeration of the ore can immobilize fines, but for

    Jan 1, 2008

  • SME
    Experiences And Projections On Sag Mill Multivariable Predictive Control

    By R. Fuenzalida

    Since 2007, a number of Multivariable Predictive Control (MPC) Applications have been implemented on SAG mills, among others, within the Kairos Mining Concentrator Automation Program using ?Profit Con

    Jan 1, 2012

  • SME
    Mill Head Castings - Educating Opinions - Preprint 09-023

    By V. Svalbonas

    Everybody has an opinion what the quality of a grinding mill head casting should be, yet extremely few take the time, or get the opportunity, to compare their opinions against fitness-for-purpose data

    Jan 1, 2009

  • SME
    The Río Agrio Basin, Argentina: A Natural Analog To Watersheds Affected By Acid Mine Drainage

    The Río Agrio of northern Patagonia, Argentina, is highly acidic due to inputs of volcanic gases (SO2, HCl, HF) in its headwaters. The watershed includes a hyper-acidic (pH <0.5) volcanic crater lake,

    Jan 1, 2008

  • SME
    The Kensico–City Tunnel for New York City Water Supply

    By Robert J. F. Goodfellow, William A. T. Meakin, Kevin Clarke, Eric Cole

    INTRODUCTION New York City Water Supply—Background and History Since the 1840s New York City has been developing the largest, and perhaps, the best urban water supply and distribution system in

    Jan 1, 2005

  • SME
    Forecasting The Number Of Fatal Injuries In Underground Coal Mines

    By S. K. Oraee

    Most management decisions at all levels of the organization are as directly or indirectly depends on the circumstance of future. With regard to predict the future events in the process of decision-mak

    Jan 1, 2011