    The Application of Advanced Undercutting at PT Freeport IndonesiaÆs Deep Ore Zone Mine

    By A Sinuhaji, R Poedjono, G Flumerfelt

    PT Freeport Indonesia is currently building the DOZ mine. It is a 25 000 tonne/day block caving operation which is scheduled to reach designed production levels by the fourth quarter of 2002. This pap

    Jan 1, 2002

  • AUSIMM
    The Evolution of Block Caving Technology

    By A J. Weston

    Block or panel caving technology is far removed from that of the top slicing and block caving of the late nineteenth or early twentieth centuries. The rapid mechanisation and expansion of these method

    May 9, 2016

  • AUSIMM
    Going beyond design at Newmont Boddington Gold

    By K Blay, C McCamley, P Petrucci

    The Newmont Boddington Gold (NBG) processing plant was designed for 35Mt/y with ball mills expected to deliver a combined new mill feed rate of 4837 tonnes/hr. Since beginning commercial production in

    Aug 29, 2018

  • AUSIMM
    Project Hobson – New Technology in Auckland

    By T Ireland

    The Project Hobson tunnel excavation was the first use in New Zealand of an earth pressure balance (EPB) tunnel boring machine (TBM). The tunnelling on the project was very successful and break-throug

    Mar 8, 2011

  • AUSIMM
    Staurolite Product Development

    By S Benson

    Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is

    Jan 1, 2001

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    Geometallurgy – Beyond Conception

    By L O’Connor, S C. Dominy

    "Geometallurgy is an important addition to any evaluation project or mining operation. As a discipline, it seeks to maximise the net present value (NPV) of an orebody while minimising technical and op

    Jun 15, 2016

  • AUSIMM
    Technology change by regulation – a cresting wave?

    By J D. Pease, J M. I Tuppurainen, P D. Munro

    This paper examines how legislation and regulation can be external drivers of technical change in mineral processing and extractive metallurgy and how the industry can respond. Two examples are consid

    Sep 11, 2017

  • AUSIMM
    Internalising Ecological Costs in Evaluating and Planning a Mining Project

    By Q Wang

    Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co

    Sep 26, 2011

  • AUSIMM
    The Simple Facts about Sampling Gold Ores

    By T Day, I G. Robertson, G J. Lyman

    "Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a

    Oct 10, 2016

  • AUSIMM
    Selective Flotation of Chalcopyrite and Pyrite from a Mixed Copper Mineral Concentrate under Controlled Redox Potential Conditions

    By I Ametov, S Harmer, R Alford

    A process that allows selective flotation separation of low Cu/S ratio minerals (chalcopyrite and pyrite) from high Cu/S ratio minerals (bornite and chalcocite) from a mixed copper mineral concentrate

    Sep 1, 2014

  • AUSIMM
    Distribution of impurity elements in oxygen-enriched top-blowing nickel smelting with Fe extraction-oriented slag adjustment

    By Y Cui, G Cao, H Zong, J Zheng, J Wang, S Yue, J Zhao, B Li

    The iron (Fe) concentration in nickel slag is high, making its recovery and utilisation a hot and challenging topic. In the nickel smelting process, using CaO instead of SiO2 to adjust slag’s composit

    Jun 19, 2024

  • AUSIMM
    Terranes, Tectonics and the Pacific Rim

    The movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th

    Jan 1, 1990

  • AUSIMM
    The Mt Kasi high sulphidation Au system, Fiji

    By Taylor GP

    Mt Kasi in Fiji is a high sulphidation style of gold deposit exposed at a high crustal level. Individual alteration centres are localised at the intersection of cross structures within a through-going

    Jan 1, 1994

  • AUSIMM
    The Direct Outokumpu Nickel Smelting (DON) Process and the Harjavalta Expansion

    By MattelmSki M

    Outokumpu Harjavalta Metals Oy has been producing nickel since 1962, based on conventional flash smelting technology followed by electrowinning of nickel. In the 1980s, a research project was initia

    Jan 1, 1996

  • AUSIMM
    Developing dephosphorisation technique for iron ore with reductionprocess

    By K Higuchi, K Saito, O Ishiyama

    Iron ore in Australia is predicted to increase in its phosphorus content in the near future, which is detrimental to properties of steel product. Steelmakers are concerned by the content of phosphorus

    Sep 18, 2023

  • AUSIMM
    Sources of Sampling Error and Implications for Quality Assurance and Quality Control in Surface and Underground Reverse Circulation Drilling

    By J T. Carswell, K Sutton

    Quality control (QC) of reverse circulation drill sampling commonly involves regular duplicate subsampling to monitor the extent of imprecision or random error in the subsampling system. In gold minin

    Jul 29, 2014

  • AUSIMM
    Heterogeneity, Sampling Errors and the Nugget Effect in Gold Ores - Implications for Evaluation, Exploitation and Extraction

    Sampling errors result from heterogeneities within the lot under study. Within a rock mass in situ heterogeneity results in the geological nugget effect, which accounts for most of the natural variabi

    Aug 1, 2010

  • AUSIMM
    Rock Bolts for Permanent Tunnel Lining

    By J de Witte

    When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i

    Mar 8, 2011

  • AUSIMM
    Integrated multi-disciplinary auditing and benchmarking of catastrophic hazards for underground mining operations

    By A R. Penney

    Safety management, both personal and that associated with catastrophic hazard, helps to define the success of mining companies. Personal safety management, often categorised by slips, trips and falls,

    Mar 29, 2023