Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2008
-
DFI 2008 Outstanding Project Award Winner Intricate Excavation for the New South Ferry Subway StationBy Alice Arana, David M. Cacoilo, Joel L. Volterra
"To make space for the new South Ferry Station in lower Manhattan, engineers and contractors carved out a new tunnel beneath three operating subway tunnels and tangentially to yet another tunnel. Crea
Jan 1, 2008
-
Environmentally Friendly Geothermal Piles At Keble College, Oxford, UKBy Tony P. Suckling
This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct
Jan 1, 2002
-
Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground ConditionsBy Emad Farouz
This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan
-
San Francisco-Oakland Bay Bridge: OPA WinnerBy Gerry Houlahan
"The 2015 Outstanding Project Award (OPA), which recognizes the superior work of DFI members, was awarded for the San Francisco- Oakland Bay Bridge New East Span. The award was presented to representa
Jan 1, 2015
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro ProjectBy Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
"The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica
Jan 1, 2017
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab
-
Ground Freezing Combined Method for Urban Tunnel ExcavationBy Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto
"The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three
Jan 1, 2015
-
The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?By Manfred Schoepf
"Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import
Jan 1, 2015
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Risk Management and Ground Improvement Technologies in the Case of LiquefactionBy Sebastian Fischer, Rolf Katzenbach, Steffen Leppla
"The risk management in the case of liquefaction is one of the most serious and also difficult issues in geotechnical engineering because failure caused by liquefaction is always a sudden failure with
Jan 1, 2015
-
Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well TechnologyBy Paul Suver
The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing co
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Lateral Load Tests on Step Tapered Bored Piles in Calcareous SandsBy Nabil F. Ismael, Mohamed El Deeb
"The behavior of laterally loaded step tapered bored piles in calcareous sand was examined by field tests. Lateral load tests were carried out on straight and step tapered bored piles 5.3 m long embed
Jan 1, 2005
-
Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown MicropilesBy M. Meckkey El Sharnouby
In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und
Jan 1, 2011
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Doyle Drive – Extreme Pile InstallationBy Peter Faust
"The south access road to San Francisco’s Golden Gate Bridge, known as Doyle Drive or Presidio Parkway, needs to be replaced. Built in 1936, it is the primary highway and transit linkage through San F
Jan 1, 2012
-
Construction Of A Spillwall In The Columbia RiverBy Francis B. Gularte
The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw
Jan 1, 2010