Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests ProceduresBy Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
Metro Sports Facility – A Ground Improvement Case StudyBy I. D. McPherson, Dominic P. Mahoney
The Metro Sports Facility is currently under development in Christchurch, New Zealand and is a key Anchor Project in the city’s post-earth quake recovery. When completed it will be largest indoor spor
Nov 1, 2022
-
Behavior of Instrumented Deep Anchored and Strutted Diaphragm Wall in Soft RockBy Amr Al Degwe, Walid Jaber
"INTRODUCTIONNSCC International Ltd. carried out the enabling works and constructed the foundation system for the Emirates Pearl Tower and Bab El Qasr Hotel in Abu Dhabi. Emirates Pearl Tower is a joi
Jan 1, 2017
-
Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in MalaysiaBy Chandrasegaran, Tamilmani
"This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part
Jan 1, 2015
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
The Importance Of Tension Softening (Of Concrete) In Modelling Of Tension PilesBy Qingwei Joshua Ong
Tension piles, also known as uplift or anchor piles, are necessary to resist uplift forces that might cause structural distress. In excavation projects, most uplift forces are developed because of hyd
Nov 1, 2022
-
Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing ProgramBy William Billiet
"The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp
Jan 1, 2017
-
Evaluation of Elongation Criteria and Friction Loss in Ground AnchorsBy John P. Turner, Benjamin J. Turner
"This report describes a research project for evaluating the applicability of the widely accepted 80 percent criterion for elongation of ground anchors to anchors with unbonded lengths exceeding 100 f
Jan 1, 2017
-
Performance of Cement Deep Mixing Method in 2011 Tohoku EarthquakeBy Shoji Higashi, Nobuhiro Honda, Takeo Asanuma, Tatsuo Nagatsu, Masaki Kitazume, Sachihiko Tokunaga, Shigeru Kubo, Hidenori Takahashi, Tsuneyasu Onishi, Yoshiyuki Morikawa
"Various kinds of civil engineering structures and facilities were seriously damaged in the earthquake in Tohoku and Kanto regions of Japan on 11 March 2011 due to the greatness of its magnitude. In c
Jan 1, 2015
-
State-of-the-Art Rock Socket Analysis and Design for Laterally Loaded Drilled ShaftsBy Aly Mohammad, Dongyi Yue
"The design of rock sockets for drilled shafts and piles proves to be a challenge for the Design Engineer. The magnitude of loads on the shaft and the behavior of the rock are critical in determining
Jan 1, 2005
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test DataBy Mahdi Soudkhah, Akhter Hossain
Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri
Jan 1, 2019
-
Design And Performance Evaluation Of A Grouting Program In Weak Rock MassesBy George Moses K, Mahendran K
Grouting is performed in rock masses in order to increase its strength properties and also to reduce the seepage. In the design of underground structures such as tunnels or caverns located in weak roc
Nov 1, 2022
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Drawdown of Ground Water Control System in Deep Excavation Surrounded by Cutoff Walls: Numerical InvestigationBy Dalia. R. Mohamed, Hisham H. Hafez, Marawan M. Shahien
"Construction activities in major projects that involve deep excavations necessitate the use of vertical walls surrounding the construction site to play an important role as earth retention system. Th
Jan 1, 2016
-
Load and Resistance Factor Design – Past, Present and FutureBy Silas C. Nichols, Jennifer E. Nicks
"Limit states design (LSD), or load and resistance factor design (LRFD), is a method to account for the uncertainty in loads and resistance through a reliability calibration that requires all applicab
Jan 1, 2015
-
Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years LaterBy Karl A. Higgins
In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages
-
Helical Pile Foundations at Tangier Island SubstationBy Jeff Wilkinson, Brandon Walter
"A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp
Jan 1, 2017