Challenges Associated with the Construction of a Cofferdam – A Case Study
By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017
-
Bore Pile Stabilization Issues in Offshore Marine Works
By Nuno Cruz, Saúl Rodríguez
"When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work
Jan 1, 2017
-
Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? Background
By Colin C. West
On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p
Jan 1, 1987
-
Skilled Operative Training For The Foundation Industry - Summary
By Geoffrey Birch
A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski
Jan 1, 2000
-
New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor
By Helen D. Robinson
The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope
Jan 1, 2008
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication
By Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Pile Design For Offshore Structures Subjected To Subsidence
By Juan J. Campo
The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15
Jan 1, 1992
-
Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The Eurocodes
By Niels Krebs Ovesen
Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer
Jan 1, 1994
-
Deep Jet Grouting Grids for Support of a 42-Story Tower Designed Using Performance-Based Seismic Design
By Scott A. Walker, Roberto A. Lopez, Lori A. Simpson, David A. Shook
500 Folsom Street is part of the new Transbay neighborhood in San Francisco, which is being redeveloped after the 1989 Loma Prieta Earthquake damaged a freeway viaduct; removal of the viaduct created
Jan 1, 2018
-
Design & Construction Of Pile Foundations For A Building Complex - A Case History
By S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part One
By Christian Divis
[ ]
Jan 1, 2002
-
Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?
By Bernard Hertlein
¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser
Jan 1, 2001
-
Recent Experiences With Bi-Directional Static Load Testing
By M. England
Keywords: Bi-directional tests, Osterberg cell, O-cell®, static load tests, Timeset® Static load testing, where loads are applied vertically to the top of the pile and often referred to as 'to
Jan 1, 2006
-
Soil Grouting to Arrest Foundation Settlement
By Anuj K. Singh, Shuvranshu Rout, Manos De
"Foundation for tracks of coke transfer car and dust extraction pipe was designed as series of isolated foundations spaced at 11.0m along length of coke oven battery resting on soil at depth of 2.5m.
Jan 1, 2017
-
Practical Experiences On Pile Dynamic Measurement In Shanghai - Synopsis
By J. Pei
The studies of dynamic measurements using stress wave theory has commenced in China. This paper introduces some practical experiences using "CASE method" in Shanghai showing applications of dynamic me
Jan 1, 2010
-
Anchoring Tall Buildings In Lower Manhattan
By Andrew Pontecorvo
The design of foundations for the tall buildings of lower Manhattan rely on the use of high capacity, rock anchors to resist overturning forces generated by lateral loads from wind, earth, water and,
Jan 1, 2011
-
Deep Mixing Method: A Global Perspective
By Donald A. Bruce
Various types of contemporary Deep Mixing Method (DMM) techniques have been used in the United States since 1986. Such techniques owe their origins to Japanese and Scandinavian developments, which beg
Jan 1, 1998
-
Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing
By Rolf Katzenbach
Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we
Jan 1, 2007
-
Pile Load Test Results For Highway 280 Pile Uplift Test Site
By Douglas Brittsan
This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar
Jan 1, 1993
-
Economic Foundation Design For Tall Buildings
By Frances Badelow
This paper describes a design process for piled raft foundations supporting high-rise buildings. The design process comprises an initial stage of geotechnical site characterization using the results o
Jan 1, 2006