Search Documents

  • AIME
    Analysis Of Risk Sharing

    By C. Richard Tinsley

    INTRODUCTION The economic analysis (Chapter 3), the engineering studies (Chapter 10), the credit structure (and the consequential funding sources) - Chapter 11, and the overall feasibility structur

    Jan 1, 1985

  • AIME
    Papers - Age-hardening - Some Developments in High-temperature Alloys in the Nickel-cobalt-iron System (With Discussion)

    By G. P. Halliwell, C. R. Austin

    The investigation described in this paper deals with the development of high-temperature alloys of the Konel series over a considerable period of time at t,he Research Laboratories of the Westinghouse

    Jan 1, 1932

  • CIM
    Narrow Vein Mining with PCFTM

    By Stephen G. Downs

    PCF?, or Penetrating Cone Fracture, is a propellant-based technique for rock excavation, which has significant potential for the mechanization of narrow-vein mining. The technique is currently being d

    Oct 1, 2001

  • CIM
    K-Ar and Rb-Sr dating and the genesis of tungsten at the Clea tungsten skarn property, Selwyn Mountains, Yukon Territory

    By K. M. Tompson, R. L. Armstrong, C. I. Godwin

    "Tungsten skarn deposits on the Clea property in the Selwyn Mountains, Y. T., are related genetically to a quartz monzonite stock, about 500 metres in diameter at the surface. Lower Paleozoic sediment

    Jan 1, 1980

  • IMPC
    Mössbauer Investigation on the Formation of Fe-containing Minerals in Coal during Gasification

    By F. B. Waanders

    Coal, as energy resource, possesses numerous characteristics and properties which all have an influence on its gasification behaviour. The two properties considered as critically important when evalua

    Jan 1, 2014

  • SME
    Mathematics Of Mine Sampling III Whither Geostatistics?

    By Robert F. Shurtz

    This paper suggests that pre-occupation with the random process model notised by geostatisticians may result in neglect of more promising techniques, especially since the random process model does not

    Jan 1, 1980

  • ABM
    Cisdi-green Eaf

    By Huang Qiming

    The CISDI-GreenEAF innovatively applies the top-side-chute for charging for improving the cold zone of electric-arc furnace (EAF) requiring preheating scrap. It can greatly reduce the operating power

    Oct 30, 2017

  • SME
    Sound Transit Link Light Rail Northern Extension

    By Paul M. Godlewski, Joseph P. Gildner, David S. McAllister

    With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill

    Jan 1, 2005

  • NIOSH
    OFR-122(3)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume III - Appendix A - Equipment List, Specifications And Quotations - Areas 8 - 25 ? Intro

    This appendix contains the list of equipment, their corresponding number and their specifications with the quotations from the vendors/ manufacturers who can supply this equipment. The listings are ar

    Jan 1, 1979

  • SME
    Continuous Haulage Systems For Computer-Assisted Continuous Miner PREPRINT NUMBER 90-152

    By S. K. Bhatt

    This paper reviews major developments in continuous haulage technology for underground coal mines. Haulage systems, both in use and development, are investigated through a comprehensive literature sea

    Jan 1, 1990

  • NIOSH
    OFR-110(1)-76 Review And Evaluation Of Current Training Programs Found In Various Mining Environments; Volume I, Summary

    By J. Adkins

    This document presents a description of the results of a project aimed at producing a broad description of current mining training programs and an evaluation of their effectiveness with respect to red

    Jan 1, 1976

  • SME
    Teamwork, Technology Key in Rescuing Coal Miners

    By Steve Kral

    The dramatic rescue of nine Pennsylvania coal miners trapped nearly 90 m (300 ft) underground for77 hours probably would not have happened without the high technology equipment and improved mine rescu

    Jan 1, 2002

  • AUSIMM
    Roasting and Treatment of Auriferous Flotation Concentrates (c643336f-22ff-4a6c-9e00-d8ab21688bb0)

    R. C. BUCKETT (Lake View and Star Limited) : At the outset I should like to add my congratulations to those already extended to Mr..Norwood on his excellent paper, which has given us all an inspiratio

    Jan 1, 1940

  • NIOSH
    Open-Cut Metal Mining - Introduction

    By E. D. Gardner

    This bulletin, which discusses open-cut mining at the metal mines of the United States, is the last of a series of such papers by the Bureau of Mines describing the principal methods of mining.4 Open

    Jan 1, 1941

  • AIME
    Diesel Engines Versus Steam Turbines for Mine Power Plants

    By H Haas

    H. HAAS, San Francisco, Cal. (communication to the Secretary?). -Fig. 1 plainly shows that the comparison of the steam-turbine and Diesel-engine plants was made on a basis of 6,000 kw. continuous oper

    Jan 5, 1917

  • AUSIMM
    Draw Parameters and Reserve Estimation using PC-BC at the E26 Block Cave Mine, Northparkes NSW

    By Secis R

    Northparkes Mines is located 27 km northwest of Parkes in central west New South Wales. The E26 deposit is the largest of all defined to-date in the area, containing over 50 per cent of Northparkes&

    Jan 1, 1997

  • CIM
    Metallogenic Concepts in Gaspé

    By R. Marleau, R. Assad, J. Dugas

    "A study of the geological features of known occurrences of mineralization in Gaspe is the basis for a classification. Nickel, chromite, asbestos and some copper are pre-or syn-Taconic, whereas the mo

    Jan 1, 1969

  • CIM
    Evaluating the Effect of Seeding on Zinc Recovery through the Zincor Iron Removal Circuit

    By Jochen Petersen, Diane Taggart

    "At an average of 90.3% (for the period of 1 January 2009 to 30 September 2011), Zincor’s zinc recovery was well below the industry standard of 96%. The losses through the residues, in particular the

    Jan 1, 2016

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • AIME
    Reservoir Engineering- Laboratory Research - Effect of Cleavage Rate and Stress Level on Apparent Surface Energies of Rocks

    By W. W. Krech, T. E. Perkins

    As fractures are propagated through rocks, energy is absorbed near the extending crack tip. Apparent surface energies for several rocks have been measured by cleavage under dynamic con-ditions. At nom

    Jan 1, 1967