Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Paste Backfill Production Using Canmet's Silo Technology

    By A Annor, L J. Chen

    The production of paste backfill has typically been accomplished through the adaptation of existing technology. Thickeners and disc filters have several drawbacks when applied to production of tailing

    Jan 1, 1998

  • AUSIMM
    The Hydrogeochemical Characterisation of an Unsaturated Waste Rock Pile, Key Lake, Saskatchewan, Canada

    By L Smith, R Beckie

    Controls on environmental loading from acid rock drainage (ARD) are not well understood in waste rock material. In particular, relationships between subsurface flow and the timing, duration, and inten

    Jan 1, 2003

  • AUSIMM
    Use of Simulation to Support Mining Industry Operators

    By Harper B

    The mining industry has developed a comprehensive view of the need to have production personnel well trained in the use and maintenance of mining equipment. A strong commitment from the industry to th

    Jan 1, 1998

  • AUSIMM
    Comparison of Acid Production From Pyrite and Jarosite

    By M Berndt

    Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt

    Jan 1, 2003

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992

  • AUSIMM
    Design of Hydraulic Backfill Distribution Systems - Lessons From Case Studies

    By D Gericke, R Cooke

    This paper presents an assessment of the status in design and operation of deep level backfill distribution systems by referring to case studies and practical experience. The improvements in design an

    Jan 1, 1998

  • AUSIMM
    The selection, commissioning, and evaluation of a large diameter, variable speed ball mill at Bougainville Copper Limited

    By Clark G

    The latest addition to the grinding circuit at Bougainville Copper Limited is another 5.5m by 7.3m primary mill (No.13). The mill can operate in a primary or secondary mode. Its distinguishing fea

    Jan 1, 1986

  • AUSIMM
    Economic and Environmental Constraints on Use of South Island Resources for Power Generation

    Since the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated

    Jan 1, 2003

  • AUSIMM
    Copper Leaching at Gunpowder

    By G D. Richmond, J C. Chomley

    Copper has been mined intermittently at Gunpowder, north of Mount Isa, since 1927. Most ventures have had some initial success but fluctuating copper prices, the small-scale of the operations and the

    Jan 1, 1998

  • AUSIMM
    HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuit

    By E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso

    Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour

    Sep 18, 2023

  • AUSIMM
    The Occurrence of Telluride Minerals at Kalgoorlie

    Incidental to the progress of a geological survey of the Kalgoorlie goldfield during 1927-28 a number of specimens of telluride minerals were obtained, chiefly with the help of Mr. F. G. Brinsden, gen

    Jan 1, 1931

  • AUSIMM
    Big Bell Coming Back for Seconds, Thirds and Fourths

    In October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t

    Jan 1, 1998

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    The Application of Seperate Conditioning to Improve Zinc Metallurgy at Woodlawn Mines

    By Phelan JM

    Poor selectivity in the separation of two sulphides generally arises because the flotation characteristics of the coarse sizes of the valuable mineral and finer sizes of non-valuable minerals are id

    Jan 1, 1988

  • AUSIMM
    Tectonic History of the Palaeozoic Broken River Province, North Queensland

    By Lang SC

    The Broken River Province, in the northern part of the Tasman Orogen, is divided into the Camel Creek and Graveyard Creek Subprovinces. In the Late Cambrian to Early Ordovician, and again in the Late

    Jan 1, 1990

  • AUSIMM
    The Diesel Electric and Compressed Air Central Power Plant of Western New South Wales Electric Power Pty. Ltd.for the Broken Hill Mines

    Broken Hill is situated at an elevation of approximately 1000 ft. above sea-level, on the Barrier Ranges, in the State of New South Wales, Australia. It is approximately 700, 280 and 330 miles from th

    Jan 1, 1932

  • AUSIMM
    Process Integration and Optimisation - A Case Study in Productivity Improvement

    By J Col, D La Rosa, W Valery, A Jankovic

    Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and

    Jan 1, 2007

  • AUSIMM
    Modelling Cohesion and Adhesion of Wet, Sticky Iron Ores in Discrete Element Modelling for Material Handling Processes

    By K Williams, T Donohue, W Chen, T Roessler, A Katterfeld

    Wet sticky iron ore poses particular difficulties in every aspect of the material handling process. Material hang-ups in bins, pipes and chutes; carry-back and spillage due to insufficient belt cleani

    Jul 13, 2015

  • AUSIMM
    Final Session

    The seminar had its origins in an Inquiry into the Box Flat Disaster and one of the conclusions from this Inquiry was that there should be a better dissemination of technical knowledge and the res

    Jan 1, 1973

  • AUSIMM
    Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metals

    By J H. Park, R R. Kim, H S. Park, H J. Kim

    This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce

    Jun 19, 2024