Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design of the Pierina Waste DumpBy P. Mark. Hawley
Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa
May 1, 2002
-
Matching laboratory and plant performance - a case study of the Elura lead circuit, Pasminco Australia LimitedBy M. C. Pietrobon
"A common problem in assessing the applicability of laboratory flotation data is determining how closely conditions during laboratory testing of the ore matches those that occur in a plant. Typical la
Jan 1, 2002
-
Pneumatic Flotation Technology an Interesting Experience in the Chilean Mining IndustryBy Flavio Rojos-Tapia, Samuel Sánchez-Pino, Marcelo Fernández-García, Samuel Sánchez-Baquedano, Rainer M. Imhof
"Pneumatic flotation was introduced to the Chilean copper mining industry in 1993 by Ingeniería de Minerales S.A., being implementation in 1994/95. The technology is based on the designs and developme
Jan 1, 2003
-
Expansion and Progress of Electrical ProspectingBy H. Lundberg
Introduction The world has been suffering from an excessive production of all kinds of raw materials, and the metals and petroleum are no exception. As a consequence, at the moment, the urge to find
Jan 1, 1931
-
Variable speed SAG millingBy M. N. Brodie
"The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to
Jan 1, 2003
-
The Installation and Operation of Heap Leaching Test FacilitiesBy J. Maheu
Heap leaching is an old technique for the recovery of copper, but a fairly new technique for the recovery of gold.The paper outlines the equipment required for the establishment of heap leaching test
Jan 1, 1982
-
The Development of Process Mineralogy at Falcon Bridge Limited, and Application to the Raglan MillBy Norman O. Lotter, Lori Kormos, Greg J. Wilkie, Peter J. Whittaker, Johannes S. Stickling
"Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This
Jan 1, 2002
-
FLAC Simulation of Split-Pipe Tests on an Instrumented Cable BoltBy Marc Ruest
A new instrumented cable bolt has been developed by the National Institute for Occupational Safety and Health at the Spokane Research Laboratory in Spokane, WA. Although various instruments are availa
May 1, 2002
-
Evolution of Direct Coupled Pinion Drive Technology for Grinding MillsBy K. Lim, J. Sobil, L. Galarza Castillo, F. Tozlu
"For mining operations globally, the scale and criticality of the grinding mill drive has meant that selection of the correct mill drive technology is paramount. With so much depending on the successf
Jan 1, 2016
-
Evidence of an iron-gold corrosion cell during the Zadra pressure elution of loaded carbonBy C. Taschereau, G. A. Vickell, A. R. Laplante
Evidence in support of an iron-gold corrosion cell during the high-temperature/highpressure elution of loaded carbon is presented herein including, but not limited to, its discovery, mode of genesis,
Jan 1, 2006
-
Subaqueous Deposition of Acid Generating Tailings into an Acidic Lake Environment: Pilot Column Test ResultsBy Linda C. M. Elliot, Liangxue Liu
"The deposition of tailings under water is considered to be one of the most environmentally promising and potentially cost effective methods to reduce or eliminate acid mine drainage from tailings. On
Jan 1, 1997
-
Advantages of Tailing Disposal by Thickened DischargeBy E. I. Robinsky
"This paper describes a new, proven approach for tailing disposal. Not only is the disclosed system less damaging to the environment, it is also less costly to operate, to close down and maintain in p
Jan 1, 1976
-
Applying a Customer-Based Approach at Vale’s Clarabelle MillBy A. Taylor, J. Shelegey, H. Sullivan, J. Doucet
"Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in
Jan 1, 2012
-
Including In-Process Inventories in the Metal Accounting of Flotation Plants"Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br
Jan 1, 2014
-
The Effects of Nuggety Gold on Gold Deportment – Lessons from Beaton Creek Paleo-Placer Gold Project, AustraliaBy Mark McComb, Geoffrey R. Lane
"Over the years many differing approaches have been developed to clearly understand the nature, mode of occurrence, associations and deportment of both free-milling and refractory gold in a wide varie
Jan 1, 2015
-
Rejection of Uranium from a Copper Gold Ore by Flotation (1d1c391d-4ab9-408d-ad31-42faa02f60e9)By F. Ford, J. Dong
"Laboratory and miniplant testwork was carried out to reject uranium from an Iron Oxide Copper Gold (IOCG) deposit that contains an average of 60-70 ppm uranium with high variability. The dominate cop
Jan 1, 2017
-
Implementation of Paste Backfill at the Williams MineBy Eric Konigsmann, Doug Spence, Scott Jones
"The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope
Jan 1, 2004
-
Integrated Operations for Maximizing ResultsBy D. Schleiss
Reduced access to knowledgeable workers is creating challenges for operations. We are doing more 4D Operations - dirty, dull, dangerous, and distant. Personnel costs in these environments are high, an
Jan 1, 2014
-
In Pit Crushing & Conveying in hard rock applications Todays? challenges ? future?s chancesBy Andreas Oberrauner
Content ? What is? an introduction ? Crushing technology ? Conveying in pits ? Pit-exiting strategies ? Mine Planning in IPCC ? Summary/Conclusions EHS slide ? Sandvik?s objective is zero harm
Aug 1, 2013
-
The Design, Commissioning and Operation of the Golden Giant Paste Backfill PlantBy Jim Dodd, Jim Paynter
"We would like to acknowledge the efforts of the following key people who helped to make this project a success.Ron Jung, instrumentation supervisor for the Golden Giant Mine, spent many hours reviewi
Jan 1, 1997