Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Paste Backfill Production Using Canmet's Silo TechnologyBy A Annor, L J. Chen
The production of paste backfill has typically been accomplished through the adaptation of existing technology. Thickeners and disc filters have several drawbacks when applied to production of tailing
Jan 1, 1998
-
The Hydrogeochemical Characterisation of an Unsaturated Waste Rock Pile, Key Lake, Saskatchewan, CanadaBy L Smith, R Beckie
Controls on environmental loading from acid rock drainage (ARD) are not well understood in waste rock material. In particular, relationships between subsurface flow and the timing, duration, and inten
Jan 1, 2003
-
Use of Simulation to Support Mining Industry OperatorsBy Harper B
The mining industry has developed a comprehensive view of the need to have production personnel well trained in the use and maintenance of mining equipment. A strong commitment from the industry to th
Jan 1, 1998
-
Comparison of Acid Production From Pyrite and JarositeBy M Berndt
Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt
Jan 1, 2003
-
Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)By Medhurst TP, Trueman R, Hutchinson IN
A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed
Jan 1, 1992
-
Design of Hydraulic Backfill Distribution Systems - Lessons From Case StudiesBy D Gericke, R Cooke
This paper presents an assessment of the status in design and operation of deep level backfill distribution systems by referring to case studies and practical experience. The improvements in design an
Jan 1, 1998
-
The selection, commissioning, and evaluation of a large diameter, variable speed ball mill at Bougainville Copper LimitedBy Clark G
The latest addition to the grinding circuit at Bougainville Copper Limited is another 5.5m by 7.3m primary mill (No.13). The mill can operate in a primary or secondary mode. Its distinguishing fea
Jan 1, 1986
-
Economic and Environmental Constraints on Use of South Island Resources for Power GenerationSince the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated
Jan 1, 2003
-
Copper Leaching at GunpowderBy G D. Richmond, J C. Chomley
Copper has been mined intermittently at Gunpowder, north of Mount Isa, since 1927. Most ventures have had some initial success but fluctuating copper prices, the small-scale of the operations and the
Jan 1, 1998
-
HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuitBy E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso
Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour
Sep 18, 2023
-
The Occurrence of Telluride Minerals at KalgoorlieIncidental to the progress of a geological survey of the Kalgoorlie goldfield during 1927-28 a number of specimens of telluride minerals were obtained, chiefly with the help of Mr. F. G. Brinsden, gen
Jan 1, 1931
-
Big Bell Coming Back for Seconds, Thirds and FourthsIn October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
Application of Ground Penetrating Radar to Testing Tunnel IntegrityBy J Karlovšek
Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m
Mar 8, 2011
-
The Application of Seperate Conditioning to Improve Zinc Metallurgy at Woodlawn MinesBy Phelan JM
Poor selectivity in the separation of two sulphides generally arises because the flotation characteristics of the coarse sizes of the valuable mineral and finer sizes of non-valuable minerals are id
Jan 1, 1988
-
Tectonic History of the Palaeozoic Broken River Province, North QueenslandBy Lang SC
The Broken River Province, in the northern part of the Tasman Orogen, is divided into the Camel Creek and Graveyard Creek Subprovinces. In the Late Cambrian to Early Ordovician, and again in the Late
Jan 1, 1990
-
The Diesel Electric and Compressed Air Central Power Plant of Western New South Wales Electric Power Pty. Ltd.for the Broken Hill MinesBroken Hill is situated at an elevation of approximately 1000 ft. above sea-level, on the Barrier Ranges, in the State of New South Wales, Australia. It is approximately 700, 280 and 330 miles from th
Jan 1, 1932
-
Process Integration and Optimisation - A Case Study in Productivity ImprovementBy J Col, D La Rosa, W Valery, A Jankovic
Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and
Jan 1, 2007
-
Modelling Cohesion and Adhesion of Wet, Sticky Iron Ores in Discrete Element Modelling for Material Handling ProcessesBy K Williams, T Donohue, W Chen, T Roessler, A Katterfeld
Wet sticky iron ore poses particular difficulties in every aspect of the material handling process. Material hang-ups in bins, pipes and chutes; carry-back and spillage due to insufficient belt cleani
Jul 13, 2015
-
Final SessionThe seminar had its origins in an Inquiry into the Box Flat Disaster and one of the conclusions from this Inquiry was that there should be a better dissemination of technical knowledge and the res
Jan 1, 1973
-
Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metalsBy J H. Park, R R. Kim, H S. Park, H J. Kim
This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce
Jun 19, 2024