Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Estimation of Shaft and Base Responses from Pile Load Test

    By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran

    "Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc

    Jan 1, 2017

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988

  • DFI
    Time-Dependent Bond Regain In Driven Piles In Permafrost ? Synopsis

    By B. Ladanyi

    The design philosophies for piles in unfrozen and frozen soils are compared, and their similarities and differences are underlined. It is shown that in frozen soils, the long term behavior of a pile i

    Jan 1, 2010

  • DFI
    Resistance Factors For Lateral Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely used as foundation system for sound walls to resist lateral loads. The design method based on the ultimate lateral capacity, such as Broms method, is often used for sound wal

    Jan 1, 2007

  • DFI
    Doyle Drive - Extreme Pile Installation

    By Peter Faust

    The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha

    Jan 1, 2011

  • DFI
    111,000m Of Continuous Flight Auger Piling For LNG Tank Bases In Poor Alluvial Soils, Isle Of Grain, UK

    By Shane Baker

    Cementation Foundations Skanska Ltd encountered many significant challenges in designing and constructing the foundations for the LNG (Liquefied Natural Gas) tanks and associated structures at the Isl

    Jan 1, 2006

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • DFI
    Ground Freezing For Shoring Of Excavations - A Case History: 1405/SR522 Vault NW-6

    By Daniel Mageau

    Ground freezing has been used for over 100 years to provide shoring and ground water cutoffs for hundreds of projects worldwide, including drilled shafts, tunnels and cofferdams. Typically, these case

    Jan 1, 1998

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • DFI
    Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary

    By Roy A. Bell

    A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet

    Jan 1, 1997

  • DFI
    Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37

    By Gordon Chen

    The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the

    Jan 1, 2009

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • DFI
    Vibration Environmental Effect Of Construction Operations - Synopsis

    By Mark R. Svinkin

    Construction vibrations may be harmful to adjacent and remote structures, sensitive instruments and people. Construction vibration sources have a wide range of energy, displacement, velocity and accel

    Jan 1, 2000

  • DFI
    Contact Pressure Characteristics Beneath Deep Foundation Of Beijing International Hotel ? Synopsis

    By X. L. Huang

    This paper deals with the experimental and theoretic study of the contact pressure beneath the deep foundation of Beijing International Hotel, The experiments have been carried out in project and in m

    Jan 1, 2010

  • DFI
    Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction

    By Peter Florian

    At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning

    Jan 1, 1993

  • DFI
    Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s

    Jan 1, 2014

  • DFI
    A Tale of Two Dams: Performance of Deep Cutoff Walls

    By Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders

    "This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv

    Jan 1, 2017

  • DFI
    Centrifuge Modeling of Temperature Effects on the Pullout Capacity of Energy Piles in Clay

    By John S. McCartney, Ismaail Ghaaowd

    This study presents the results from centrifuge modeling experiments performed to understand the effects of temperature changes on the pullout capacity of scale-model energy piles embedded in normally

    Jan 1, 2018

  • DFI
    Ground Improvement By Cement Grouting Combines With Pipe Piles In Bridge Construction - Summary

    By Peter White

    A bridge reconstruction project involved driving pipe piles for the new foundations. Disturbances within soil layers at depth caused sinkholes to open up within the construction site. After a near fat

    Jan 1, 1997

  • DFI
    Business Benefits Of An Integrated CFA Rig Instrumentation System

    By Jason N. Scott

    CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi

    Jan 1, 2006