Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geology of the Churchill Copper Deposit

    By J. M. Carr

    The history, geological setting and local geology of the Magnum vein system, 100 miles west of Fort Nelson in northeastern British Columbia, are described. The system comprises a number of quartz-anke

    Jan 1, 1971

  • CIM
    The Blake River Group, Rouyn-Noranda Area, Quebec: A Stratigraphic Synthesis

    By Marc R. Laflèche, Suzanne Paradis, A. Shirley Péloquin, Harold L. Glbson, Robin Potvin, Pierre Verpaelst

    "The Archean Blake River Group is best known from a central volcanic complex in Rouyn-Noranda. This volcano-tectonic depression, delimited by the Hunter Creek fault to the north and the Horne Creek fa

    Jan 1, 1990

  • CIM
    Mining Methods and Practices at Lake Shore

    By Leslie S. Weldon

    THE Lake Shore mine has been developed by two vertical shafts, with level intervals at 200 feet to the 2200 level and at 125 feet below this horizon. A main cross-cut joins the two shafts on all level

    Jan 1, 1936

  • CIM
    The Co-Fe-S System

    By W. Curlook, L. M. Pidgeon

    THE PURPOSE of this investigation was to study part of the ternary system Co-Fe-S. Jensen ( 1) established the solubility limits of sulphur in pyrrhotite. The compound with 61.7 per cent Fe, correspon

    Jan 1, 1953

  • CIM
    Develop Calcium Carbide Reductant for Inco Multi-Purpose Vessels

    By A. Warczok

    Chalcocite concentrate obtained by magnetic separation and flotation of Bessemer matte is processed in the Inca top blowing bottom stirring MK reactor into semi-blister copper. The semi-blister is the

    Jan 1, 2007

  • CIM
    The Victor Project ? Ontario?s First Diamond Mine

    Agenda ? Where?s Victor ? What work was done to get approval to spend $982m ? a brief history ? Some project facts ? The triple bottom-line accomplishments to date ? Construction A Brief History

    May 1, 2006

  • CIM
    Recycling of Aluminum Alloy by Direct Convertion Method of Cutting Chips and its Mechanical Properties

    By H. Mindivan

    In the present study, the feasibility of recycling AA6061 Al alloy chips by a combination of ciyomilling, cold compaction and hot extrusion processes was investigated. Furthermore, the effect of Al po

    Jan 1, 2011

  • CIM
    The Mechanism of Chalcopyrite Leaching in Acidic Ferric/Ferrous Sulfate Media in the Presence of Silver-Enhanced Pyrite

    By D. B. Dreisinger, D. G. Dixon, G. Nazari

    "The kinetics of chalcopyrite leaching in acidic ferric/ferrous sulfate media under atmospheric conditions in the presence of pyrite has been investigated. It has been found that pyrite samples from d

    Jan 1, 2012

  • CIM
    Behaviour of Oil Sands Fines-Sand Mixture Tailings

    By A. R. Sorta, D. C. Sego

    ABSTRACT The settling, shear strength, and index properties of oil sands fines-sand mixture tailings (FSMT) for a wide range of solids and fines content are investigated. Results indicate that the liq

    Jan 1, 2013

  • CIM
    The Application of the Induced Polarization Method at Brenda Mines, British Columbia

    By D. K. Fountain

    "High metal prices and advanced technology in open-pit mining methods have resulted in considerable interest in the development of large, low-grade mineral deposits. Brenda Mines Limited is presently

    Jan 1, 1968

  • CIM
    Numerical Investigation of Seismic Events Associated With Hydraulic Fracturing

    By M. B. Dusseault, A. Pirayehgar

    "There is concern that hydraulic fracturing (HF) near an existing critically stressed fault could trigger slip and generate a seismic event of significance. To this end, a mathematical discontinuum mo

    Jan 1, 2015

  • CIM
    Production Performance Optimization - Significant Production Gain with Limited Investment

    By P. Mageau-Béland, È. -M. Proulx, M. -C. Patoine

    Over the past six decades, Hatch has helped several industrial processing facilities in debottlenecking their operations, allowing them to produce more with the same equipment, to reduce and even elim

    Jan 1, 2016

  • CIM
    The Winnipeg Market for Alberta Coal

    By George R. Pratt

    Although the title of this paper focuses attention to the Winnipeg coal market the following remarks should be considered applicable not only to conditions in Winnipeg but to the whole western coal in

    Jan 1, 1925

  • CIM
    A New Approach to Accessing Gold in Arsenopyrite

    By R. Barbaroux, J. -M. Lalancette, D. Lemieux, K. Nasrallah, G. Garcia Curiel

    "Arsenic released from the lithosphere by mining and metallurgical activities is a growing global environmental concern. Dundee sustainable technologies (“DST”) has developed a processing technology t

    Jan 1, 2017

  • CIM
    Highwall mining technology— A review of current status and design methods

    By N. R. Thote, J. L. Porathur, C. P. Verma

    Highwall mining is a highly mechanized coal mining method associated with several advantages, such as a very high production rate (approximately 3,000 t/d) and low production costs. There is no requir

    Jan 1, 2014

  • CIM
    The Ecstall Story: The Open-Pit Mine

    By George C. Coupland

    "THE PRELIMINARY EVALUATION of the orebodies was computerized for tonnages and grades on a 20- by 20-ft grid. The evaluation was based on drill-core intersections over 40-ft vertical projections coinc

    Jan 1, 1974

  • CIM
    Modelling of Emissions from Electric Arc Furnaces

    By Viraj Parekh, Kinnor Chattopadhyay, Sina Mostaghel, Xiao Zhang

    Electric arc furnace steelmaking is a dominant approach in North America and controlling EAF emissions is a key issue today because of stringent permit limits imposed by various regulatory bodies. In

    Jan 1, 2015

  • CIM
    Till Geochemistry in Areas of Thick Drift and its Application to Gold Exploration, Matheson Area, Northeastern Ontario

    By M. B. McClenaghan

    "Abstract- The Ontario Geological Survey completed a regional till sampling project between 1984 and 1988 in the Black River Matheson (BRiM) area of northeastern Ontario. The project was designed to a

    Jan 1, 1994

  • CIM
    Atlantic Continental Margin -its History, its Future

    By G. H. Long, D. H. Magnusson

    THE DEFINITION of the continental margin, as considered in this paper, is in the broad sense: " ... those provinces of the continents and of the oceans which are associated with the boundary between t

    Jan 1, 1970

  • CIM
    Meadowbank Mine: Environmental Challenge North of 60

    By Stéphane Robert

    This document presents estimates of future "total cash cost per ounce" and "minesite cost per tonne" that are not recognized measures under United States generally accepted accounting principles ("US

    May 1, 2011